# COFFEYVILLE RESOURCES CRUDE TRANSPORTATION, LLC — Notice of Probable Violation

**Citation:** CPF 320125010  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2012-05-11

CLOSED notice of probable violation citing 195.452(f)(4), 195.452(f)(8), 195.452(h), 195.452(h)(4)(iii)(e).

## Document text

Notice of Probable Violation involving COFFEYVILLE RESOURCES CRUDE TRANSPORTATION, LLC. PHMSA's enforcement data identifies the cited regulations as 195.452(f)(4),  195.452(f)(8),  195.452(h),  195.452(h)(4)(iii)(e). The case was opened on 2012-05-11 and is reported as closed as of 2013-11-26. Proposed civil penalty: $84,700. Assessed civil penalty: $74,700. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320125010_Final Order_11132013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125010/320125010_Final%20Order_11132013.pdf

320125010_Final Order_11132013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125010/320125010_Final%20Order_11132013_text.pdf

320125010_NOPV PCP PCO_05112012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125010/320125010_NOPV%20PCP%20PCO_05112012.pdf

320125010_NOPV PCP PCO_05112012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125010/320125010_NOPV%20PCP%20PCO_05112012_text.pdf

320125010_Operator Response to Notice_06142012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125010/320125010_Operator%20Response%20to%20Notice_06142012.pdf

320125010_Final Order_11132013_text.pdf

NOVEMBER 13, 2013
Mr. John Lipinski
President
CVR Energy Incorporation
2277 Plaza Drive
Suite 500, Building B
Sugar Land, Texas 77479
Re: CPF No. 3-2012-5010
Dear Mr. Lipinski:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation and assesses a reduced civil penalty of $74,700. A partial payment of $40,500 was
received for Items 3 and 4 on June 8, 2012. The penalty payment terms are set forth in the Final
Order. This enforcement action closes automatically upon receipt of payment. Service of the
Final Order by certified mail is deemed effective upon the date of mailing, or as otherwise
provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Ms. Linda Daugherty, Central Region Director, OPS
Mr. Robert Haugen, Executive VP of Refining Operations, Coffeyville Resources Crude
Transportation, LLC, 2277 Plaza Drive, Suite 500, Building B, Sugar Land, Texas
77479
CERTIFIED MAIL - RETURN RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
Coffeyville Resources Crude ) CPF No. 3-2012-5010
Transportation, LLC )
)
Respondent. )
____________________________________)
FINAL ORDER
On April 25-29, 2011, pursuant to 49 U.S.C. § 60117, a representative of the Pipeline and
Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS),
conducted an on-site pipeline safety inspection of the Integrity Management Program (IMP) of
Coffeyville Resources Crude Transportation, LLC (Coffeyville or Respondent) in Bartlesville,
Oklahoma. In 2012, CVR Energy, Inc. formed a limited partnership, CVR Refining, LP, to own,
operate and grow its petroleum refining and related logistic businesses. CVR Refining’s
petroleum business includes Coffeyville which operates a 50,000-barrel-per-day, crude oil
gathering and trucking system located in Bartlesville and Wynnewood, Oklahoma, and Plainville
and Winfield, Kansas.1 The gathering system is comprised of more than 350 miles of company-
owned pipelines and associated tankage and truck transportation facilities.2
As a result of the inspection, the Director, Central Region, OPS (Director), issued to Respondent,
by letter dated May 11, 2012, a Notice of Probable Violation, Proposed Civil Penalty, and
Proposed Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the Notice
proposed finding that Coffeyville had violated 49 C.F.R. § 195.452 and proposed assessing a
civil penalty of $84,700 for the alleged violations. The Notice also proposed ordering
Respondent to take certain measures to correct the alleged violations.
Coffeyville responded to the Notice by letter dated June 14, 2012 (Response). The company
contested the allegations for Items 1 and 2 but not Items 3 and 4. Respondent also offered
additional information in response to the Notice and requested that the proposed civil penalty be
reduced or eliminated. Respondent did not request a hearing and therefore has waived its right to
one.
1 http://www.coffeyvillecrude.com/CVREnergyInc/(last accessed September 3, 2013).
2 http://www.cvrrefining.com/RefiningOperations/index html (last accessed August 31, 2013).



