# MISSISSIPPI HUB, LLC — Notice of Probable Violation

**Citation:** CPF 32021056NOPV  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2021-10-07

CLOSED notice of probable violation citing 192.631(e)(2).

## Document text

Notice of Probable Violation involving MISSISSIPPI HUB, LLC. PHMSA's enforcement data identifies the cited regulation as 192.631(e)(2). The case was opened on 2021-10-07 and is reported as closed as of 2022-08-03. Proposed civil penalty: $23,100. Assessed civil penalty: $0. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32021056NOPV_Final Order_08032022_(20-179020).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021056NOPV/32021056NOPV_Final%20Order_08032022_(20-179020).pdf

32021056NOPV_Final Order_08032022_(20-179020)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021056NOPV/32021056NOPV_Final%20Order_08032022_(20-179020)_text.pdf

32021056NOPV_Operator Response to Notice_12032021_(20-179020).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021056NOPV/32021056NOPV_Operator%20Response%20to%20Notice_12032021_(20-179020).pdf

32021056NOPV_PCP_10072021_(20-179020).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021056NOPV/32021056NOPV_PCP_10072021_(20-179020).pdf

32021056NOPV_PCP_10072021_(20-179020)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021056NOPV/32021056NOPV_PCP_10072021_(20-179020)_text.pdf

32021056NOPV_Final Order_08032022_(20-179020)_text.pdf

August 3, 2022
VIA ELECTRONIC MAIL TO: paul.bienawski@enstorinc.com
Mr. Paul Bieniawski
Chief Executive Officer
Enstor Gas, LLC
10375 Richmond Ave., Suite 1900
Houston, Texas 77042
Re: CPF No. 3-2021-056-NOPV
Dear Mr. Bieniawski:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and reduces the civil penalty to $0. This enforcement action is now closed. Service of
the Final Order by e-mail is effective upon the date of transmission and acknowledgement of
receipt as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Gregory A. Ochs, Director, Central Region, Office of Pipeline Safety, PHMSA
Mr. Todd Cash, Vice President, Compliance, Enstor Gas, LLC, todd.cash@enstorinc.com
Ms. Lisa M. Tonery, Counsel, Orrick, Herrington & Sutcliffe LLP, ltonery@orrick.com
Ms. Mariah T. Johnston, Counsel, Orrick, Herrington & Sutcliffe LLP,
mjohnston@orrick.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
Mississippi Hub, LLC, ) CPF No. 3-2021-056-NOPV
an affiliate of Enstor Gas, LLC, )
)
Respondent. )
____________________________________)
FINAL ORDER
From November 6 through 20, 2020, pursuant to 49 U.S.C. § 60117, a representative of the
Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety
(OPS), conducted a pipeline safety inspection of the control room procedures and records of
Mississippi Hub, LLC, an affiliate of Enstor Gas, LLC (Enstor or Respondent), in Katy, Texas.
1
As a result of the inspection, the Director, Central Region, OPS (Director), issued to Respondent,
by letter dated October 7, 2021, a Notice of Probable Violation and Proposed Civil Penalty
(Notice).2 In accordance with 49 C.F.R. § 190.207, the Notice proposed finding that Enstor had
violated 49 C.F.R. § 192.631(e)(2) and proposed assessing a civil penalty of $23,100 for the
alleged violation.
After requesting and receiving an extension of time to respond,3 Enstor responded to the Notice
by letter dated December 3, 2021 (Response). The company did not contest the allegation of
violation but provided an explanation of its actions and requested that the proposed civil penalty
be reduced or eliminated. Respondent did not request a hearing and therefore has waived its
right to one.
1 In February 2019, Sempra Energy sold Mississippi Hub, LLC to ArcLight Capital Partners, LLC. ArcLight Capital
Partner’s affiliate, Enstor Gas, LLC, began operating the Mississippi Hub facility in August 2019. See Response at
1-2; see also Enstor Press Release (Feb. 7, 2019), available at https://www.enstorinc.com/news/sempra-energy-
completes-sale-us-natural-gas-storage-assets-arclight-capital-partners (last accessed May 10, 2022). On May 11,
2022, ArcLight Capital Partners sold Enstor to Infrastructure Investment Funds. See Enstor Press Release (May 11,
2022), available at https://www.enstorinc.com/news/iif-acquires-enstor-gas-arclight (last accessed June 28, 2022).
2 Although the Notice was addressed to “Enstor-Mississippi Hub,” Respondent explained that the Mississippi Hub
facility is operated by Enstor Gas, LLC, an affiliate. Response at 1.
3 The request for a time extension was submitted by “attorneys for Mississippi Hub, LLC.”



