# ENBRIDGE ENERGY, LIMITED PARTNERSHIP — Notice of Probable Violation

**Citation:** CPF 320125018  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2012-08-27

CLOSED notice of probable violation citing 195.402(c)(3), 195.402(d)(1), 195.52.

## Document text

Notice of Probable Violation involving ENBRIDGE ENERGY, LIMITED PARTNERSHIP. PHMSA's enforcement data identifies the cited regulations as 195.402(c)(3),  195.402(d)(1),  195.52. The case was opened on 2012-08-27 and is reported as closed as of 2013-09-09. Proposed civil penalty: $118,700. Assessed civil penalty: $112,500. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320125018_Final Order_08222013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125018/320125018_Final%20Order_08222013.pdf

320125018_Final Order_08222013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125018/320125018_Final%20Order_08222013_text.pdf

320125018_NOPV PCP_08272012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125018/320125018_NOPV%20PCP_08272012.pdf

320125018_NOPV PCP_08272012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125018/320125018_NOPV%20PCP_08272012_text.pdf

320125018_Operator Response to Notice_10162012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125018/320125018_Operator%20Response%20to%20Notice_10162012.pdf

320125018_Final Order_08222013_text.pdf

AUGUST 22, 2013
Mr. Richard Bird
Chief Executive Officer
Enbridge Energy, Limited Partnership
City Center Office
1409 Hammond Avenue
Superior, Wisconsin 54880-5247
Re: CPF No. 3-2012-5018
Dear Mr. Bird:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation and assesses a reduced civil penalty of $112,500. The penalty payment terms are set
forth in the Final Order. This enforcement action closes automatically upon receipt of payment.
Service of the Final Order by certified mail is deemed effective upon the date of mailing, or as
otherwise provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Ms. Linda Daugherty, Deputy Associate Administrator for Field Operations, OPS
Mr. Bradley F. Shamla, Vice President, U.S. Operations, Enbridge Energy, Limited
Partnership, East Duluth Office, 26 East Superior Street, Suite 309, Duluth, MN
55802
Mr. Shaun Kavajecz, Manager, U.S. Pipeline Compliance, Enbridge Pipelines
(Lakehead) L.L.C., 119 N. 25th Street E, Superior, Wisconsin 54880
CERTIFIED MAIL - RETURN RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Enbridge Energy, Limited Partnership, ) )
)
)
Respondent. )
____________________________________)
CPF No. 3-2012-5018
FINAL ORDER
On May 22, 2009, pursuant to 49 U.S.C. § 60117, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), investigated a crude
oil release that occurred on Enbridge Energy, Limited Partnership’s Line 61 in Superior,
Wisconsin. The accident resulted in the release of 154 barrels of crude oil, removal of 700 cubic
yards of contaminated soil, and reported property damage, lost product, and clean-up costs of
$117,257. Enbridge Energy, Limited Partnership (Enbridge or Respondent) owns and operates
approximately 3,386 miles of liquid pipelines running from Oklahoma to Illinois, North Dakota
to Illinois, Montana to Minnesota, and across Louisiana and Mississippi.1
As a result of the investigation, the Director, Central Region, OPS (Director), issued to
Respondent, by letter dated August 27, 2012, a Notice of Probable Violation and Proposed Civil
Penalty (Notice). In accordance with 49 C.F.R. § 190.207, the Notice proposed finding that
Enbridge had violated 49 C.F.R. §§ 195.52, 195.402(c)(3) and 195.402(d)(1) and proposed
assessing a civil penalty of $118,700 for the alleged violations.
Enbridge responded to the Notice by letter dated October 16, 2012 (Response).2 The company
contested the allegations and offered additional information in response to the Notice.
Respondent did not request a hearing and therefore has waived its right to one.
1 See http://enbridgepartners.com/Delivering-Energy/Pipeline-Systems/Liquids-Pipelines (last accessed on
May 6, 2013).
2 The Notice was mailed on August 27, 2012 and the Response was dated October 16, 2012. Pursuant to 49 C.F.R.
§ 190.209, a response must be submitted to PHMSA within 30 days of receipt of the Notice.



