# TALLGRASS INTERSTATE GAS TRANSMISSION, LLC — Notice of Probable Violation

**Citation:** CPF 32021043NOPV  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2021-12-07

CLOSED notice of probable violation citing 191.5(c), 192.463(a), 192.465(a), 192.465(b), 192.465(c), 192.481(a), 192.605(a), 192.605(b)(8), 192.706(a), 192.805(h), 192.911(a).

## Document text

Notice of Probable Violation involving TALLGRASS INTERSTATE GAS TRANSMISSION, LLC. PHMSA's enforcement data identifies the cited regulations as 191.5(c),  192.463(a),  192.465(a),  192.465(b),  192.465(c),  192.481(a),  192.605(a),  192.605(b)(8),  192.706(a),  192.805(h),  192.911(a). The case was opened on 2021-12-07 and is reported as closed as of 2024-09-12. Proposed civil penalty: $359,900. Assessed civil penalty: $325,382. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32021043NOPV_Closure Letter_09122024_(20-179274).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_Closure%20Letter_09122024_(20-179274).pdf

32021043NOPV_Closure Letter_09122024_(20-179274)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_Closure%20Letter_09122024_(20-179274)_text.pdf

32021043NOPV_Consent Agreement and Order_04132022_(20-179274).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_Consent%20Agreement%20and%20Order_04132022_(20-179274).pdf

32021043NOPV_Consent Agreement and Order_04132022_(20-179274)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_Consent%20Agreement%20and%20Order_04132022_(20-179274)_text.pdf

32021043NOPV_Op Resp to Notice and Req for Hearing and Prelim Stmnt of Issues (Part 1)_01062022_(20-179274).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_Op%20Resp%20to%20Notice%20and%20Req%20for%20Hearing%20and%20Prelim%20Stmnt%20of%20Issues%20(Part%201)_01062022_(20-179274).pdf

32021043NOPV_Op Resp to Notice and Req for Hearing and Prelim Stmnt of Issues (Part 2)_01062022_(20-179274).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_Op%20Resp%20to%20Notice%20and%20Req%20for%20Hearing%20and%20Prelim%20Stmnt%20of%20Issues%20(Part%202)_01062022_(20-179274).pdf

32021043NOPV_PCP PCO_12072021_(20-179274).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_PCP%20PCO_12072021_(20-179274).pdf

32021043NOPV_PCP PCO_12072021_(20-179274)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_PCP%20PCO_12072021_(20-179274)_text.pdf

32021043NOPV_PHC Hearing Canceled_06022022_(20-179274).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_PHC%20Hearing%20Canceled_06022022_(20-179274).pdf

32021043NOPV_PHC Hearing Canceled_06022022_(20-179274)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_PHC%20Hearing%20Canceled_06022022_(20-179274)_text.pdf

32021043NOPV_PHC Hearing Rescheduled_04072022_(20-179274).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_PHC%20Hearing%20Rescheduled_04072022_(20-179274).pdf

32021043NOPV_PHC Hearing Rescheduled_04072022_(20-179274)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_PHC%20Hearing%20Rescheduled_04072022_(20-179274)_text.pdf

32021043NOPV_PHC Hearing Scheduled_01192022_(20-179274).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_PHC%20Hearing%20Scheduled_01192022_(20-179274).pdf

32021043NOPV_PHC Hearing Scheduled_01192022_(20-179274)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_PHC%20Hearing%20Scheduled_01192022_(20-179274)_text.pdf

32021043NOPV_PHC Hearing Canceled_06022022_(20-179274)_text.pdf

Date: June 2, 2022
From: Ryan McClure
To: File
Re: Withdrawal of Hearing Request, Tallgrass Interstate Gas Transmission, LLC
3-2021-043-NOPV
On April 15, 2022, Tallgrass Interstate Gas Transmission, LLC, by email, withdrew its request
for a hearing for 3-2021-043-NOPV, which it submitted on January 6, 2022. The hearing,
scheduled for April 21, 2022, has been cancelled.

32021043NOPV_PHC Hearing Scheduled_01192022_(20-179274)_text.pdf

January 19, 2022
VIA ELECTRONIC MAIL TO: jennifer.eckels@tallgrassenergylp.com and
gregory.ochs@dot.gov
Ms. Jennifer Eckels
Manager – Compliance
Tallgrass Energy, LP
370 Van Gordon Street
Lakewood, CO 80228
Mr. Gregory Ochs
Director, Central Region
Pipeline and Hazardous Materials Safety Administration
901 Locust Street, Suite 480
Kansas City, MO 64106-2641
Re: Notice of Hearing, Tallgrass Interstate Gas Transmission, LLC
CPF No. 3-2021-043-NOPV
Dear Ms. Eckels and Mr. Ochs:
In accordance with 49 C.F.R. § 190.211, an informal hearing will be held regarding the Notice of
Probable Violation, Proposed Civil Penalty, and Proposed Compliance Order issued by the Pipeline
and Hazardous Materials Safety Administration in the above-referenced case. The hearing will take
place on April 7, 2022, beginning at 8:30 a.m. Central Time.
The hearing will be held via videoconference. I will provide the videoconference information prior
to the hearing. At least 10 calendar days prior to the hearing (or by March 28, 2022), both parties
must submit and exchange any additional written materials they intend to present at the hearing and
the name and email address of each attendee. This information should be provided electronically.
Materials not submitted by this date may be excluded.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Larry White
Presiding Official
cc: Mr. William Moler, President and Chief Executive Officer, Tallgrass Interstate Gas
Transmission, LLC, bill.moler@tallgrassenergylp.com



CPF No. 3-2021-043-NOPV
Page 2
Mr. Joseph Hainline, Counsel, Central Region, Office of Pipeline Safety,
joseph.hainline@dot.gov

