Notice of Probable Violation involving CALIBER NORTH DAKOTA LLC. PHMSA's enforcement data identifies the cited regulation as 194.101(a). The case was opened on 2018-01-02 and is reported as closed as of 2019-06-10. Proposed civil penalty: $19,000. Assessed civil penalty: $19,000. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320186001_Final Order_05162019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320186001/320186001_Final%20Order_05162019.pdf

320186001_Final Order_05162019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320186001/320186001_Final%20Order_05162019_text.pdf

320186001_NOPV PCO PCP_01022018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320186001/320186001_NOPV%20PCO%20PCP_01022018.pdf

320186001_NOPV PCO PCP_01022018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320186001/320186001_NOPV%20PCO%20PCP_01022018_text.pdf

320186001_Operator Response to Notice_02022018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320186001/320186001_Operator%20Response%20to%20Notice_02022018.pdf

320186001_NOPV PCO PCP_01022018_text.pdf

NOTICE OF PROBABLE VIOLATION
PROPOSED CIVIL PENALTY
and
PROPOSED COMPLIANCE ORDER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
January 2, 2018
David Scobel
Chief Executive Officer
Caliber North Dakota
1200 17th Street Suite 2100
Denver, CO 80202
CPF 3-2018-6001
Dear Mr. Scobel:
On July 25, 2017, representatives of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter 601 of 49
United States Code (U.S.C.) inspected Caliber North Dakota’s, formerly Caliber Midstream,
(Caliber) oil spill response plans in Washington, D. C.
As a result of the inspection, it is alleged that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items
inspected and the probable violation are:
1. §194.101 Operators required to submit plans.
(a) Except as provided in paragraph (b) of this section, unless OPS grants a
request from an Federal On-Scene Coordinator (FOSC) to require an operator of
a pipeline in paragraph (b) to submit a response plan, each operator of an
onshore pipeline facility shall prepare and submit a response plan to PHMSA as
provided in §194.119. A pipeline which does not meet the criteria for significant



and substantial harm as defined in §194.103(c) and is not eligible for an exception
under §194.101(b), can be expected to cause substantial harm. Operators of
substantial harm pipeline facilities must prepare and submit plans to PHMSA for
review.
Caliber failed to prepare and submit a response plan to PHMSA as provided in
§194.119. Caliber has been operating their oil pipeline known as the Rawson
Gathering System for several years as shown in its Annual Reports (Form PHMSA F
7000-1.1) for 2014, 2015, and 2016.
On April 28, 2016, PHMSA received a letter and submission from Jonathan Greiner,
President of Basin Safety Consulting, representing Caliber, stating, “Please accept this
as Part 1of 2 of our Emergency Response Plan. We are compiling Part 2 and training
records and will have them soon to follow.”
On June 28, 2016, PHMSA received Part 2, which was an excerpt from Caliber’s
emergency response plan, from Mr. Greiner. During a review of the submitted
documents, it was clear that the submissions were not a response plan compliant with
49 CFR Part 194. On December 12, 2016, PHMSA staff contacted Mr. Greiner via
email asking whether a complete plan was submitted to PHMSA and noted, “It appears
to be an Operations and Maintenance Manual intended to satisfy 49 CFR 195.402
regulations, however does not contain the appropriate content of Part 194 – “Response
Plans for Onshore Oil Pipelines.”
Mr. Greiner responded on January 20, 2017, stating, “I believe I sent you a previous
version of the document. I am currently out of town, but will get you the updated
version as soon as I return.” No updated version was submitted. PHMSA staff
attempted to contact Mr. Greiner again on March 28, 2017, but received no response.
On July 25, 2017, the matter was referred to the Director, Oil Spill Preparedness and
Emergency Support Division for review. The review found that the Rawson pipeline
is within one mile of environmentally sensitive areas and drinking water sources.
Therefore, Caliber is required to submit a response plan for this pipeline. No response
plan has been submitted as of September 20, 2017.
Proposed Civil Penalty
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to
exceed $209,002 per violation per day the violation persists up to a maximum of $2,090,022
for a related series of violations. For violations occurring prior to November 2, 2015, the
maximum penalty may not exceed $200,000 per violation per day, with a maximum penalty
not to exceed $2,000,000 for a related series of violations. The Compliance Officer has
2



