# VECTOR PIPELINE, L.P. — Notice of Amendment

**Citation:** CPF 320121002M  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2012-03-19

CLOSED notice of amendment citing 192.13(c), 192.605(a), 192.605(b)(1), 192.605(b)(4), 192.615(a)(3)(i), 192.615(a)(4), 192.615(b)(1), 192.617.

## Document text

Notice of Amendment involving VECTOR PIPELINE, L.P.. PHMSA's enforcement data identifies the cited regulations as 192.13(c),  192.605(a),  192.605(b)(1),  192.605(b)(4),  192.615(a)(3)(i),  192.615(a)(4),  192.615(b)(1),  192.617. The case was opened on 2012-03-19 and is reported as closed as of 2012-11-06. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320121002M_Closure_11062012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320121002M/320121002M_Closure_11062012.pdf

320121002M_Closure_11062012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320121002M/320121002M_Closure_11062012_text.pdf

320121002M_NOA_03192012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320121002M/320121002M_NOA_03192012.pdf

320121002M_NOA_03192012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320121002M/320121002M_NOA_03192012_text.pdf

320121002M_Operator Response to NOA_04172012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320121002M/320121002M_Operator%20Response%20to%20NOA_04172012.pdf

320121002M_Closure_11062012_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
November 6, 2012
Mr. Mark Maki
Sr. Vice President
Vector Pipeline, L.P.
1100 Louisiana
Suite 3300
Houston, TX 77002
CPF 3-2012-1002M
Dear Mr. Maki:
On August 15-18, October 24-27, 2011 and January 16-18, 2012, representatives of the
Michigan Public Service Commission (MI-PSC) acting as an interstate agent for the Pipeline
and Hazardous Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49
United States Code inspected your facilities and the operation and maintenance procedures for
Vector Pipeline L.P. (Vector) at your offices in Griffith, IN. As a result of the inspection,
Vector Pipeline L.P. was issued a Notice of Amendment on March 21, 2012, which proposed
amendment of the procedures.
Vector Pipeline LP submitted its amended procedures on June 22, 2012, and again on October
23, 2012 and November 1, 2012. The MI-PSC along with my staff reviewed the amended
procedures and it appears that the inadequacies outlined in this Notice of Amendment have
been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank
you for your cooperation.
Sincerely,
David Barrett
Director, Central Region
Pipeline and Hazardous Materials Safety Administration

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/320121002M>
- Source ID: `phmsa-enforcement`
- SHA-256: `6d5e26ac006de99a8e13fafc217f7d525c6222a99fc064f9f02e025a2b6a1122`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T16:56:22.659Z
- Document slug: `phmsa-enforcement-320121002m`

### Source metadata

```json
{
  "cpf": "320121002M",
  "operator": "VECTOR PIPELINE, L.P.",
  "region": "Central",
  "pipelineType": "GAS INTERSTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.13(c)",
    "192.605(a)",
    "192.605(b)(1)",
    "192.605(b)(4)",
    "192.615(a)(3)(i)",
    "192.615(a)(4)",
    "192.615(b)(1)",
    "192.617"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "320121002M_Closure_11062012.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320121002M/320121002M_Closure_11062012.pdf",
      "bytes": 74180,
      "category": "agency_document"
    },
    {
      "name": "320121002M_Closure_11062012_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320121002M/320121002M_Closure_11062012_text.pdf",
      "bytes": 4763,
      "category": "agency_document"
    },
    {
      "name": "320121002M_NOA_03192012.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320121002M/320121002M_NOA_03192012.pdf",
      "bytes": 1489753,
      "category": "case_document"
    },
    {
      "name": "320121002M_NOA_03192012_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320121002M/320121002M_NOA_03192012_text.pdf",
      "bytes": 55506,
      "category": "case_document"
    },
    {
      "name": "320121002M_Operator Response to NOA_04172012.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320121002M/320121002M_Operator%20Response%20to%20NOA_04172012.pdf",
      "bytes": 359145,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "VECTOR PIPELINE, L.P."
}
```