32021043NOPV_PHC Hearing Rescheduled_04072022_(20-179274)_text.pdf

Date: April 7, 2022
From: Larry White
To: File
Re: Continuance of Hearing, Tallgrass Interstate Gas Transmission, LLC
CPF No. 3-2021-043-NOPV
By electronic mail dated March 25, 2022, Catherine Little, Counsel for Tallgrass Interstate Gas
Transmission, LLC and Joseph Hainline, Counsel for OPS Central Region, submitted a joint request
for a continuance of the hearing previously scheduled for April 7, 2022. The request explained that
the parties were moving forward with negotiation of a consent agreement to resolve the case which
would make a hearing unnecessary and the additional time was needed to conclude the negotiations.
I granted the request for a continuance until April 21, 2022 which will be the new hearing date if
resolution by consent agreement is not completed by that time.

32021043NOPV_Closure Letter_09122024_(20-179274)_text.pdf

VIA ELECTRONIC MAIL TO: matt@tallgrass.com; crystal.heter@tallgrassenergylp.com;
danielle.stephens@tallgrass.com; Kale.Stanton@tallgrass.com
September 12, 2024
Matt Sheehy, President/CEO
Tallgrass Interstate Gas Transmission, LLC
370 Van Gordon Street
Lakewood, CO 80228
RE: CPF 3-2021-043-NOPV
Dear Mr. Sheehy:
On April 13, 2024, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued
to Tallgrass Interstate Gas Transmission, LLC (Tallgrass) a Consent Order incorporating the terms
of the Consent Agreement entered into between PHMSA and Tallgrass in the above-referenced
case. Based on our review of the documentation provided by Tallgrass, and confirmation of
payment of the civil penalty, it has been determined that Tallgrass has complied with the terms of
the Consent Agreement and Order.
Accordingly, this case is now closed, and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Gregory A. Ochs
Director, Central Region, OPS
Pipeline and Hazardous Materials Safety Administration
cc: Crystal Heter, Chief Operating Officer, crystal.heter@tallgrassenergylp.com
Danielle Stephens, Director Compliance, danielle.stephens@tallgrass.com
Kale Stanton, Director, Asset Integrity, Tallgrass Energy, Kale.Stanton@tallgrass.com

32021043NOPV_Op Resp to Notice and Req for Hearing and Prelim Stmnt of Issues (Part 1)_01062022_(20-179274).pdf

Via Email to Gregory.Ochs@DOT.gov
January 6, 2022
Mr. Gregory Ochs
Director, Central Region
Pipeline and Hazardous Materials Safety Administration
901 Locust Street, Suite 462
Kansas City, MO 64106
RE: CPF No. 3-2021-043-NOPV
Request for Informal Conference
Request for a Hearing and Preliminary Statement of Issues
Written Response
Dear Mr. Ochs,
By way of the attached, Tallgrass Interstate Gas Transmission LLC’s (Tallgrass)
responds to the above-referenced Notice of Probable Violation, Proposed Civil Penalty and
Proposed Compliance Order (NOPV) issued by the Pipeline and Hazardous Materials Safety
Administration (PHMSA) on December 7, 2021. As described in the attached, Tallgrass requests
an informal conference to attempt to resolve certain Items contained in the NOPV.
In order to preserve its rights, Tallgrass also submits a Request for Hearing and
Preliminary Statement of Issues pursuant to 49 C.F.R. § 190.211. Tallgrass hopes that the
hearing will be unnecessary, and that the parties can resolve this matter informally.
For those NOPV Items not subject to the Request for Informal Conference and Request
for Hearing, Tallgrass provides written responses in the attached.
I will reach out to you by phone regarding scheduling an informal conference. In the
meantime, please feel free to contact me if you have any questions.
Sincerely,
Jennifer Eckels
Manager - Compliance
370 Van Gordon Street
Lakewood, CO 80228
Phone: (303) 763-3486



CC: Tallgrass: Byron Gale, Jay Meyers, Jarid Kling, Nicole Longwell, Crystal Heter
PHMSA: AJ McKean, James Bunn
Enclosure: Request for Informal Conference, Request for Hearing and Preliminary Statement
of Issues Regarding NOPV Items 6, 9, 10, 11 and 12; and
Written Response to NOPV Items 1, 2, 3, 4, 5, 7 and 8