2
FINDINGS OF VIOLATION
The Notice alleged that Respondent violated 49 C.F.R. Part 195, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(f)(4), which states:
§ 195.452 Pipeline integrity management in high consequences areas.
(a) ….
(f) What are the elements of an integrity management program? An
integrity management program begins with the initial framework. An
operator must continually change the program to reflect operating
experience, conclusions drawn from results of the integrity assessments,
and other maintenance and surveillance data, and evaluation of
consequences of a failure on the high consequence area. An operator must
include, at minimum, each of the following elements in its written
integrity management program:
(4) Criteria for remedial actions to address integrity issues raised by
the assessment methods and information analysis (see paragraph (h) of this
section).
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(f)(4) by failing to establish
adequate criteria to determine remedial actions to address integrity issues raised by the
assessment and information analysis. Specifically, the Notice alleged that Coffeyville did not
perform sufficient verification and/or calibration activities for each of the 19 inline inspection
(ILI) runs performed on its pipelines. PHMSA also alleged that Coffeyville did not document
the size of the as-found anomalies to compare with ILI results to verify the accuracy of the ILI
tool.
In its Response, Coffeyville argued that its IMP procedures comply with the regulations because
the regulation does not include a standard for adequacy of remedial actions prompted by
assessment and information analysis. Further, Coffeyville argued that §195.452(f)(4) does not
require calibration digs or other verification activities, and Coffeyville’s Integrity Management
(IM) inspection protocol states, “an operator may implement a process by which called
anomalies are excavated so that tool results may be validated.”
While the regulations do not specifically require calibration digs, the cited provision requires that
operators have criteria established for and perform “information analysis.” In order to analyze
the information provided by the tool, the operator must have a way to verify its accuracy.
Operators typically analyze tool data through comparison of the anomaly as called by the tool
and the actual anomaly. Coffeyville did not provide any information about it how it complied
with the requirement that operators perform “information analysis.”
Furthermore, the IMP regulations provide PHMSA with the authority to determine the adequacy
of an operator’s processes and their implementation, and Respondent’s criteria were deficient in
defining how ILI tool error and tolerances were considered in the criteria for remedial actions.



3
Accordingly, after considering all of the evidence, I find that Respondent violated 49 C.F.R.
§ 195.452(f)(4) by failing to establish adequate criteria to address remedial actions and integrity
issues raised by the assessment methods and information analysis.
Item 2: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(f)(8), which states:
§ 195.452 Pipeline integrity management in high consequences areas.
(a) ….
(f) What are the elements of an integrity management program? An
integrity management program begins with the initial framework. An
operator must continually change the program to reflect operating
experience, conclusions drawn from results of the integrity assessments,
and other maintenance and surveillance data, and evaluation of
consequences of a failure on the high consequence area. An operator must
include, at minimum, each of the following elements in its written
integrity management program:
(8) A process for review of integrity assessment results and
information analysis by a person qualified to evaluate the results and
information (see paragraph (h)(2) of this section).
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(f)(8) by failing to have a
process for review of integrity assessment results and information analysis by a person qualified
to evaluate the results and information. Specifically, the Notice alleged that one of the integrity
management tasks addressed the qualification of individuals who review integrity assessments
and information analysis. During the inspection, Respondent could not demonstrate the training
or qualifications for its identified employees or the consultants who reviewed integrity results
and performed the analyses. Respondent did not provide documentation to substantiate that the
individuals had the necessary knowledge, skills and abilities to make recommendations on
remedial actions.
In its Response, Coffeyville argued that the ILI vendor was qualified and that Coffeyville’s
employees have decades of pipeline experience that should qualify them to review the integrity
assessment results. Respondent noted that Table 4.1 of Coffeyville’s IM Plan fully contemplates
the use of a consultant as part of the integrity management team. The identified task of
performing an inspection and preparing a report are assigned to the consultant. The identified
task of evaluating the inspection results is a shared responsibility between the consultant and the
Respondent’s pipeline maintenance foreman. Additionally, Respondent argued that the
regulation does not require documentation of the qualifications. Nonetheless, Coffeyville
included Table 4.1 with two employees and also listed consultants from TDW Pipeline Services
and Integrity Solutions, Ltd. as the persons qualified to review integrity assessment results and
develop remedial action plans. The Respondent also included the resumes and certificates
documenting work experience, education, and training of the listed personnel.
Respondent’s argument that the cited regulation does not require documentation of qualifications
conflicts with the requirements of § 195.452(l)(1)(ii). This provision requires that “documents to
support the decisions and analyses, including any modifications, justifications variances,



