# VANTAGE PIPELINE US LP — Warning Letter

**Citation:** CPF 320185006W  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2018-07-03

CLOSED warning letter citing 195.408(a), 195.408(b)(2), 195.412(a), 195.440(d), 195.440(e), 195.452(b)(5), 195.452(f)(1).

## Document text

Warning Letter involving VANTAGE PIPELINE US LP. PHMSA's enforcement data identifies the cited regulations as 195.408(a),  195.408(b)(2),  195.412(a),  195.440(d),  195.440(e),  195.452(b)(5),  195.452(f)(1). The case was opened on 2018-07-03 and is reported as closed as of 2018-07-03. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320185006W_Warning Letter_07032018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320185006W/320185006W_Warning%20Letter_07032018.pdf

320185006W_Warning Letter_07032018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320185006W/320185006W_Warning%20Letter_07032018_text.pdf

320185006W_Warning Letter_07032018_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
July 3, 2018
Mr. Arnel Santos, Senior VP Operations
Nova Chemicals (dba Vantage Pipeline)
P.O. Box 2518
Calgary, Alberta
T2P 5C6
CPF 3-2018-5006W
Dear Mr. Santos:
From October – November 2016, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code (U.S.C.)
inspected your Vantage pipeline procedures, records and field assets in Joffre, Alberta,
Canada, and North Dakota.
As a result of the inspection, it is alleged that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items
inspected and the probable violations are:
1. §195.408 Communications.
(a) Each operator must have a communication system to provide for the
transmission of information needed for the safe operation of its pipeline system.
(b) The communication system required by paragraph (a) of this section must, as
a minimum, include means for:



(1) . . . .
(2) Receiving notices from operator personnel, the public, and public authorities
of abnormal or emergency conditions and sending this information to
appropriate personnel or government agencies for corrective action;
Nova’s telephone communications failed to appropriately receive notice when tested.
Nova’s 24-hour phone number dropped calls when the “stay on the line option” was
selected based on inspector’s experience calling the number as a test.
2. §195.412 Inspection of rights-of-way and crossings under navigable waters
(a) Each operator shall, at intervals not exceeding 3 weeks, but at least 26 times
each calendar year, inspect the surface conditions on or adjacent to each pipeline
right-of-way. Methods of inspection include walking, driving, flying or other
appropriate means of traversing the right-of-way.
Nova exceeded the 3-week interval for inspection of its right-of-way. Nova’s
patrolling was deficient per records and clarifying emails from the operator. On one
instance both the aerial and ground patrol exceeded the 3-week requirement by 21
days. Eighteen ground patrols were performed as backup for missing air patrols.
However, during these ground patrols the entire right-of-way was not driven or
walked.
3. §195.440 Public awareness
(d) The operator's program must specifically include provisions to educate the
public, appropriate government organizations, and persons engaged in
excavation related activities on:
(1) Use of a one-call notification system prior to excavation and other
damage prevention activities
(2) Possible hazards associated with unintended releases from a hazardous
liquid or carbon dioxide pipeline facility;
(3) Physical indications that such a release may have occurred;
(4) Steps that should be taken for public safety in the event of a hazardous
liquid or carbon dioxide pipeline release; and
(5) Procedures to report such an event.
(e) The program must include activities to advise affected municipalities, school
districts, businesses, and residents of pipeline facility locations.
2



API Recommended Practice 1162, First Edition, December 2003
Public Awareness Programs for Pipeline Operators
Nova failed to meet the specific educational provisions of its public awareness
program. Based on an inspection interview and operator emails, Nova did not meet
the message requirements as noted below:
• Vantage’s Public Awareness Program (dated 5/20/2016) states annual delivery of
API 1162 Baseline Messages rather than every 2 years per API 1162. Vantage met
with Affected Public audience in 2014 and followed up with phone calls in 2015 &
2016. Phone calls and meetings are supplemental to the baseline activity but are not
acceptable as the required printed material for delivery of the baseline messages.
Also, the phone calls did not cover the following required baseline messages:
1. Pipeline purpose and reliability
2. Awareness of hazards and prevention measures undertaken
3. Damage prevention awareness
4. One-call requirements
5. Leak Recognition and response
6. Pipeline location information
3