FINDING OF VIOLATION
In its Response, Enstor did not contest the allegation in the Notice that it violated 49 C.F.R. Part
192, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 192.631(e)(2), which states:
§ 192.631 Control room management.
(a) . . .
(e) Alarm Management. Each operator using a SCADA system must
have a written alarm management plan to provide for effective controller
response to alarms. An operator’s plan must include provisions to:
(1) . . .
(2) Identify at least one each calendar month points affecting safety that
have been taken off scan in the SCADA host, have had alarms inhibited,
generated false alarms, or that have had forced or manual values for periods
of time exceeding that required for associated maintenance or operating
activities;
The Notice alleged that Respondent violated 49 C.F.R. § 192.631(e)(2) by failing to have a
written alarm management plan to provide for effective controller response to alarms that
included provisions to identify at least once each calendar month points affecting safety that have
been taken off scan in the SCADA host, have had alarms inhibited, generated false alarms, or
that have had forced or manual values for periods of time exceeding that required for associated
maintenance or operating activities. Specifically, the Notice alleged that Enstor failed to identify
at least once each calendar month off-scan, inhibited, manual or forced alarms for the years
2017, 2018, and 2019.
Respondent did not contest this allegation of violation. Accordingly, based upon a review of all
of the evidence, I find that Respondent violated 49 C.F.R. § 192.631(e)(2) by failing to have a
written alarm management plan to provide for effective controller response to alarms that
included provisions to identify at least once each calendar month points affecting safety that have
been taken off scan in the SCADA host, have had alarms inhibited, generated false alarms, or
that have had forced or manual values for periods of time exceeding that required for associated
maintenance or operating activities.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$200,000 per violation for each day of the violation, up to a maximum of $2,000,000 for any
related series of violations.4
In determining the amount of a civil penalty under 49 U.S.C. § 60122 and 49 C.F.R. § 190.225, I
4 These amounts are adjusted annually for inflation. See 49 C.F.R. § 190.223.



must consider the following criteria: the nature, circumstances, and gravity of the violation,
including adverse impact on the environment; the degree of Respondent’s culpability; the history
of Respondent’s prior offenses; any effect that the penalty may have on its ability to continue
doing business; the good faith of Respondent in attempting to comply with the pipeline safety
regulations; and self-disclosure or actions to correct a violation prior to discovery by PHMSA.
In addition, I may consider the economic benefit gained from the violation without any reduction
because of subsequent damages, and such other matters as justice may require. The Notice
proposed a total civil penalty of $23,100 for the violation cited above.
Item 1: The Notice proposed a civil penalty of $23,100 for Respondent’s violation of 49 C.F.R.
§ 192.631(e)(2) for failing to have a written alarm management plan to provide for effective
controller response to alarms that included provisions to identify at least once each calendar
month points affecting safety that have been taken off scan in the SCADA host, have had alarms
inhibited, generated false alarms, or that have had forced or manual values for periods of time
exceeding that required for associated maintenance or operating activities.
In its Response, Enstor requested a reduction or elimination of the proposed civil penalty.
Specifically, Respondent stated that in August 2019, after Enstor acquired the Mississippi Hub
facility, it updated the form to record the safety points set forth in § 192.631(e)(2). Response at
2. Enstor also stated that its SCADA team provided the monthly alarm and event history to the
Remote Operations Center (ROC) to utilize in completing its monthly alarm review.5 Id.
Further, in preparing for the November 2020 OPS inspection, Enstor realized that its definition
of “safety-related points” only included alarms, and subsequently revised it to include points
affecting safety that have been taken off scan in the SCADA host, have had alarms inhibited,
generated false alarms, or that have had forced or manual values for periods of time exceeding
that required for associated maintenance or operating activities. Id.
Enstor requested a reduction or elimination of the penalty for three reasons. First, it claimed that
this violation was a minor, record-keeping issue that did not impact pipeline safety. Id. at 3.
Second, Enstor stated that it began operating the facility in late 2019, and once it began to do so,
made updates to its control room management forms and procedures prior to the 2020 inspection.
Id. Third, Enstor explained that it has a history of compliance, and worked to ensure its written
procedures were adequate for the safe operation of its pipeline facilities in response to the Notice
of Amendment that was served concurrently with this case. Id. at 3-4; see also CPF 3-2021-055-
NOA.
I will address each of Respondent’s arguments in order. First, the Pipeline Safety Violation
Report already notes that this violation minimally affected pipeline safety under the civil penalty
assessment factor for the gravity of the violation. See Pipeline Safety Violation Report
(Violation Report) at 6 (Oct. 12, 2021) (on file with PHMSA). Further, under the civil penalty
assessment factor for the nature of the violation, the Violation Report correctly notes that this is
an activities violation, rather than a record-keeping violation. Id. at 5. Record-keeping
violations involve missing, inaccurate, or incomplete records. Id. In this case, Enstor failed to
conduct an activity. Namely, Respondent failed to identify points affecting safety that have been
taken off scan in the SCADA host, have had alarms inhibited, generated false alarms, or that
have had forced or manual values for periods of time exceeding that required for associated
5 The ROC is a third-party contractor employed by Respondent. Violation Report, at 1.