32021043NOPV_Consent Agreement and Order_04132022_(20-179274)_text.pdf

April 13, 2022
VIA ELECTRONIC MAIL TO: bill.moler@tallgrassenergylp.com
Mr. William Moler
Chief Executive Officer
Tallgrass Interstate Gas Transmission, LLC
4200 W. 115th St. Suite 350
Leawood, KS 66211
CPF 3-2021-043-NOPV
Dear Mr. Moler:
Enclosed please find a Consent Order incorporating the terms of the Consent Agreement
between the Pipeline and Hazardous Materials Safety Administration (PHMSA) and Tallgrass
Interstate Gas Transmission, LLC (Tallgrass), which was fully executed on April 11, 2022.
Service of the Consent Order and Consent Agreement by electronic mail is deemed effective
upon the date of transmission and acknowledgement of receipt, or as otherwise provided under
49 C.F.R. § 190.5.
Sincerely,
Alan K Mayberry
Associate Administrator
for Pipeline Safety
Enclosures: Consent Agreement and Consent Order
Cc: Mr. Gregory Ochs, Director, Central Region, Office of Pipeline Safety, PHMSA
Ms. Catherine Little, outside counsel for Tallgrass, catherine.little@troutman.com
Ms. Jennifer Eckels, Compliance Manager, Tallgrass, jennifer.eckels@tallgrass.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
__________________________________________
In the Matter of )
Tallgrass Interstate Gas Transmission, LLC, ) CPF No. 3-2021-043-NOPV
)
)
)
Respondent. )
__________________________________________)
CONSENT ORDER
By letter dated December 7, 2021, the Pipeline and Hazardous Materials Safety Administration,
Office of Pipeline Safety (PHMSA), issued a Notice of Probable Violation, Proposed Civil
Penalty, and Proposed Compliance Order (Notice) to Tallgrass Interstate Gas Transmission, LLC
(Tallgrass or Respondent).
In response to the Notice, Respondent did not to contest any of the underlying allegations and
requested a hearing only as to the proposed civil penalty for Items 6, 10, and 12, and the
proposed compliance order actions for Items 6, 9, 10, 11, and 12 (Response). Respondent also
asked for the opportunity to meet informally with PHMSA to discuss the issues raised.
Respondent and PHMSA (the Parties) subsequently met on several occasions to discuss the
issues raised in the Response. As a result of those discussions, Respondent has agreed to
withdraw its hearing request and accept the findings of violation in the Notice, subject to the
clarifications as set forth below, pay a reduced civil penalty in the amount of $324,382 for Items
2, 3, 5, 6, 8, 10, and 12, and to undertake certain corrective measures.
Accordingly, the Consent Agreement is hereby approved and incorporated by reference into this
Order. Tallgrass is hereby ordered to comply with the terms of the Consent Agreement, effective
immediately.
Pursuant to 49 U.S.C. 60101, et seq., failure to comply with this Consent Order may result in the
assessment of civil penalties as set forth in 49 C.F.R. § 190.223.
The terms and conditions of this Consent Order are effective upon service in accordance with 49
C.F.R. § 190.5.
April 13, 2022
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
)
In the Matter of )
)
Tallgrass Interstate Gas Transmission, )
LLC ) CPF No. 3-2021-043-NOPV
)
Respondent. )
____________________________________)
CONSENT AGREEMENT
From February 6 through November 19, 2020, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter
601 of 49 United States Code (U.S.C.) inspected Tallgrass Interstate Gas Transmission, LLC’s
(Tallgrass or Respondent) records and facilities in Lakewood, Colorado.
As a result of the inspection, the Director, Central Region, OPS (Director), issued to Respondent,
by letter dated December 7, 2021, a Notice of Probable Violation, Proposed Civil Penalty and
Proposed Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the Notice
alleged that Respondent committed probable violations of nine provisions of 49 C.F.R. Part 192
(Items 2, 3, 5, 6, 8-12), proposed ordering Respondent to take certain measures to correct the
alleged violations, and pay a proposed civil penalty in the amount of $359,900 associated with
those items. Three other items (Items 1, 4, and 7) were brought as warnings requiring no further
action by Respondent.
In response to the Notice and without admission, Respondent elected not to contest any of the
underlying allegations and requested a hearing only as to the proposed civil penalty for Items 6,
10, and 12, and the proposed compliance order actions for Items 6, 9, 10, 11, and 12 (Response).
Respondent also asked for the opportunity to meet informally with PHMSA to discuss the issues
raised. Respondent and PHMSA (the Parties) subsequently met on several occasions to discuss
the issues raised in the Response. As a result of those discussions and without admission,
Respondent has agreed to withdraw its hearing request and accept the findings of violation in the
Notice, subject to the clarifications as set forth below, pay a reduced civil penalty in the amount
of $324,382 for Items 2, 3, 5, 6, 8, 10, and 12, and to undertake certain corrective measures.
Having agreed that settlement of this enforcement action will avoid further administrative
proceedings or litigation and will serve the public interest by promoting safety and protection of
1



the environment, pursuant to 49 C.F.R. Part 190, and upon consent and agreement of Respondent
and PHMSA, the Parties hereby agree as follows:
I. General Provisions:
1. Respondent acknowledges that as the operator of the pipeline facilities subject to
the Notice, Respondent and its referenced natural gas pipeline facilities are subject to the
jurisdiction of the Federal pipeline safety laws, 49 U.S.C. § 60101, et seq., and the regulations
and administrative orders issued thereunder. For purposes of this Agreement, Respondent
acknowledges that it received proper notice of PHMSA’s action in this proceeding and that the
Notice states claims upon which relief may be granted pursuant to 49 U.S.C. § 60101, et seq.,
and the regulations and orders issued thereunder.
2. After Respondent returns this signed Agreement to PHMSA, the Agency’s
representative will present it to the Associate Administrator for Pipeline Safety, recommending
that the Associate Administrator adopt the terms of this Agreement by issuing an administrative
order (Consent Order) incorporating the terms of this Agreement. The terms of this Agreement
constitute an offer of settlement until accepted by the Associate Administrator. Once accepted,
the Associate Administrator will issue a Consent Order incorporating the terms of this Agreement.
3. Respondent consents to the issuance of the Consent Order, and hereby waives
any further procedural requirements with respect to its issuance. Respondent waives all rights to
contest the adequacy of notice, or the validity of the Consent Order or this Agreement, including
all rights to administrative or judicial hearings or appeals, except as set forth herein.
4. This Agreement shall apply to and be binding upon PHMSA and Respondent, its
officers, directors, and employees, and its successors, assigns, or other entities or persons otherwise
bound by law. Respondent agrees to provide a copy of this Agreement and any incorporated work
plans and schedules to all of Respondent’s officers, employees, and agents whose duties might
reasonably include compliance with this Agreement.
5. This Agreement constitutes the final, complete and exclusive agreement and
understanding between the Parties with respect to the settlement embodied in this Agreement.
The Parties acknowledge that there are no representations, agreements or understandings
relating to settlement other than those expressly contained in this Agreement, except that the
terms of this Agreement may be construed by reference to the Notice.
6. Nothing in this Agreement affects or relieves Respondent of its responsibility to
comply with all applicable requirements of the Federal pipeline safety laws, 49 U.S.C. § 60101,
et seq., and the regulations and orders issued thereunder. Nothing in this Agreement alters
PHMSA’s right of access, entry, inspection, and information gathering or PHMSA’s authority to
bring enforcement actions against Respondent pursuant to the Federal pipeline safety laws, the
regulations and orders issued thereunder, or any other provision of Federal or State law.
7. For all transfers of ownership or operating responsibility of Respondent’s pipeline
system referenced herein, Respondent will provide a copy of this Agreement to the prospective
2