4
deviations, and determinations made . . .” be maintained for review during an inspection.
Documentation of personnel qualifications is necessary to support IMP actions to demonstrate to
PHMSA that decisions and analyses are performed by those with the requisite knowledge and
skill. Therefore, the qualifications of the personnel tasked to perform the analyses fall within the
scope of term "documents" as provided for in the regulation. Accordingly, after considering all
of the evidence, I find that Respondent violated 49 C.F.R. § 195.452(f)(8) by failing to have a
process for review of integrity assessment results and information analysis by a person qualified
to evaluate the results and information.
In its Response, Coffeyville did not contest the allegations in the Notice that it violated 49 C.F.R.
Part 195, as follows:
Item 3: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(h), which states:
§ 195.452 Pipeline integrity management in high consequence areas.
(a) ….
(h) What actions must an operator take to address integrity issues?
(4) Special requirements for scheduling remediation— (i) Immediate
repair conditions. An operator's evaluation and remediation schedule must
provide for immediate repair conditions. To maintain safety, an operator
must temporarily reduce operating pressure or shut down the pipeline until
the operator completes the repair of these conditions. An operator must
calculate the temporary reduction in operating pressure using the formula
in Section 451.6.2.2 (b) of ANSI/ASME B31.4 (incorporated by reference,
see § 195.3). An operator must treat the following conditions as
immediate repair conditions:
(C) A dent located on the top of the pipeline (above the 4 and 8
o’clock positions) that has any indication of metal loss, cracking or a
stress riser.
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(h) by failing to schedule an
immediate repair condition. Specifically, the Notice alleged that Coffeyville did not schedule
and repair three dents identified to be immediate repair conditions during review of ILI results on
September 8, 2008. Respondent did not contest this allegation of violation. Accordingly, based
upon a review of all of the evidence, I find that Respondent violated 49 C.F.R. § 195.452(h) by
failing to schedule an immediate repair condition.
Item 4: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(h)(4)(E), which states:
§ 195.452 Pipeline integrity management in high consequence areas.
(a) ….
(h) What actions must an operator take to address integrity issues?
(4) Special requirements for scheduling remediation--
(iii) 180-day conditions. Except for conditions listed in paragraph
(h)(4)(i) or (ii) of this section, an operator must schedule evaluation and
remediation of the following within 180 days of discovery of the