reviewed the circumstances and supporting documentation involved in the above probable
violation and has recommended that you be preliminarily assessed a civil penalty of $19,000.
Proposed Compliance Order
With respect to item 1 pursuant to 49 U.S.C. § 60118, the Pipeline and Hazardous Materials
Safety Administration proposes to issue a Compliance Order to Caliber Midstream, LLC.
Please refer to the Proposed Compliance Order, which is enclosed and made a part of this
Notice.
Response to this Notice
Enclosed as part of this Notice is a document entitled Response Options for Pipeline
Operators in Compliance Proceedings. Please refer to this document and note the response
options. All material you submit in response to this enforcement action may be made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide
a second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for
confidential treatment under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, or request
a hearing under 49 CFR § 190.211. If you do not respond within 30 days of receipt of this
Notice, this constitutes a waiver of your right to contest the allegations in this Notice and
authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this
Notice without further notice to you and to issue a Final Order. If you are responding to this
Notice, we propose that you submit your correspondence to my office within 30 days from
receipt of this Notice. This period may be extended by written request for good cause.
In your correspondence on this matter, please refer to CPF 3-2018-6001 and, for each
document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Allan C. Beshore
Director, Central, OPS
Pipeline and Hazardous Materials Safety Administration
Enclosures: Proposed Compliance Order
Response Options for Pipeline Operators in Compliance Proceedings
3



PROPOSED COMPLIANCE ORDER
Pursuant to 49 United States Code § 60118, the Pipeline and Hazardous Materials Safety
Administration (PHMSA) proposes to issue to Caliber North Dakota a Compliance Order
incorporating the following remedial requirements to ensure the compliance of Caliber North
Dakota with the pipeline safety regulations:
1. 2. 3. In regard to Item Number 1 of the Notice pertaining to submittal of a response
plan, Caliber North Dakota must submit a response plan as required by
§194.101, pursuant to §194.119, and to Allan C. Beshore, Director Central
Region.
Caliber North Dakota must submit the response plan referenced in Item 1 of
this Compliance Order within 60 days after receipt of the Final Order.
It is requested (not mandated) that Caliber North Dakota maintain
documentation of the safety improvement costs associated with fulfilling this
Compliance Order and submit the total to Allan C. Beshore, Director, Central,
Pipeline and Hazardous Materials Safety Administration. It is requested that
these costs be reported in two categories: 1) total cost associated with
preparation/revision of plans, procedures, studies and analyses, and 2) total cost
associated with replacements, additions and other changes to pipeline
infrastructure.
4

320186001_Final Order_05162019_text.pdf

May 16, 2019
Mr. Daniel Werth
Chief Executive Officer
Caliber Midstream Partners, LP
1200 17th Street, Suite 2100
Denver, Colorado 80802
Re: CPF No. 3-2018-6001
Dear Mr. Werth:
Enclosed please find the Final Order issued in the above-referenced case to your subsidiary,
Caliber North Dakota, LLC. It makes one finding of violation and assesses a civil penalty of
$19,000. It further finds that Caliber has completed the actions specified in the Notice to comply
with the pipeline safety regulations. When the civil penalty has been paid, this enforcement
action will be closed. Service of the Final Order by certified mail is effective upon the date of
mailing, as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Allan C. Beshore, Director, Central Region, Office of Pipeline Safety, PHMSA
CERTIFIED MAIL - RETURN RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
________________________________________________
In the Matter of )
Caliber North Dakota, LLC, ) CPF No. 3-2018-6001
a subsidiary of Caliber Midstream Partners, LP, )
)
)
)
Respondent. )
________________________________________________)
FINAL ORDER
On July 25, 2017, pursuant to 49 U.S.C. § 60117, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), conducted an
inspection of Caliber North Dakota, LLC’s (Caliber North Dakota or Respondent) oil spill
response plans in Washington, D.C. Caliber is a subsidiary of Caliber Midstream Partners, LP
(Caliber Midstream), which operates crude-oil and natural-gas gathering and processing facilities
in the Bakken and Three Forks shale oil fields of North Dakota.1
As a result of the inspection, the Director, Central Region, OPS (Director), issued to Respondent,
by letter dated January 2, 2018, a Notice of Probable Violation, Proposed Civil Penalty, and
Proposed Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the Notice
proposed finding that Caliber had violated 49 C.F.R. § 194.101 and proposed assessing a civil
penalty of $19,000 for the alleged violation. The Notice also proposed ordering Respondent to
take certain measures to correct the alleged violation.
Caliber Midstream, on behalf of Caliber North Dakota (collectively referred to as Caliber),
responded to the Notice by letter dated February 2, 2018 (Response). The company contested
the allegation of violation, offered additional information in response to the Notice, and
requested that the proposed civil penalty be eliminated.
Respondent did not request a hearing and therefore has waived its right to one.
The Notice alleged that Respondent violated 49 C.F.R. Part 194, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 194.101(a), which states:
FINDING OF VIOLATION
1 Caliber Midstream Partners, LP, website, available at http://www.calibermidstream.com/about (last accessed
February 4, 2019).