Upon issuance of the Consent Order, the Parties agree to the following terms.
transferee at least 30 days prior to such transfer. Respondent will provide written notice of the
transfer to the PHMSA Central Regional Director no later than 60 days after the transfer occurs.
8. This Agreement does not waive or modify any Federal, State, or local laws or
regulations that are applicable to Respondent’s pipeline systems. This Agreement is not a
permit, or a modification of any permit, under any Federal, State, or local laws or regulations.
Respondent remains responsible for achieving and maintaining compliance with all applicable
Federal, State, and local laws, regulations and permits.
9. This Agreement does not create rights in, or grant any cause of action to, any
third party not party to this Agreement. The U.S. Department of Transportation is not liable for
any injuries or damages to persons or property arising from acts or omissions of Respondent or
its officers, employees, or agents carrying out the work required by this Agreement.
Respondent agrees to hold harmless the U.S. Department of Transportation, its officers,
employees, agents, and representatives from any and all causes of action arising from any acts
or omissions of Respondent or its contractors in carrying out any work required by this
Agreement.
10. Agreement.
Respondent neither admits nor denies any allegation or conclusion in the Notice
or this Agreement but agrees for purposes of this Agreement to comply with the terms of this
11. II. Warning Items:
12. Item 1: 49 C.F.R. § 191.5(c): The Notice alleged that Respondent failed to
provide a National Response Center (NRC) update within 48-hours, following an instance
where Respondent submitted an update within 96 hours. This item was brought as a warning
requiring no further action by Respondent. This Warning Item does not constitute a finding of
violation for any purpose, and no further action by Respondent is necessary to achieve
compliance.
13. Item 4: 49 C.F.R. § 192.465(b): The Notice alleged that Respondent failed to
inspect three cathodic protection rectifiers at the requisite intervals of six times each calendar
year, but at intervals not exceeding two and a half months, which Respondent disclosed to
PHMSA as part of a November 18, 2020, letter to PHMSA summarizing self-report items,
associated updates, and steps taken to remedy the underlying issues (Self-Report). This item
was brought as a warning requiring no further action by Respondent. This Warning Item does
not constitute a finding of violation for any purpose, and no further action by Respondent is
necessary to achieve compliance.
14. Item 7: 49 C.F.R. § 192.605(a): The Notice alleged one instance where
Respondent failed to follow its manual of written procedures for conducting operations and
maintenance activities which requires that certain maps and records regarding pipeline materials
be maintained for its Trenton Lateral pipeline. Respondent performed material verification digs
on the Trenton Lateral pipeline during the inspection to confirm the pipe specifications, and
Respondent updated its system of record accordingly. This item was brought as a warning
3



requiring no further action by Respondent. This Warning Item does not constitute a finding of
violation for any purpose, and no further action by Respondent is necessary to achieve
compliance.
III. Findings of Violation:
15. Item 2: 49 C.F.R. § 192.463(a): The Notice alleged four instances where
Respondent failed to maintain a level of cathodic protection that complies with one of the
applicable criteria contained in Appendix D of Part 192. Respondent disclosed these issues to
PHMSA as part of its Self-Report and undertook a number of measures to resolve the issues,
including an unplanned CIS and immediate test point surveys to confirm CP levels, all of which
confirmed no immediate safety issues, increasing or upgrading rectifier outputs, and installation
of Remote Monitoring Units. Respondent did not contest this allegation of violation and
PHMSA finds a violation of 49 C.F.R. § 192.463(a). This violation may be considered by
PHMSA as a prior offense in any future PHMSA enforcement action taken against Respondent.
16. Item 3: 49 C.F.R. § 192.465(a): The Notice alleged that Respondent failed to
test certain electrical test stations along its pipeline at the required intervals for calendar years
2016-2019, which Respondent disclosed to PHMSA as part of its Self-Report. All of the test
stations at issue were tested within two weeks of disclosure and all collected readings met
regulatory criteria. Respondent did not contest this allegation of violation and PHMSA finds a
violation of 49 C.F.R. § 192.465(a). This violation may be considered by PHMSA as a prior
offense in any future PHMSA enforcement action taken against Respondent.
17. Item 5: 49 C.F.R. § 192.465(c): The Notice alleged that Respondent failed to
electrically check for proper performance of critical bonds of four pipeline segments.
Respondent disclosed these issues to PHMSA as part of its Self-Report, which included a
summary of the steps taken by Respondent to complete the electrical checks of the critical bonds
of the four pipeline segments. Respondent did not contest this allegation of violation and
PHMSA finds a violation of 49 C.F.R. § 192.465(c). This violation may be considered by
PHMSA as a prior offense in any future PHMSA enforcement action taken against Respondent.
18. Item 6: 49 C.F.R. § 192.481(a): The Notice alleged that Respondent failed to
inspect two pipeline spans for atmospheric corrosion at least once every 3 calendar years, but
with intervals not to exceeding 39 months. Specifically, Respondent did not provide records
during PHMSA’s inspection of the requisite corrosion inspection records prior to August 24,
2020 for the Lingle to State Line segment, and between June 9, 2019 and August 24, 2020 for
the Douglas Plant to Ogallala segment. In response to a post-inspection records request,
Respondent provided a list in its Self-Report identifying missed corrosion inspections on the
Lingle to State Line segment at 38 locations in 2017 and one location in 2019. As summarized
for PHMSA, Respondent conducted inspections of all spans in 2020 and clarified
responsibilities for documentation requirements. Respondent did not contest this allegation of
violation and PHMSA finds a violation of 49 C.F.R. § 192.481(a). This violation may be
considered by PHMSA as a prior offense in any future PHMSA enforcement action taken
against Respondent.
4