5
condition:
(E) An area of general corrosion with a predicted metal loss greater
than 50% of the nominal wall.
The Notice alleged that Respondent violated 49 C.F.R. § 195.452(h) by failing to schedule a
180-day condition. Specifically, the Notice alleged that Coffeyville did not schedule and
remediate three metal loss anomalies identified during review of ILI results from the
September 8, 2008 ILI assessment of the 4” Bartlesville to Caney River Trap segment.
Respondent did not contest this allegation of violation. Accordingly, based upon a review of all
of the evidence, I find that Respondent violated 49 C.F.R. § 195.452(h)(4)(iii)(E) by failing to
schedule a 180-day condition.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$100,000 per violation for each day of the violation, up to a maximum of $1,000,000 for any
related series of violations. In determining the amount of a civil penalty under 49 U.S.C.
§ 60122 and 49 C.F.R. § 190.225, I must consider the following criteria: the nature,
circumstances, and gravity of the violation, including adverse impact on the environment; the
degree of Respondent’s culpability; the history of Respondent’s prior offenses; the Respondent’s
ability to pay the penalty and any effect that the penalty may have on its ability to continue doing
business; and the good faith of Respondent in attempting to comply with the pipeline safety
regulations. In addition, I may consider the economic benefit gained from the violation without
any reduction because of subsequent damages, and such other matters as justice may require.
The Notice proposed a total civil penalty of $84,700 for the violations cited above.
Item 1: The Notice proposed a civil penalty of $22,100 for Respondent’s violation of 49 C.F.R.
§ 195.452(f)(4), for failing to establish adequate criteria to address remedial actions and integrity
issues raised by the assessment methods and information analysis. Respondent's failure to create
adequate criteria to address remedial actions due to integrity issues raised by the assessment
methods and information analysis could have threatened the integrity of the pipeline and high
consequence areas. Accordingly, having reviewed the record and considered the assessment
criteria, I assess Respondent a civil penalty of $22,100 for violation of 49 C.F.R. § 195.452(f)(4).
Item 2: The Notice proposed a civil penalty of $22,100 for Respondent’s violation of 49 C.F.R.
§ 195.452(f)(8), for failing to have a process for review of integrity assessment results and
information analysis by a person qualified to evaluate the results and information. Respondent
argued in its Response that it did not require documentation of such qualifications; however, as
discussed above, the regulations do require them. Nonetheless, since Respondent subsequently
provided proof of the qualifications for the personnel reviewing the integrity assessment results,
the civil penalty has been reduced. Accordingly, having reviewed the record and considered the
assessment criteria, I assess Respondent a civil penalty of $12,100 for violation of 49 C.F.R.



6
§ 195.452(f)(8).
Item 3: The Notice proposed a civil penalty of $22,100 for Respondent’s violation of 49 C.F.R.
§ 195.452(h)(4), for failing to schedule an immediate repair condition. Coffeyville neither
contested the allegation nor presented any evidence or argument justifying a reduction in the
proposed penalty. Respondent has already paid the civil penalty for Item 3. Accordingly, having
reviewed the record and considered the assessment criteria, I assess Respondent a civil penalty of
$22,100 for violation of 49 C.F.R. § 195.452(h)(4). A payment for this Item was received on
June 8, 2012.
Item 4: The Notice proposed a civil penalty of $18,400 for Respondent’s violation of 49 C.F.R.
§ 195.452(h), for failing to schedule a 180-day condition. Coffeyville neither contested the
allegation nor presented any evidence or argument justifying a reduction in the proposed penalty.
Respondent has already paid the civil penalty for Item 4. Accordingly, having reviewed the
record and considered the assessment criteria, I assess Respondent a civil penalty of $18,400 for
violation of 49 C.F.R. § 195.452(h)(4)(iii)(E). A payment for this Item was received on
June 8, 2012.
In summary, having reviewed the record and considered the assessment criteria for each of the
Items cited above, I assess Respondent a total reduced civil penalty of $74,700. A partial
payment of $40,500 was received for Items 3 and 4 on June 8, 2012.
Payment of the remaining civil penalty must be made within 20 days of service. Federal
regulations (49 C.F.R. § 89.21(b)(3)) require such payment to be made by wire transfer through
the Federal Reserve Communications System (Fedwire), to the account of the U.S. Treasury.
Detailed instructions are contained in the enclosure. Questions concerning wire transfers should
be directed to: Financial Operations Division (AMZ-341), Federal Aviation Administration,
Mike Monroney Aeronautical Center, P.O. Box 269039, Oklahoma City, Oklahoma 73125. The
Financial Operations Division telephone number is (405) 954-8893.
Failure to pay the remainder of the $74,700 civil penalty will result in accrual of interest at the
current annual rate in accordance with 31 U.S.C. § 3717, 31 C.F.R. § 901.9 and 49 C.F.R.
§ 89.23. Pursuant to those same authorities, a late penalty charge of six percent (6%) per annum
will be charged if payment is not made within 110 days of service. Furthermore, failure to pay
the civil penalty may result in referral of the matter to the Attorney General for appropriate
action in a district court of the United States.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Items 1 and 2 in the Notice for
violations of 49 C.F.R. §§ 195.452(f)(4) and 195.452(f)(8), respectively. Under 49 U.S.C.
§ 60118(a), each person who engages in the transportation of hazardous liquids or who owns or
operates a pipeline facility is required to comply with the applicable safety standards established
under chapter 601. The Director indicates that Respondent has taken the following actions
specified in the proposed compliance order:



7
1. With respect to the violation of § 195.452(f)(4) (Item 1), Respondent developed criteria to
determine remedial actions to address integrity issues raised by assessments and information
analysis, and reevaluate the most current assessment reports for all pipelines. The plan and
schedule, including a number of statistically established verification and/or calibration activities,
was submitted to the Central Region office.
2. With respect to the violation of § 195.452(f)(4) (Item 1), Respondent excavated any condition
that met the criteria for immediate conditions on all pipelines. Once exposed, each anomaly was
cleaned to sound metal and appropriate measurements were documented. If the anomalies
exceeded the predicted dimensions, the report was re-evaluated appropriately.
3. With respect to the violation of § 195.452(f)(8) (Item 2), Respondent had all personnel
reviewing integrity assessment results and information analysis trained and qualified in
accordance with the requirements of the Coffeyville IM Plan. The plan was submitted to the
Central Region that described training and qualifications required and a schedule of the proposed
training.
Accordingly, I find that compliance has been achieved with respect to these violations.
Therefore, the compliance terms proposed in the Notice are not included in this Order.
Under 49 C.F.R. § 190.215, Respondent has a right to submit a Petition for Reconsideration of
this Final Order. The petition must be sent to: Associate Administrator, Office of Pipeline
Safety, PHMSA, 1200 New Jersey Avenue, SE, East Building, 2nd Floor, Washington, DC
20590, with a copy sent to the Office of Chief Counsel, PHMSA, at the same address. PHMSA
will accept petitions received no later than 20 days after receipt of service of this Final Order by
the Respondent, provided they contain a brief statement of the issue(s) and meet all other
requirements of 49 C.F.R. § 190.215. The filing of a petition automatically stays the payment of
any civil penalty assessed. Unless the Associate Administrator, upon request, grants a stay, all
other terms and conditions of this Final Order are effective upon service in accordance with
49 C.F.R. § 190.5.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety

320125010_NOPV PCP PCO_05112012_text.pdf

NOTICE OF PROBABLE VIOLATION
PROPOSED CIVIL PENALTY
and
PROPOSED COMPLIANCE ORDER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
May 11, 2012
Mr. Robert Haugen
Executive VP of Refining Operations
Coffeyville Resources LLC
2277 Plaza Drive, Suite 500, Building B
Sugar Land, Texas 77479
CPF 3-2012-5010
Dear Mr. Haugen:
On April 25-29, 2011, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected your
Integrity Management Program in Bartlesville, Oklahoma.
As a result of the inspection, it appears that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and
the probable violation(s) are:
1. §195.452 Pipeline integrity management in high consequence areas.
(f) What are the elements of an integrity management program? An integrity
management program begins with the initial framework. An operator must
continually change the program to reflect operating experience, conclusions



drawn from results of the integrity assessments, and other maintenance and
surveillance data, and evaluation of consequences of a failure on the high
consequence area. An operator must include, at minimum, each of the following
elements in its written integrity management program:
(4) Criteria for remedial actions to address integrity issues raised by the
assessment methods and information analysis (see paragraph [h] of this section);
Coffeyville Resources LLC (Coffeyville) has not established adequate criteria to determine
the remedial actions required to address inline inspection (ILI) findings. Coffeyville did not
perform sufficient verification and/or calibrations activities for each of the nineteen ILI runs
performed on their pipelines. Procedure 6.02 ADM-011 requires that calibration digs be
performed. While there was no evidence indicating that the lack of calibration digs
contributed to pipeline accidents, two failures have occurred on pipe that had been previously
assessed.
2. §195.452 Pipeline integrity management in high consequence areas.
(f) What are the elements of an integrity management program? An integrity
management program begins with the initial framework. An operator must
continually change the program to reflect operating experience, conclusions
drawn from results of the integrity assessments, and other maintenance and
surveillance data, and evaluation of consequences of a failure on the high
consequence area. An operator must include, at minimum, each of the following
elements in its written integrity management program:
(8) A process for review of integrity assessment results and information analysis
by a person qualified to evaluate the results and information (see paragraph
(h)(2) of this section).
Coffeyville did not have a review of integrity assessment results and information analysis by a
person qualified to evaluate the results and information. Table 4.1 of Coffeyville’s integrity
management plan (IMP) identified ten company employees who are to be qualified. The IMP
also identifies eight integrity management (IM) related tasks that are to be completed by those
qualified employees. One of those IM tasks addressed the qualification of individuals who
review integrity assessments and information analysis. Coffeyville did not demonstrate that
any training or qualifications existed for any of the identified employees who reviewed
integrity results. No documentation was provided that the individuals had the necessary
knowledge, skills and abilities to make recommendations on remedial actions.
3. §195.452 Pipeline integrity management in high consequence areas.
(h) What actions must an operator take to address integrity issues?
(4) Special requirements for scheduling remediation
2