2
FINDINGS OF VIOLATION
The Notice alleged that Respondent violated 49 C.F.R. Part 195, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.52, which states in relevant
part:
§ 195.52 Immediate notice of certain accidents.
(a) Notice requirements. At the earliest practicable moment following
discovery of a release of the hazardous liquid or carbon dioxide
transported resulting in an event described in § 195.50, the operator of the
system must give notice, in accordance with paragraph (b) of this section,
of any failure that…
(3) Caused estimated property damage, including cost of cleanup and
recovery, value of lost product, and damage to the property of the operator
or others, or both, exceeding $50,000.
The Notice alleged that Respondent violated 49 C.F.R. § 195.52 by failing to provide notice of a
crude oil release meeting PHMSA’s immediate reporting requirements. Specifically, the Notice
alleged that Enbridge did not report its May 21, 2009 release from the Pig Trap Sender on Line
61 at the Superior Terminal within 1-2 hours.
In its Response, Enbridge contends that this release did not initially meet any of the reporting
criteria since the oil was immediately contained on Enbridge property in an isolated retention
basin. However, the company made the notification to the National Response Center (NRC) as a
precautionary measure. According to Enbridge, the incident occurred at 16:00 Central Daylight
Time and the company contacted the NRC at 18:32 Central Daylight Time.3 In light of the
circumstances involving this release and the fact that Enbridge made its notification within 2.5
hours of discovery of the release, Enbridge believes it contacted the NRC at the earliest
practicable moment, in compliance with § 195.52.
Section 195.52 requires that operators report releases meeting certain requirements at the earliest
practicable moment following discovery of a release. Since 1971, through interpretations,
advisory bulletins, and numerous enforcement cases, PHMSA has interpreted “earliest
practicable moment” to mean within 1-2 hours. Furthermore, PHMSA has held that “discovery”
relates to the actual release, not to the realization that an incident has resulted in circumstances
(e.g., property damage) that render the release reportable.4
Enbridge was required to report the release within 1-2 hours and failed to do so. Accordingly,
based upon a review of all of the evidence, I find that Respondent violated 49 C.F.R. § 195.52 by
3 See Response.
4 E.g., In the Matter of Texas Eastern Transmission Corporation, CPF No. 4-2001-1003, at 3 (May 5, 2005), citing
In the Matter of Enstar Natural Gas Company, CPF No. 52016 (May 14, 1997). See also, In the Matter of Buckeye
Partners, LP, 3-2010-5006 (November 19, 2012).



3
failing to provide notice of a crude oil release at the earliest practicable moment, within 1-2
hours of discovery.
Item 2: The Notice alleged that Respondent violated 49 C.F.R. § 195.402(c), which states in
relevant part:
§ 195.402(c) Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline
system a manual of written procedures for conducting normal operations
and maintenance activities and handling abnormal operations and
emergencies. This manual shall be reviewed at intervals not exceeding 15
months, but at least once each calendar year, and appropriate changes
made as necessary to insure that the manual is effective. This manual
shall be prepared before initial operations of a pipeline commence, and
appropriate parts shall be kept at locations where operations and
maintenance activities are conducted…
(c) Maintenance and normal operations. The manual required by
paragraph (a) of this section must include procedures for the following to
provide safety during maintenance and normal operations…
(3) Operating, maintaining, and repairing the pipeline system in
accordance with each of the requirements of this subpart and subpart H of
this part.
The Notice alleged that Respondent violated 49 C.F.R. § 195.402(c)(3) by failing to follow its
written procedures for Lock Out/Tag Out (LOTO) of equipment. Specifically, the Notice alleged
that Enbridge had locked out the valves associated with Enbridge’s Line 61 Pig Sending Trap but
no LOTO log was completed. In addition, Enbridge personnel failed to complete the Pressure
Piping Isolation (Valve Positioning) Form, as required by its LOTO procedures. As a result, a
technician was unaware that the trap vent valve had been left in the open position, and when the
control center issued a de-isolation command, crude oil flooded the trap, drained through the
open valve, and overflowed the trap sump, resulting in a release of 154 barrels of crude oil.
In Response, Enbridge acknowledged that the main cause of this incident was a
miscommunication between Enbridge personnel regarding the open vent line. In its Response,
Enbridge discussed corrective actions it had taken, including revising the LOTO procedures and
creating a detailed communication process to avoid a similar occurrence.
Accordingly, based upon a review of all of the evidence, I find that Respondent violated
49 C.F.R. § 195.402(c)(3) by failing to follow its written LOTO procedures.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed



4
$100,000 per violation for each day of the violation, up to a maximum of $1,000,000 for any
related series of violations. In determining the amount of a civil penalty under 49 U.S.C.
§ 60122 and 49 C.F.R. § 190.225, I must consider the following criteria: the nature,
circumstances, and gravity of the violation, including adverse impact on the environment; the
degree of Respondent’s culpability; the history of Respondent’s prior offenses; the Respondent’s
ability to pay the penalty and any effect that the penalty may have on its ability to continue doing
business; and the good faith of Respondent in attempting to comply with the pipeline safety
regulations. In addition, I may consider the economic benefit gained from the violation without
any reduction because of subsequent damages, and such other matters as justice may require.
The Notice proposed a total civil penalty of $118,700 for the violations cited above.
Item 1: The Notice proposed a civil penalty of $18,700 for Respondent’s violation of 49 C.F.R.
§ 195.52, for failing to give proper notice of a hazardous liquid release. As discussed above,
operators are expected to report releases meeting the criteria of § 195.50 within 1-2 hours of
discovery of the release. Respondent should have reported the release within 1-2 hours.
Therefore, a civil penalty is appropriate. I have reviewed the civil penalty criteria listed in
§ 190.225 and note that the prior history factor is particularly relevant since Enbridge had 12
violations in the five years preceding the date of the Notice.5 However, the fact that Enbridge
reported the release only 32 minutes late should be accounted for, to some degree, as part of the
culpability factor. Therefore, I am reducing the proposed civil penalty amount from $18,700 to
$12,500.
Accordingly, having reviewed the record and considered the assessment criteria, I assess
Respondent a civil penalty of $12,500 for violation of 49 C.F.R. § 195.52.
Item 2: The Notice proposed a civil penalty of $100,000 for Respondent’s violation of
49 C.F.R. § 195.402(c)(3), for failing to follow its written LOTO procedures. Enbridge did not
contest the associated civil penalty for this item. I have reviewed the assessment criteria listed in
§ 190.225 and find that the proposed civil penalty amount is appropriate considering that this
violation was critical to the cause of the 154 barrel spill. Accordingly, having reviewed the
record and considered the assessment criteria, I assess Respondent a civil penalty of $100,000 for
violation of 49 C.F.R. § 195.402(c)(3).
In summary, having reviewed the record and considered the assessment criteria for each of the
Items cited above, I assess Respondent a total civil penalty of $112,500.
Payment of the civil penalty must be made within 20 days of service. Federal regulations
(49 C.F.R. § 89.21(b)(3)) require such payment to be made by wire transfer through the Federal
Reserve Communications System (Fedwire), to the account of the U.S. Treasury. Detailed
instructions are contained in the enclosure. Questions concerning wire transfers should be
directed to: Financial Operations Division (AMZ-341), Federal Aviation Administration, Mike
Monroney Aeronautical Center, P.O. Box 269039, Oklahoma City, Oklahoma 73125. The
Financial Operations Division telephone number is (405) 954-8893.
Failure to pay the $112,500 civil penalty will result in accrual of interest at the current annual
5 See Part D-History of Prior Offenses, Pipeline Safety Violation Report, page 23.