19. Item 8: 49 C.F.R. § 192.605(a): The Notice alleged that Respondent failed to
follow its manual of written procedures for conducting inspections for electrical isolation of
pipeline casings at least once each calendar year, not to exceed 15 months, which Respondent
disclosed to PHMSA as part of its Self-Report and summarized the actions taken by Respondent
to complete casing patrols and readings at the subject locations. Respondent did not contest this
allegation of violation and PHMSA finds a violation of 49 C.F.R. § 192.605(a). This violation
may be considered by PHMSA as a prior offense in any future PHMSA enforcement action
taken against Respondent.
20. Item 9: 49 C.F.R. § 192.605(b)(1)(8): The Notice alleged that Respondent
failed to prepare and follow written procedures for maintenance and normal operations relating
to corrosion control survey information and data collection. Respondent self-identified and self-
reported these issues following their discovery on November 18, 2020, which was limited to one
of its operating regions. To address the issues underlying the self-report, Respondent undertook
remedial measures and planned additional remedial measures as detailed in the self-report
submitted to PHMSA. Respondent did not contest this allegation of violation and PHMSA finds
a violation of 49 C.F.R. § 192.605(b)(1)(8). This violation may be considered by PHMSA as a
prior offense in any future PHMSA enforcement action taken against Respondent.
21. Item 10: 49 C.F.R. § 192.706(a): The Notice alleged that Respondent failed to
conduct leak detection surveys in a non-odorized Class 3 location using acceptable leak detector
equipment from 2017 through 2019 on Line Number 740-002-00-00, at Holyoke, Colorado. As
discussed and reflected in documents provided during the informal conferences, Respondent
provided a list of the unodorized Class 3 locations in which it used the prior leak detector
equipment and conducted subsequent leak surveys of those locations with appropriate leak
detection equipment. Respondent did not contest this allegation of violation and PHMSA finds
a violation of 49 C.F.R. § 192.706(a). This violation may be considered by PHMSA as a prior
offense in any future PHMSA enforcement action taken against Respondent.
22. Item 11: 49 C.F.R. § 192.805(h): The Notice alleged that Respondent failed to
provide training to ensure that individuals performing leakage surveys have the necessary
knowledge and skills to perform the leakage survey in a manner required by § 192.706,
including the appropriate leak detector equipment capable of detection leaks. Respondent did
not contest this allegation of violation and PHMSA finds a violation of 49 C.F.R. § 192.805(h).
This violation may be considered by PHMSA as a prior offense in any future PHMSA
enforcement action taken against Respondent.
23. Item 12: 49 C.F.R. § 192.911(a): The Notice alleged that Respondent’s
integrity management program failed to identify pipeline segments and pipeline facilities in high
consequence areas (HCAs) prior to calendar year 2020. As demonstrated by the additional
documents provided to PHMSA since issuance of the Notice, Respondent initiated the
development of a gas facility integrity management (IM) program in 2019 which was codified
in March 2020, and through implementation, Respondent identified mainline HCAs and
incorporated new facility HCAs into its IM program, with improvements made to include
facility piping. Respondent did not contest this allegation of violation and PHMSA finds a
violation of 49 C.F.R. § 192.911(a). This violation may be considered by PHMSA as a prior
offense in any future PHMSA enforcement action taken against Respondent.
5



IV. Civil Penalty:
24. Item 10: The Notice proposed assessing a civil penalty in the amount of $58,400
for Item 10. In its Response, and during the informal meetings between the Parties, Respondent
provided additional information regarding its belief that the device at issue was sufficient for
leak detection under the regulations, . Based on the information provided, PHMSA agrees to
reduce the proposed civil penalty in consideration of the Respondent’s good faith. As such,
Respondent shall pay a reduced civil penalty in the amount of $41,126.
25. Item 12: The Notice proposed assessing a civil penalty in the amount of $63,900
for Item 12. In its Response, and during the informal meetings between the Parties, Respondent
provided additional information related to the steps it undertook prior to the inspection to
identify facility HCAs and assess mainline pipe including within facilities, and actions it was
taking to incorporate the facility piping into its integrity management program. Based on the
information provided, PHMSA agrees to reduce the proposed civil penalty under the good faith
factor. As such, Respondent shall pay a reduced civil penalty in the amount of $46,656.
26. Items 2, 3, 5, 6, and 8: The Notice proposed penalties for probable violations
associated with Items 2, 3, 5, 6, and 8, in the amount of $237,600. Respondent did not contest
these proposed penalties.
27. Respondent shall pay a total civil penalty in the amount of $324,382, to be paid in
full no later than 20 days from the Effective Date of this Agreement.
V. Compliance Order:
28. The Notice proposed certain compliance order actions to address the non-
compliance alleged in the Notice for Items 6, 9, 10, 11, and 12. Respondent did not contest the
Proposed Compliance Order, but requested certain clarifications.
29. With respect to the Proposed Compliance Order obligations for Item 10, the
Parties agree that Respondent demonstrated that it has satisfied the terms of the Proposed
Compliance Order with respect to this Item by (a) identifying and providing a list to PHMSA of
the unodorized Class 3 locations which used the Gas Alert Max leak detection equipment, and
(b) conducting a leak survey of the unodorized pipelines in Class 3 locations with leak detection
equipment designed and calibrated to identify leaks on underground pipelines.
30. Accordingly, as agreed to by the Parties, Respondent must undertake the
following corrective measures for Items 6, 9, 10, 11 and 12:
A. In regards to Item 6 of the Notice pertaining to the inspection of each pipeline or
portion of pipeline that is exposed to the atmosphere for evidence of atmospheric
corrosion at least once every 3 calendar years, but with intervals not to exceeding
39 months, Respondent must:
1. Provide the Central Region Director with a list of all the spans exposed to the
atmosphere in the western district of the Rocky Mountain Operating Region
6