(i) Immediate repair conditions. An operator's evaluation and remediation
schedule must provide for immediate repair conditions. To maintain safety, an
operator must temporarily reduce the operating pressure or shut down the
pipeline until the operator completes the repair of these conditions. An operator
must calculate the temporary reduction in operating pressure using the formula
in section 451.7 of ASME/ANSI B31.4 (incorporated by reference, see § 195.3), if
applicable. If the formula is not applicable to the type of anomaly or would
produce a higher operating pressure, an operator must use an alternative
acceptable method to calculate a reduced operating pressure.
(C) A dent located on the top of the pipeline (above the 4 and 8 o'clock positions)
that has any indication of metal loss, cracking or a stress riser.
Coffeyville did not schedule and repair three dents identified during review of ILI results
from the September 8, 2008, ILI assessment of the 4” Bartlesville to Caney River Trap
segment. These dents were determined to be immediate repair conditions by Coffeyville
personnel and had not been repaired at the time of the PHMSA inspection.
4. §195.452 Pipeline integrity management in high consequence areas.
(h) What actions must an operator take to address integrity issues?
(4) Special requirements for scheduling remediation
(iii) 180-day conditions. Except for conditions listed in paragraph (h)(4)(i) or (ii)
of this section, an operator must schedule evaluation and remediation of the
following within 180 days of discovery of the condition:
(E) An area of general corrosion with a predicted metal loss greater than 50%
of nominal wall.
Coffeyville did not schedule and remediate three metal loss anomalies identified during
review of ILI results from the September 8, 2008, ILI assessment of the 4” Bartlesville to
Caney River Trap segment. These metal loss anomalies were determined to be 180-day repair
conditions by Coffeyville personnel and had not been remediated at the time of the PHMSA
inspection.
Proposed Civil Penalty
Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed
$100,000 for each violation for each day the violation persists up to a maximum of
$1,000,000 for any related series of violations. The Compliance Officer has reviewed the
circumstances and supporting documentation involved in the above probable violation(s) and
has recommended that you be preliminarily assessed a civil penalty of $84,700 as follows:
3



Item number PENALTY
1 $ 22,100
2 $ 22,100
3 $ 22,100
4 $ 18,400
Proposed Compliance Order
With respect to items 1and 2, pursuant to 49 United States Code § 60118, the Pipeline and
Hazardous Materials Safety Administration proposes to issue a Compliance Order to
Coffeyville. Please refer to the Proposed Compliance Order, which is enclosed and made a
part of this Notice.
Response to this Notice
Enclosed as part of this Notice is a document entitled Response Options for Pipeline
Operators in Compliance Proceedings. Please refer to this document and note the response
options. Be advised that all material you submit in response to this enforcement action is
subject to being made publicly available. If you believe that any portion of your responsive
material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the complete
original document you must provide a second copy of the document with the portions you
believe qualify for confidential treatment redacted and an explanation of why you believe the
redacted information qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not
respond within 30 days of receipt of this Notice, this constitutes a waiver of your right to
contest the allegations in this Notice and authorizes the Associate Administrator for Pipeline
Safety to find facts as alleged in this Notice without further notice to you and to issue a Final
Order.
In your correspondence on this matter, please refer to CPF 3-2012-5010 and for each
document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
David Barrett
Director, Central Region
Pipeline and Hazardous Materials Safety Administration
Enclosures: Proposed Compliance Order
Response Options for Pipeline Operators in Compliance Proceedings
4