CPF No. 3-2018-6001
Page 2
§ 194.101 Operators required to submit plans.
(a) Except as provided in paragraph (b) of this section, unless OPS
grants a request from a[n] Federal On-Scene Coordinator (FOSC) to require
an operator of a pipeline in paragraph (b) to submit a response plan, each
operator of an onshore pipeline facility shall prepare and submit a response
plan to PHMSA as provided in § 194.119. A pipeline which does not meet
the criteria for significant and substantial harm as defined in § 194.103(c)
and is not eligible for an exception under § 194.101(b), can be expected to
cause substantial harm. Operators of substantial harm pipeline facilities
must prepare and submit plans to PHMSA for review.
The Notice alleged that Respondent violated 49 C.F.R. § 194.101(a) by failing to prepare and
submit an oil-spill response plan to PHMSA, as required by the regulation. Specifically, the
Notice alleged that Caliber had been operating an oil pipeline known as the Rawson Gathering
System, as shown in its Annual Reports (Form PHMSA F 700-1.1) for the years 2014, 2015, and
2016, but that as of September 20, 2017, the company had yet to submit a response plan to
PHMSA, as required by § 194.101.2 The Notice further alleged that on April 28, 2016, PHMSA
had received a letter and submission from Mr. Jonathan Greiner, president of Basin Safety
Consulting, indicating that he was submitting what was represented as Part 1 of 2 of Caliber’s
“Emergency Response Plan,” and that he would submit Part 2 and certain training records “soon
to follow.” Finally, the Notice stated that in June 2016, PHMSA received Part 2, but determined
that the combined document, Parts 1 and 2 together, did not constitute an oil spill response plan
at all. The PHMSA staff wrote back to Mr. Greiner on December 12, 2016, indicating that the
submission “appears to be an Operations and Maintenance Manual intended to satisfy 49 C.F.R.
195.402 regulations,” but that it was not an oil spill response plan meeting the requirements of 49
C.F.R. Part 194. According to PHMSA, no other response-plan documents had been provided to
PHMSA as of September 20, 2017.
In its Response, Caliber Midstream (on behalf of Caliber North Dakota) contested the allegation
of violation and stated that it had “a response plan in place for the Rawson Crude Oil System
since 5/01/14,” roughly four months prior to the commissioning of the Rawson Gathering
System in August of 2014.3 Caliber asserted that it had retained Basin Safety Consulting to
“make administrative changes to the response plan to create a more complete and efficient
document for use by Caliber field personnel,” and that the contractor had informed Caliber on
June 28, 2016, that the plan had been submitted to PHMSA on April 28, 2016. According to
Caliber, the company was unaware that PHMSA had identified deficiencies with the plan or that
2 The Notice alleged that Caliber had failed to prepare and submit a response plan as of September 20, 2017, even
though the pipeline had been in operation since at least 2014. Under 49 C.F.R. § 194.7, operators from whom a
response plan is required under § 194.101 “may not handle, store, or transport oil in that pipeline unless the operator
has submitted a response plan meeting the requirements of this part.” In other words, the operator of a pipeline that
is required to have a response plan cannot operate the pipeline until it has already submitted a plan to PHMSA for
approval.
3 Response, at 1.



