Warning Letter involving NUSTAR PIPELINE OPERATING PARTNERSHIP L.P.. PHMSA's enforcement data identifies the cited regulations as 195.214(a),  195.222(a). The case was opened on 2019-10-03 and is reported as closed as of 2019-10-03. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320195022W_Warning Letter_10032019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320195022W/320195022W_Warning%20Letter_10032019.pdf

320195022W_Warning Letter_10032019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320195022W/320195022W_Warning%20Letter_10032019_text.pdf

320195022W_Warning Letter_10032019_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
October 3, 2019
Mr. Brad Barron
President and Chief Executive Officer
NuStar Energy, L.P.
19003 IH-10 West
San Antonio, TX 78257
CPF 3-2019-5022W
Dear Mr. Barron:
On September 17-18, 2019, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code (U.S.C.) inspected
your subsidiary’s, NuStar Pipeline Operating Partnership (NuStar), 8-inch diameter anhydrous
ammonia pipeline replacement project in Giliespie, Illinois.
As a result of the inspection, it is alleged that you have committed a probable violation of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR), Part 195. The items
inspected and the probable violations are:
1. §195.214 Welding procedures
(a) Welding must be performed by a qualified welder or welding operator in
accordance with welding procedures qualified under section 5, section 12,
Appendix A or Appendix B of API Std 1104 (incorporated by reference, see §
195.3), or Section IX of the ASME Boiler and Pressure Vessel Code (ASME
BPVC) (incorporated by reference, see § 195.3). The quality of the test welds used
to qualify the welding procedures must be determined by destructive testing.



Nustar did not perform welding per the procedure “S/232 Groove Any” which is the welding
procedure qualified in accordance to API 1104 using cellulosic electrodes for this replacement
project.
Procedure “S/232 Groove Any” specifically states that a minimum of four (4) weld passes
must be completed for each weld. During the inspection, the PHMSA representative
discovered that welders were using three (3) passes to complete welds.
Unless the procedure is changed as allowed by the pipeline safety regulations and standards
incorporated by reference, the welders must follow the procedure as written. The welders do
not have the authority to change a procedure themselves. This issue was addressed
immediately by NuStar, and the welders began using a minimum of four (4) passes in each
weld.
2. §195.222 Welders and welding operators: Qualification of welders and welding
operators.
(a) Each welder or welding operator must be qualified in accordance with section 6,
section 12, Appendix A or Appendix B of API Std 1104 (incorporated by reference, see
§ 195.3), or section IX of the ASME Boiler and Pressure Vessel Code (ASME BPVC),
(incorporated by reference, see § 195.3) except that a welder or welding operator
qualified under an earlier edition than listed in § 195.3, may weld but may not
requalify under that earlier edition.
Nustar did not properly qualify welders to use procedure “S/232 Groove LH” which is the
welding procedure qualified in accordance to API 1104 using low-hydrogen electrodes for
this replacement project.
Procedure “S/232 Groove LH” specifically requires a minimum of four (4) passes to
complete this weld. During the inspection, a PHMSA representative reviewed the
qualification records for the contract welders, which showed that only three (3) passes were
used during welder qualification. A welder qualification test is used to demonstrate the
welders’ ability to follow a procedure; therefore, it is critical that the welders follow the
procedure as written. NuStar indicated that all contract welders would be re-tested on this
welding procedure, if they needed to use the procedure.
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to
exceed $218,647 per violation per day the violation persists, up to a maximum of $2,186,465
for a related series of violations. For violation occurring on or after November 27, 2018 and
before July 31, 2019, the maximum penalty may not exceed $213,268 per violation per day,
with a maximum penalty not to exceed $2,132,679. For violation occurring on or after
November 2, 2015 and before November 27, 2018, the maximum penalty may not exceed
2



$209,002 per violation per day, with a maximum penalty not to exceed $2,090,022. For
violations occurring prior to November 2, 2015, the maximum penalty may not exceed
$200,000 per violation per day, with a maximum penalty not to exceed $2,000,000 for a related
series of violations. We have reviewed the circumstances and supporting documents involved
in this case, and have decided not to conduct additional enforcement action or penalty
assessment proceedings at this time. We advise you to correct the items identified in this letter.
Failure to do so will result in NuStar Pipeline Operating Partnership L.P. being subject to
additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer
to CPF 3-2019-5022W. Be advised that all material you submit in response to this
enforcement action is subject to being made publicly available. If you believe that any portion
of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along
with the complete original document you must provide a second copy of the document with the
portions you believe qualify for confidential treatment redacted and an explanation of why you
believe the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
Sincerely,
Allan C. Beshore
Director, Central Region, OPS
Pipeline and Hazardous Materials Safety Administration
cc: Mr. Gary Koegeboehn, Vice President – Pipeline Operations, NuStar Energy L.P., 19003
IH-10 West, San Antonio, TX 78257
3

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/320195022W>
- Source ID: `phmsa-enforcement`
- SHA-256: `9e4f6d98af8758d4b12a6aa3091c522e2a379428140bb4b0dc46533df9daab82`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T23:40:16.243Z
- Document slug: `phmsa-enforcement-320195022w`

### Source metadata

```json
{
  "cpf": "320195022W",
  "operator": "NUSTAR PIPELINE OPERATING PARTNERSHIP L.P.",
  "region": "Central",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.214(a)",
    "195.222(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "320195022W_Warning Letter_10032019.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320195022W/320195022W_Warning%20Letter_10032019.pdf",
      "bytes": 1036509,
      "category": "agency_document"
    },
    {
      "name": "320195022W_Warning Letter_10032019_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/320195022W/320195022W_Warning%20Letter_10032019_text.pdf",
      "bytes": 106667,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "NUSTAR PIPELINE OPERATING PARTNERSHIP L.P."
}
```