7. 8. How to get additional information
Availability of list of pipeline operators through NPMS
• For emergency officials, brochures were mailed in 2014 which met requirements. In
2015 and 2016 phone calls were made to gather contact information only.
Therefore, these phone calls did not cover the following baseline messages
requirements of annual delivery:
1. Pipeline purpose and reliability
2. 4. 5. Awareness of hazards and prevention measures undertaken
3. Emergency Preparedness Communications
Pipeline location information and availability of NPMS
How to get additional information
4. §195.452 Pipeline integrity management in high consequence areas
(a) . . . .
(b) What program and practices must operators use to manage pipeline integrity?
Each operator of a pipeline covered by this section must:
(5) Implement and follow the program.
(f) What are the elements of an integrity management program? An integrity
management program begins with the initial framework. An operator must
continually change the program to reflect operating experience, conclusions
drawn from results of the integrity assessments, and other maintenance and
surveillance data, and evaluation of consequences of a failure on the high
consequence area. An operator must include, at minimum, each of the following
elements in its written integrity management program:
(1) A process for identifying which pipeline segments could affect a high
consequence area;
Nova failed to follow its HCA identification process. As stated in a 2016 HCA
Memorandum Nova did not 1) Consider the air dispersion analysis results to determine
could affect areas in addition to direct intersection of HCA areas and 2) Provide
justification for the buffer zone.
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to
exceed $209,002 per violation per day the violation persists, up to a maximum of $2,090,022
for a related series of violations. For violations occurring prior to November 2, 2015, the
maximum penalty may not exceed $200,000 per violation per day, with a maximum penalty
not to exceed $2,000,000 for a related series of violations. We have reviewed the
4



circumstances and supporting documents involved in this case, and have decided not to
conduct additional enforcement action or penalty assessment proceedings at this time. We
advise you to correct the items identified in this letter. Failure to do so will result in Nova
Chemical being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer
to CPF 3-2018-5006W. Be advised that all material you submit in response to this
enforcement action is subject to being made publicly available. If you believe that any portion
of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along
with the complete original document you must provide a second copy of the document with
the portions you believe qualify for confidential treatment redacted and an explanation of why
you believe the redacted information qualifies for confidential treatment under 5 U.S.C.
552(b).
Sincerely,
Allan C. Beshore
Director, Central Region, OPS
Pipeline and Hazardous Materials Safety Administration
cc: Mr. John De-La-Mare
Vice President, Conventional Pipelines
Pembina / Vantage Pipeline US LP
4000, 585 8th Avenue S.W.
Calgary, Alberta
T2P 1G1
Ms. Melissa Lundy
Advisor, Operating Management System
Pembina Pipeline Corporation
4000, 585 8th Avenue S.W
Calgary, Alberta
T2P 1G1
5

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/320185006W>
- Source ID: `phmsa-enforcement`
- SHA-256: `77a08ecc4c741fccc6d9cbf75ce50a862952379e29d745aa03fbf9ebe491e65e`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-23T09:31:23.482Z
- Document slug: `phmsa-enforcement-320185006w`

### Source metadata

```json
{
  "cpf": "320185006W",
  "operator": "VANTAGE PIPELINE US LP",
  "region": "Central",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.408(a)",
    "195.408(b)(2)",
    "195.412(a)",
    "195.440(d)",
    "195.440(e)",
    "195.452(b)(5)",
    "195.452(f)(1)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "320185006W_Warning Letter_07032018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320185006W/320185006W_Warning%20Letter_07032018.pdf",
      "bytes": 2384570,
      "category": "agency_document"
    },
    {
      "name": "320185006W_Warning Letter_07032018_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320185006W/320185006W_Warning%20Letter_07032018_text.pdf",
      "bytes": 485974,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "VANTAGE PIPELINE US LP"
}
```