CPF No. 3-2018-6001
Page 3
the agency had conveyed these deficiencies via email to Mr. Greiner on December 12, 2016.4
Specifically, Caliber stated that it had not been “notified concerning any alleged deficiencies per
§ 194.119(b). Had PHMSA attempted to contact Caliber concerning this matter as stated in
§ 194.119(b),5 any deficiencies to the submitted Response Plan would have been rectified
quickly, as the plan has been in existence since May of 2014.” Instead, Caliber maintained that it
had no notice of any problems with the response plan until it received the Notice letter on
January 5, 2018.6 I would also note that Caliber subsequently provided PHMSA with several
revisions to the response plan, which was ultimately approved by the agency on August 9, 2018,
roughly eight months after PHMSA issued the Notice.7
The foregoing facts are not in dispute, nor does Caliber question that 49 C.F.R. § 194.101 applies
to the Rawson Gathering System. Rather, Caliber’s challenge to the Notice can be summarized
as follows: 1) a response plan was prepared and on file with Caliber prior to the commissioning
of the Rawson Gathering System; 2) the response plan was subsequently submitted to PHMSA
by the company’s contractor; 3) Caliber’s contractor did not make Respondent aware of
deficiencies identified by PHMSA with the documents submitted by Caliber’s third-party
contractor; and 4) Caliber has addressed the deficiencies and PHMSA has approved the response
plan. On these grounds, Caliber requested that the allegation of violation and proposed civil
penalty be withdrawn.
I am not persuaded by Caliber’s arguments. The Notice alleged that Caliber failed to prepare
and submit a response plan in accordance with 49 C.F.R. § 194.101(a), which provides that each
operator of an onshore pipeline facility must prepare and submit a response plan to PHMSA as
provided in § 194.119. When § 194.101(a) is read in conjunction with the timeline outlined in
§ 194.7, it is clear that Caliber was required to prepare and submit its response plan to PHMSA
prior to commissioning its pipeline in 2014.
Caliber acknowledges in its Response that the first time it sent anything to PHMSA purporting to
be a response plan was on April 28, 2016. This was over two years after the Rawson Gathering
System was put into service. In addition, what Caliber sent to PHMSA on April 28, 2016, and
again in June 2016 was not actually a Part 194 response plan, as communicated by PHMSA to
Caliber’s contractor via email on December 12, 2016. Even if the documents submitted to
PHMSA on April 26, 2016, and June 26, 2016, could be construed as a Part 194 response plan,
4 Id., at 2.
5 Section 194.119(b) states: “If PHMSA determines that a response plan requiring approval does not meet all the
requirements of this part, PHMSA will notify the operator of any alleged deficiencies, and [to] provide the operator
an opportunity to respond, including the opportunity for an informal conference, on any proposed plan revisions and
an opportunity to correct any deficiencies.” Respondent’s suggestion that PHMSA should have contacted Caliber
directly concerning any alleged deficiencies in the plan is immaterial, since PHMSA did, in fact, notify Caliber’s
representative, Mr. Greiner, on December 12, 2016, that the documents he had submitted on Caliber’s behalf did not
constitute a response plan under Part 194.
6 Response, at 2.
7 Region Recommendation (on file with PHMSA), at 2.