B. C. D. and the associated atmospheric inspection records within 60 days of the
Effective Date of this Consent Agreement.
2. Provide a procedure modification to the Central Region Director for approval
to ensure complete atmospheric inspections are accomplished and records are
maintained going forward within 60 days of the Effective Date of this
Consent Agreement.
In regards to Item 9 of the Notice pertaining to the review of the effectiveness and
adequacy of corrosion control procedures used in normal operation and
maintenance activities per § 192.605(b)(8), Respondent must:
1. Perform a review of current corrosion control process and procedures
contained in its operations and maintenance manual. The review must be
performed by personnel not involved in the work or the operations being
reviewed. The evaluation method should also allow the operator to objectively
evaluate the strengths and weaknesses of its personnel and processes that
support each of the elements of the corrosion control process and procedures
contained in the operations and maintenance manual, as well as areas needing
improvement. Respondent shall provide a plan for approval to the Central
Region Director identifying the review criteria, scope, frequency, and methods
used to assess the application of and conformance with current corrosion
control process and procedures in Respondent’s operation and maintenance
manual within 90 days of the Effective Date of this Consent Agreement.
2. Within 365 days of the Effective Date of this Consent Agreement, Respondent
shall provide a schedule for addressing identified areas of concern. The
management responsible for the area being reviewed or evaluated shall ensure
that findings are addressed within the defined response times.
3. Respondent shall submit a summary of the corrective actions taken to address
the areas of concern quarterly to the Central Region Director until closure of
the Consent Agreement.
In regards to Item 11 of the Notice pertaining to Respondent failing to provide
training to ensure that individuals performing leakage surveys have the necessary
knowledge and skills to perform the leakage survey in a manner required by
§ 192.706, Respondent must develop and commence training to ensure that
personnel are equipped with the knowledge of using the appropriate leak
detection equipment for relevant tasks within 90 days of the Effective Date of this
Consent Agreement.
In regards to Item 12 of the Notice pertaining to Respondent failing to identify
pipeline segments in high consequence areas including pipeline facilities prior to
calendar year 2020, Respondent must:
7



1. 2. Provide a plan which will outline Respondent’s enhancements to its existing
HCA facility screening process, including an outline of documentation to
reflect the enhancements, for approval to review by the Central Regional
Director within 120 days of the Effective Date of this Consent Agreement.
Identify and incorporate any additional facility HCAs using the enhanced
HCA facility screening process set forth in D.1. above into Respondent’s
Facility Integrity Management Plan within 365 days of the Effective Date of
this Consent Agreement.
VI. Enforcement:
31. This Agreement is subject to all enforcement authorities available to PHMSA
under 49 U.S.C. § 60101, et seq., and 49 C.F.R. Part 190, including administrative civil
penalties under 49 U.S.C. § 60122, of up to $225,134 per violation for each day the violation
continues and referral of the case to the Attorney General for judicial enforcement, if PHMSA
determines that Respondent is not complying with the terms of this Agreement in accordance
with determinations made by the Director, or if appealed, in accordance with decisions of the
Associate Administrator. The maximum civil penalty amounts are adjusted annually for
inflation. See 49 C.F.R. § 190.223.
VII. Dispute Resolution:
32. The Director and Respondent will informally attempt to resolve any disputes
arising under this Agreement, including but not limited to any decision of the Director. If
Respondent and the Director are unable to informally resolve the dispute within 15 calendar
days after the dispute is first raised, in writing, to the Director, Respondent may submit a written
request for a determination resolving the dispute from the Associate Administrator for Pipeline
Safety, PHMSA. Such request must be made in writing and provided to the Director, counsel for
the Central Region, and to the Associate Administrator for Pipeline Safety, no later than 10
calendar days from the 15 day deadline for informal resolution referenced in this paragraph.
Along with its request, Respondent must provide the Associate Administrator with all
information Respondent believes is relevant to the dispute. Decisions of the Associate
Administrator under this paragraph will constitute final agency action. The existence of a
dispute and PHMSA’s consideration of matters placed in dispute will not excuse, toll, or
suspend any term or timeframe for completion of any work to be performed under this
Agreement during the pendency of the dispute resolution process, except as agreed by the
Director or the Associate Administrator in writing, or ordered by a court of competent
jurisdiction.
VIII. Effective Date:
33. Agreement.
The term “Effective Date,” as used herein, is the date on which the Consent
Order is issued by the Associate Administrator, PHMSA, incorporating the terms of this
8



IX. Modification:
34. The terms of this Agreement may be modified by mutual agreement of the
Parties. Such modifications must be in writing and signed by both parties.
X. Ratification:
35. The Parties’ undersigned representatives certify that they are fully authorized to
enter into the terms and conditions of this Agreement and to execute and legally bind such party
to this document.
The Parties hereby agree to all conditions and terms of this Agreement.
[Signature Lines on Following Page]
9



For Tallgrass Interstate Gas Transmission, LLC:
Date
For PHMSA:
Director, Central Region, Office of Pipeline Safety
Date April 8, 2022
10