5
rate in accordance with 31 U.S.C. § 3717, 31 C.F.R. § 901.9 and 49 C.F.R. § 89.23. Pursuant to
those same authorities, a late penalty charge of six percent (6%) per annum will be charged if
payment is not made within 110 days of service. Furthermore, failure to pay the civil penalty
may result in referral of the matter to the Attorney General for appropriate action in a district
court of the United States.
WARNING ITEM
With respect to Item 3, the Notice alleged a probable violation of Part 195 but did not propose a
civil penalty or compliance order for this item. Therefore, this is considered to be warning
item. The warning was for:
49 C.F.R. § 195.402(d)(1) (Item 3) ─ Respondent’s alleged failure to establish
procedures for responding to deviations from normal operation. Respondent’s
procedures for responding to a Sump Level High-High alarm for the Line 61 Pig
Sending Trap Sump were inadequate because they did not require specific
corrective action to be taken by the Control Center Operator.
Enbridge presented information in its Response showing that it had taken certain actions to
address the cited item. If OPS finds a violation of this provision in a subsequent inspection,
Respondent may be subject to future enforcement action.
Under 49 C.F.R. § 190.215, Respondent has the right to submit a Petition for Reconsideration of
this Final Order. The petition must be sent to: Associate Administrator, Office of Pipeline
Safety, PHMSA, 1200 New Jersey Avenue, SE, East Building, 2nd Floor, Washington, DC
20590, with a copy sent to the Office of Chief Counsel, PHMSA, at the same address. PHMSA
will accept petitions received no later than 20 days after receipt of service of the Final Order by
the Respondent, provided they contain a brief statement of the issue(s) and meet all other
requirements of 49 C.F.R. § 190.215. The filing of a petition automatically stays the payment of
any civil penalty assessed but does not stay any other provisions of the Final Order, including
any required corrective actions. If Respondent submits payment of the civil penalty, the Final
Order becomes the final administrative decision and the right to petition for reconsideration is
waived.
The terms and conditions of this Final Order are effective upon service in accordance with
49 C.F.R. § 190.5.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/320125018>
- Source ID: `phmsa-enforcement`
- SHA-256: `4c7408b7e894333d8ecdffebd8b1139a65c75404ce95b0795d3ff8274182a1da`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T23:13:09.300Z
- Document slug: `phmsa-enforcement-320125018`

### Source metadata

```json
{
  "cpf": "320125018",
  "operator": "ENBRIDGE ENERGY, LIMITED PARTNERSHIP",
  "region": "Central",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.402(c)(3)",
    "195.402(d)(1)",
    "195.52"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "320125018_Final Order_08222013.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320125018/320125018_Final%20Order_08222013.pdf",
      "bytes": 352584,
      "category": "agency_document"
    },
    {
      "name": "320125018_Final Order_08222013_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320125018/320125018_Final%20Order_08222013_text.pdf",
      "bytes": 45682,
      "category": "agency_document"
    },
    {
      "name": "320125018_NOPV PCP_08272012.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320125018/320125018_NOPV%20PCP_08272012.pdf",
      "bytes": 312242,
      "category": "case_document"
    },
    {
      "name": "320125018_NOPV PCP_08272012_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320125018/320125018_NOPV%20PCP_08272012_text.pdf",
      "bytes": 28102,
      "category": "case_document"
    },
    {
      "name": "320125018_Operator Response to Notice_10162012.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320125018/320125018_Operator%20Response%20to%20Notice_10162012.pdf",
      "bytes": 119439,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "ENBRIDGE ENERGY, LIMITED PARTNERSHIP"
}
```