CPF No. 3-2018-6001
Page 4
Caliber’s argument that it had a plan on file prior to commencing operations is of no
consequence. Having a response plan on file before operations begin does not demonstrate
compliance because the regulations require operators to “submit” the plan to PHMSA prior to
operations. Further, Caliber’s argument that its contractor failed to notify it of PHMSA’s
rejection of the documents submitted in April and June 2016 does not relieve Caliber of its
compliance obligations. Mr. Greiner was acting on behalf of Caliber, as evidenced by the letter
dated April 26, 2016, from Mr. Greiner to PHMSA on Caliber’s letterhead.8 Caliber is
responsible for the actions of its contractors in the same manner it is responsible for the actions
of its employees.
Finally, the fact that Caliber updated its response plan after operations began, in response to
PHMSA identifying deficiencies, and ultimately obtained approval from PHMSA for the plan is
also irrelevant to the violation in this case. The first actual Part 194 response plan for the
Rawson Gathering System was submitted to PHMSA on February 2, 2018, as an attachment to
Caliber’s Response.9 The initial submission of a response plan for the Rawson Gathering
System contained numerous deficiencies and was not approved by PHMSA until August 9,
2018.10 The evidence demonstrates that Caliber failed to submit an acceptable response plan for
the Rawson Gathering System to PHMSA until August 1, 2018,11 eight months after the Notice
was issued and four years after Caliber began operation of the Rawson Gathering System.
Accordingly, after considering all of the evidence I find that Respondent violated 49 C.F.R.
§ 194.101(a), by failing to submit a response plan to PHMSA as required by the regulation.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, 33 U.S.C. § 1321(j), and 49 C.F.R. § 190.223(b), Respondent is
subject to an administrative civil penalty for the violation. In determining the amount of a civil
penalty under 49 U.S.C. § 60122 and 49 C.F.R. § 190.225, I must consider the following criteria:
the nature, circumstances, and gravity of the violation, including adverse impact on the
environment; the degree of Respondent’s culpability; the history of Respondent’s prior offenses;
any effect that the penalty may have on its ability to continue doing business; and the good faith
of Respondent in attempting to comply with the pipeline safety regulations. In addition, I may
consider the economic benefit gained from the violation without any reduction because of
subsequent damages, and such other matters as justice may require. The Notice proposed a total
civil penalty of $19,000 for the violation cited above.
8 Pipeline Safety Violation Report (Violation Report), (January 2, 2018) (on file with PHMSA), at 50.
9 PHMSA Letter of Correction (on file with PHMSA), dated March 12, 2018.
10 PHMSA Letter of Approval (on file with PHMSA), dated August 9, 2018.
11 Email from Caliber to PHMSA (on file with PHMSA), dated August 1, 2018.



CPF No. 3-2018-6001
Page 5
Item 1: The Notice proposed a civil penalty of $19,000 for Respondent’s violation of 49 C.F.R.
§ 194.101(a), for failing to prepare and submit a response plan to PHMSA as provided in
§ 194.119. As noted above, I found that Caliber was required to submit a response plan to
PHMSA for the Rawson Gathering System prior to beginning operations in 2014.
In its Response, Caliber requested that the proposed civil penalty be withdrawn because Caliber
had a response plan on file prior to putting the Rawson Gathering System into operation, had
submitted a response plan to PHMSA after operations began, had updated the response plan
when PHMSA identified deficiencies, and had ultimately obtained PHMSA approval of the plan.
For the reasons detailed above, Caliber’s arguments are rejected. Therefore, I do not withdraw
the proposed civil penalty.
Regarding the nature criterion in the Violation Report, PHMSA noted that the alleged violation
related to a failure to perform a required activity. Caliber asserted that it had prepared a response
plan prior to operation of the Rawson Gathering System and had submitted the plan to PHMSA
in April 2016. As noted above, the regulations require such plans to be submitted to PHMSA
prior to operating a pipeline. Caliber does not argue that it submitted the plan prior to operating
the Rawson Gathering System. Accordingly, Caliber’s position in its Response that it performed
the required activity is contrary to the facts contained in the record and no reduction or
elimination of the proposed civil penalty is warranted on these grounds.
Regarding the circumstances criterion in the Violation Report, PHMSA noted that the probable
violation was discovered by PHMSA. Caliber does not attempt to rebut this allegation and the
facts contained in the record substantiate PHMSA’s assertion.
Regarding the gravity, culpability, and good faith criteria, PHMSA noted in the Violation Report
that although pipeline safety was minimally affected by the violation, Caliber failed to comply
with a requirement that was “clearly applicable” and that Caliber did not have a credible
justification for its non-compliance. The Rawson Gathering System is within one mile of
environmentally sensitive areas and drinking-water resources, thus triggering the requirement to
submit a response plan to PHMSA prior to operating the pipeline. Caliber does not attempt to
dispute this fact. In addition, Caliber provided no justification for failing to submit a response
plan prior to operating the line, and attempted to mitigate its non-compliance by asserting that its
contractor failed to inform Respondent that PHMSA had rejected the April and June 2016
submissions. As detailed above, what was submitted in April and June 2016 did not constitute a
Part 194 response plan. In addition, Caliber is responsible for the actions of its contractor in this
case and is not entitled to a penalty reduction simply because the contractor failed to
communicate with the operator. I can find nothing in the record that warrants a reduction in or
elimination of the proposed civil penalty based on these factors.
Accordingly, having reviewed the record and considered the assessment criteria, I assess
Respondent a civil penalty of $19,000 for violation of 49 C.F.R. § 194.101(a).
Payment of the civil penalty must be made within 20 days of service. Federal regulations (49
C.F.R. § 89.21(b)(3)) require such payment to be made by wire transfer through the Federal
Reserve Communications System (Fedwire), to the account of the U.S. Treasury. Detailed
instructions are contained in the enclosure. Questions concerning wire transfers should be