32021043NOPV_Op Resp to Notice and Req for Hearing and Prelim Stmnt of Issues (Part 2)_01062022_(20-179274).pdf

U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
)
In the Matter of )
)
Tallgrass Interstate Gas Transmission, LLC, ) CPF No. 3-2021-043-NOPV
)
Respondent. )
)
REQUEST FOR INFORMAL CONFERENCE, REQUEST FOR HEARING AND
PRELIMINARY STATEMENT OF ISSUES FOR NOPV ITEMS 6, 9, 10, 11 and 12
WRITTEN RESPONSE TO NOPV ITEMS 1, 2, 3, 4, 5, 7 and 8
I. Request for Informal Conference
Pursuant to 49 U.S.C. § 60117(b)(1)(B), Tallgrass Interstate Gas Transmission, LLC
(Tallgrass) respectfully requests an informal conference to discuss Items 6, 9, 10, 11 and 12 of the
above-referenced, December 7, 2021 Notice of Probable Violation, Proposed Civil Penalty, and
Proposed Compliance Order (NOPV). Tallgrass is hopeful that through further discussion of the
facts and circumstances around these Items that these portions of the NOPV can be addressed
without a hearing.
II. Request for Hearing
Pursuant to 49 C.F.R. §§ 190.208(a)(4), 190.208(b)(4), and 190.211(b), Tallgrass
respectfully requests an in-person hearing regarding the proposed civil penalties and proposed
compliance orders for Items 6, 9, 10, 11 and 12. If a hearing is held, Tallgrass will be represented
by counsel at the hearing.
III. Preliminary Statement of Issues
In the informal conference, and at the hearing if one is necessary, Tallgrass intends to raise
the following issues:



A. Item 6 – 49 C.F.R. § 192.481 Atmospheric Corrosion Control Monitoring
1. Whether the proposed compliance order is necessary given the remedial efforts that
Tallgrass has already undertaken.
2. Whether PHMSA should reduce the proposed civil penalty for this Item.
B. Item 9 – 49 C.F.R. § 192.605(b)(8) Periodic Review of O&M Manual
1. Whether the proposed compliance order is overbroad, in that it proposes to require
audits of conformity with the entire operations and maintenance procedure when
the underlying facts related to this Item involve specific corrosion issues.
2. Whether Tallgrass has already provided to PHMSA, via a series of self-report
communications and data submittals, with extensive information regarding the
causes of the corrosion control deficiencies, steps taken to remedy them, and plans
for additional remedial work.
3. Whether a proposed compliance order that proposes to require extensive internal
auditing and mandatory self-reporting of any compliance findings to PHMSA is
consistent with applicable law and regulation, is necessary, is reasonable, and is
consistent with PHMSA’s well-considered policy of encouraging candid, internal
self-evaluation and self-reporting.
4. Whether the proposed compliance order must be withdrawn.
C. Item 10 – 49 C.F.R. § 192.706(a) Leakage Surveys
1. Whether the timing and scope of the proposed compliance order should be modified
to account for Tallgrass’ ongoing efforts to upgrade leak detection equipment.
2. Whether PHMSA should reduce the proposed civil penalty based on PHMSA’s
guidance on the types of leak detection equipment that operators may use, and given
Tallgrass’ past efforts with regard to leak detection.
D. Item 11 – 49 C.F.R. § 192.805(h) Operator Qualification
1. Whether the timing of the proposed compliance order should be adjusted to
account for Tallgrass’ ongoing efforts to upgrade leak detection equipment.
E. Item 12 – 49 C.F.R. § 192.911(a) Integrity Management



1. Whether Tallgrass had identified the High Consequence Areas (HCA) listed in the
NOPV prior to 2020.
2. Whether PHMSA should reduce the proposed civil penalty for this Item and make
certain factual clarifications in the Final Order.
3. Whether the terms of the proposed compliance order have already been completed,
making the order no longer necessary.
IV. Written Response to NOPV Items 1, 2, 3, 4, 5, 7 and 8
Pursuant to 49 C.F.R. §§ 190.208(a)(2) and 190.208(a)(3), Tallgrass provides a written
response to Items 1, 2, 3, 4, 5, 6, 7, 8, 11 and 12 of the NOPV.
A. Item 1 – 49 C.F.R. § 191.5(c)
Tallgrass does not contest this warning Item.
B. Items 2, 3, 4, 5, 6 and 8 – 49 C.F.R. §§ 192.463(a), 192.465(a), 192.465(b),
192.465(c), 192.605(a).
The above-listed Items all relate to Tallgrass’ 2020 self-report of external corrosion control
survey and data issues. Tallgrass does not contest these Items. However, Tallgrass respectfully
requests that the Final Order in this case reflect the Company’s proactive efforts to resolve the
underlying issues and improve its practices and procedures. Those efforts are summarized below.
As listed in detail in the Company’s self-report communications, after discovering these
issues, Tallgrass took steps to verify that they did not present safety concerns. Specifically,
Tallgrass conducted un-planned close interval surveys (CIS) and reads of cathodic protection (CP)
test stations, as well as an analysis of In-Line Inspection and other inspection and repair data on
affected pipeline segments. The results of these efforts confirmed that there were no immediate
corrosion-related safety concerns. Tallgrass then began several remedial actions to prevent
recurrence of the corrosion survey and data issues, including additional training, improved
corrosion data collection and tracking tools, review and amendment of relevant corrosion
procedures, establishment of an annual corrosion program performance review meeting, quarterly
data reviews, addition of personnel, and additional CIS and CP system improvements.
C. Item 7 – 49 C.F.R. § 192.605(a) Operations and Maintenance Procedures
Tallgrass respectfully requests that this warning item be withdrawn. This Item was a result
of a discrepancy between different Company records regarding the pipe materials properties for