PROPOSED COMPLIANCE ORDER
Pursuant to 49 United States Code § 60118, the Pipeline and Hazardous Materials Safety
Administration (PHMSA) proposes to issue to Coffeyville Resources LLC (Coffeyville) a
Compliance Order incorporating the following remedial requirements to ensure the
compliance of Coffeyville with the pipeline safety regulations:
1. In regard to Item Number 1 of the Notice pertaining to inadequate criteria for
remedial actions to address integrity issues, Coffeyville shall develop criteria
to determine remedial actions to address integrity issues raised by assessments
and information analysis, and reevaluate the most current assessment reports
for all pipelines. A plan and schedule will be submitted to this office that
shows how the findings of the reevaluation will be verified. A statistically
established number of verification and/or calibration activities shall be
included. These compliance requirements will be completed within 90 days of
the Final Order.
2. In regard to Item Number 1 of the Notice pertaining to inadequate criteria for
remedial actions to address integrity issues, Coffeyville shall excavate any
condition that meets the criteria for immediate conditions on all pipelines.
Once exposed, each anomaly will be cleaned to sound metal and appropriate
measurements will be documented. In the event the anomalies exceed the
predicted dimensions, the report shall be re-evaluated appropriately. Any
corrective measures will need to be performed immediately. These compliance
requirements will be completed within 150 days of the Final Order.
3. In regard to Item Number 2 of the Notice pertaining to having qualified
personnel review of integrity assessment results and information analysis,
Coffeyville shall have all personnel reviewing integrity assessment results and
information analysis trained and qualified in accordance with the requirements
of the Coffeyville integrity management plan. A plan will be submitted to this
office that describes training and qualifications required and a schedule of the
proposed training. These compliance requirements will be completed within
60 days of the Final Order.
4. Coffeyville shall submit documentation of the completed compliance actions
above within 30 days after their completion.
5. It is requested that Coffeyville maintain documentation of the safety
improvement costs associated with fulfilling this Compliance Order and submit
the total to David Barrett, Director, Central Region, Pipeline and Hazardous
Materials Safety Administration. It is requested that these costs be reported in
two categories: 1) total cost associated with preparation/revision of plans,
procedures, studies and analyses, and 2) total cost associated with
replacements, additions and other changes to pipeline infrastructure.
5

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/320125010>
- Source ID: `phmsa-enforcement`
- SHA-256: `a236a3ffcc375b5214218dfc94218d5ec5023f2b7b5ffd22a341433f0401e16f`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-23T09:28:39.732Z
- Document slug: `phmsa-enforcement-320125010`

### Source metadata

```json
{
  "cpf": "320125010",
  "operator": "COFFEYVILLE RESOURCES CRUDE TRANSPORTATION, LLC",
  "region": "Central",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.452(f)(4)",
    "195.452(f)(8)",
    "195.452(h)",
    "195.452(h)(4)(iii)(e)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "320125010_Final Order_11132013.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320125010/320125010_Final%20Order_11132013.pdf",
      "bytes": 505411,
      "category": "agency_document"
    },
    {
      "name": "320125010_Final Order_11132013_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320125010/320125010_Final%20Order_11132013_text.pdf",
      "bytes": 35895,
      "category": "agency_document"
    },
    {
      "name": "320125010_NOPV PCP PCO_05112012.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320125010/320125010_NOPV%20PCP%20PCO_05112012.pdf",
      "bytes": 1090646,
      "category": "agency_document"
    },
    {
      "name": "320125010_NOPV PCP PCO_05112012_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320125010/320125010_NOPV%20PCP%20PCO_05112012_text.pdf",
      "bytes": 29033,
      "category": "agency_document"
    },
    {
      "name": "320125010_Operator Response to Notice_06142012.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320125010/320125010_Operator%20Response%20to%20Notice_06142012.pdf",
      "bytes": 1434404,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "COFFEYVILLE RESOURCES CRUDE TRANSPORTATION, LLC"
}
```