CPF No. 3-2018-6001
Page 6
directed to: Financial Operations Division (AMK-325), Federal Aviation Administration, Mike
Monroney Aeronautical Center, 6500 S MacArthur Blvd, Oklahoma City, Oklahoma 79169.
The Financial Operations Division telephone number is (405) 954-8845.
Failure to pay the $19,000 civil penalty will result in accrual of interest at the current annual rate
in accordance with 31 U.S.C. § 3717, 31 C.F.R. § 901.9 and 49 C.F.R. § 89.23. Pursuant to
those same authorities, a late penalty charge of six percent (6%) per annum will be charged if
payment is not made within 110 days of service. Furthermore, failure to pay the civil penalty
may result in referral of the matter to the Attorney General for appropriate action in a district
court of the United States.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Item 1 in the Notice for violation of
49 C.F.R. § 194.101(a). Under 49 U.S.C. § 60118(a), each person who engages in the
transportation of hazardous liquids or who owns or operates a pipeline facility is required to
comply with the applicable safety standards established under chapter 601. The Director
indicates that Respondent has taken the following actions specified in the proposed compliance
order:
1. With respect to the violation of § 194.101(a) (Item 1), Respondent has submitted
an oil spill response plan to PHMSA for the Rawson Gathering System, and PHMSA
has approved the plan.
Accordingly, I find that compliance has been achieved with respect to this violation. Therefore,
the compliance terms proposed in the Notice are not included in this Order.
Under 49 C.F.R. § 190.243, Respondent may submit a Petition for Reconsideration of this Final
Order to the Associate Administrator, Office of Pipeline Safety, PHMSA, 1200 New Jersey
Avenue, SE, East Building, 2nd Floor, Washington, DC 20590, with a copy sent to the Office of
Chief Counsel, PHMSA, at the same address, no later than 20 days after receipt of service of the
Final Order by Respondent. Any petition submitted must contain a brief statement of the issue(s)
and meet all other requirements of 49 C.F.R. § 190.243. The filing of a petition automatically
stays the payment of any civil penalty assessed. The other terms of the order, including any
corrective action, remain in effect unless the Associate Administrator, upon request, grants a
stay. If Caliber submits payment of the civil penalty, the Final Order becomes the final
administrative decision and the right to petition for reconsideration is waived.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
May 16, 2019
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/320186001>
- Source ID: `phmsa-enforcement`
- SHA-256: `e9e2ce93f009e8e965c24a28d49a3abddeaa85f0a80e4d3c878f748d04f48352`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T12:17:05.163Z
- Document slug: `phmsa-enforcement-320186001`

### Source metadata

```json
{
  "cpf": "320186001",
  "operator": "CALIBER NORTH DAKOTA LLC",
  "region": "Central",
  "pipelineType": "INTRASTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "194.101(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "320186001_Final Order_05162019.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320186001/320186001_Final%20Order_05162019.pdf",
      "bytes": 2075455,
      "category": "agency_document"
    },
    {
      "name": "320186001_Final Order_05162019_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320186001/320186001_Final%20Order_05162019_text.pdf",
      "bytes": 144624,
      "category": "agency_document"
    },
    {
      "name": "320186001_NOPV PCO PCP_01022018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320186001/320186001_NOPV%20PCO%20PCP_01022018.pdf",
      "bytes": 1220776,
      "category": "agency_document"
    },
    {
      "name": "320186001_NOPV PCO PCP_01022018_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320186001/320186001_NOPV%20PCO%20PCP_01022018_text.pdf",
      "bytes": 99718,
      "category": "agency_document"
    },
    {
      "name": "320186001_Operator Response to Notice_02022018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320186001/320186001_Operator%20Response%20to%20Notice_02022018.pdf",
      "bytes": 92025,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "CALIBER NORTH DAKOTA LLC"
}
```