certain pipe installed in the Trenton Lateral. Tallgrass undertook efforts to resolve this discrepancy
by undertaking a series of pipeline digs. These digs confirmed that the information captured
through the x-ray location index, pipe feature data obtained during inspections, survey data, and
photos taken during construction is accurate. The purpose of the digs was to confirm coating type,
as there were only two pipe types (FBE coated and ARO coated pipe) purchased and installed on
the Trenton lateral. Tallgrass also conducted ultrasonic wall thickness testing during the digs.
Tallgrass’ PODS pipeline data model was updated to reflect that these properties are now
confirmed for this pipe.
Respectfully submitted this 6th day of
January 2022.
Jennifer Eckels
Manager - Compliance
370 Van Gordon Street
Lakewood, CO 80228
Phone: (303) 763-3486
CC: Tallgrass: Byron Gale, Jay Meyers, Jarid Kling, Nicole Longwell, Crystal Heter
PHMSA: AJ McKean, James Bunn

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/32021043NOPV>
- Source ID: `phmsa-enforcement`
- SHA-256: `555580b7b5163cd397ca8a0999915c5e6603dc9676f02d5dc5e3748d90788986`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-25T10:58:51.808Z
- Document slug: `phmsa-enforcement-32021043nopv`

### Source metadata

```json
{
  "cpf": "32021043NOPV",
  "operator": "TALLGRASS INTERSTATE GAS TRANSMISSION, LLC",
  "region": "Central",
  "pipelineType": "INTERSTATE GAS TRANSMISSION, JURISDICTIONAL GAS GATHERING",
  "caseStatus": "CLOSED",
  "citedSections": [
    "191.5(c)",
    "192.463(a)",
    "192.465(a)",
    "192.465(b)",
    "192.465(c)",
    "192.481(a)",
    "192.605(a)",
    "192.605(b)(8)",
    "192.706(a)",
    "192.805(h)",
    "192.911(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 14,
  "attachments": [
    {
      "name": "32021043NOPV_Closure Letter_09122024_(20-179274).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_Closure%20Letter_09122024_(20-179274).pdf",
      "bytes": 232851,
      "category": "agency_document"
    },
    {
      "name": "32021043NOPV_Closure Letter_09122024_(20-179274)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_Closure%20Letter_09122024_(20-179274)_text.pdf",
      "bytes": 99516,
      "category": "agency_document"
    },
    {
      "name": "32021043NOPV_Consent Agreement and Order_04132022_(20-179274).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_Consent%20Agreement%20and%20Order_04132022_(20-179274).pdf",
      "bytes": 384376,
      "category": "agency_document"
    },
    {
      "name": "32021043NOPV_Consent Agreement and Order_04132022_(20-179274)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_Consent%20Agreement%20and%20Order_04132022_(20-179274)_text.pdf",
      "bytes": 231462,
      "category": "agency_document"
    },
    {
      "name": "32021043NOPV_Op Resp to Notice and Req for Hearing and Prelim Stmnt of Issues (Part 1)_01062022_(20-179274).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_Op%20Resp%20to%20Notice%20and%20Req%20for%20Hearing%20and%20Prelim%20Stmnt%20of%20Issues%20(Part%201)_01062022_(20-179274).pdf",
      "bytes": 168684,
      "category": "agency_document"
    },
    {
      "name": "32021043NOPV_Op Resp to Notice and Req for Hearing and Prelim Stmnt of Issues (Part 2)_01062022_(20-179274).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_Op%20Resp%20to%20Notice%20and%20Req%20for%20Hearing%20and%20Prelim%20Stmnt%20of%20Issues%20(Part%202)_01062022_(20-179274).pdf",
      "bytes": 226327,
      "category": "agency_document"
    },
    {
      "name": "32021043NOPV_PCP PCO_12072021_(20-179274).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_PCP%20PCO_12072021_(20-179274).pdf",
      "bytes": 462926,
      "category": "case_document"
    },
    {
      "name": "32021043NOPV_PCP PCO_12072021_(20-179274)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_PCP%20PCO_12072021_(20-179274)_text.pdf",
      "bytes": 870022,
      "category": "case_document"
    },
    {
      "name": "32021043NOPV_PHC Hearing Canceled_06022022_(20-179274).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_PHC%20Hearing%20Canceled_06022022_(20-179274).pdf",
      "bytes": 47785,
      "category": "agency_document"
    },
    {
      "name": "32021043NOPV_PHC Hearing Canceled_06022022_(20-179274)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_PHC%20Hearing%20Canceled_06022022_(20-179274)_text.pdf",
      "bytes": 3346,
      "category": "agency_document"
    },
    {
      "name": "32021043NOPV_PHC Hearing Rescheduled_04072022_(20-179274).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_PHC%20Hearing%20Rescheduled_04072022_(20-179274).pdf",
      "bytes": 148108,
      "category": "agency_document"
    },
    {
      "name": "32021043NOPV_PHC Hearing Rescheduled_04072022_(20-179274)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_PHC%20Hearing%20Rescheduled_04072022_(20-179274)_text.pdf",
      "bytes": 71375,
      "category": "agency_document"
    },
    {
      "name": "32021043NOPV_PHC Hearing Scheduled_01192022_(20-179274).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_PHC%20Hearing%20Scheduled_01192022_(20-179274).pdf",
      "bytes": 172679,
      "category": "agency_document"
    },
    {
      "name": "32021043NOPV_PHC Hearing Scheduled_01192022_(20-179274)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021043NOPV/32021043NOPV_PHC%20Hearing%20Scheduled_01192022_(20-179274)_text.pdf",
      "bytes": 82359,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 7,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "TALLGRASS INTERSTATE GAS TRANSMISSION, LLC"
}
```