maintenance or operating activities at least once each calendar month. Therefore, I see no reason
to find that the violation was merely a record-keeping, rather than a substantive, violation.
Second, Enstor argues that Sempra Energy operated the Mississippi Hub facility for a vast
majority of the period during which the violation occurred, and once it began operating the
facility in August 2019, it identified the noncompliance and took steps to address it.
Specifically, Enstor states that in August 2019, it updated Form OM1100-04 to record the safety
points set forth in § 192.631(e)(2). Response at 2. Additionally, prior to PHMSA’s inspection,
Enstor explained it revised its definition of “safety-related points.” Id. Although Enstor did not
achieve full compliance through these efforts, it had taken documented action to correct the non-
compliance prior to PHMSA discovering the violation. In his evaluation of Enstor’s response
materials, the Director supported a change under the culpability civil penalty assessment factor,
and I agree such a change is appropriate. Therefore, I am changing the culpability factor from
“[t]he operator failed to comply with an applicable requirement” to “[a]fter the operator found
the non-compliance, the operator took documented action to address the cause of the non-
compliance, and was in the process of correcting the non-compliance before PHMSA learned of
the violation.”
Third, Enstor requested a reduction or elimination of the penalty due to its history of compliance.
The Violation Report already incorporates an operator’s compliance history into the civil penalty
calculation. Violation Report at 2. Therefore, I see no reason to further alter the civil penalty
based on this information.
Accordingly, after having reviewed the record and the assessment criteria, and based upon a
finding that a culpability credit is warranted, the civil penalty assessed is reduced to $0.
Under 49 C.F.R. § 190.243, Respondent may submit a Petition for Reconsideration of this Final
Order to the Associate Administrator, Office of Pipeline Safety, PHMSA, 1200 New Jersey
Avenue, SE, East Building, 2nd Floor, Washington, DC 20590, with a copy sent to the Office of
Chief Counsel, PHMSA, at the same address. The written petition must be received no later than
20 days after receipt of the Final Order by Respondent. Any petition submitted must contain a
brief statement of the issue(s) and meet all other requirements of 49 C.F.R. § 190.243. The filing
of a petition automatically stays the payment of any civil penalty assessed. The other terms of
the order, including any corrective action, remain in effect unless the Associate Administrator,
upon request, grants a stay. If Respondent submits payment of the civil penalty, the Final Order
becomes the final administrative decision and the right to petition for reconsideration is waived.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
August 3, 2022
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/32021056NOPV>
- Source ID: `phmsa-enforcement`
- SHA-256: `31742fc2971efa0e468c99c7cbcfa8028fb831335c47fa0b8a3b6690b594158a`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-25T08:39:18.321Z
- Document slug: `phmsa-enforcement-32021056nopv`

### Source metadata

```json
{
  "cpf": "32021056NOPV",
  "operator": "MISSISSIPPI HUB, LLC",
  "region": "Central",
  "pipelineType": "INTERSTATE GAS TRANSMISSION",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.631(e)(2)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "32021056NOPV_Final Order_08032022_(20-179020).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021056NOPV/32021056NOPV_Final%20Order_08032022_(20-179020).pdf",
      "bytes": 249820,
      "category": "agency_document"
    },
    {
      "name": "32021056NOPV_Final Order_08032022_(20-179020)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021056NOPV/32021056NOPV_Final%20Order_08032022_(20-179020)_text.pdf",
      "bytes": 89736,
      "category": "agency_document"
    },
    {
      "name": "32021056NOPV_Operator Response to Notice_12032021_(20-179020).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021056NOPV/32021056NOPV_Operator%20Response%20to%20Notice_12032021_(20-179020).pdf",
      "bytes": 138080,
      "category": "party_submission"
    },
    {
      "name": "32021056NOPV_PCP_10072021_(20-179020).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021056NOPV/32021056NOPV_PCP_10072021_(20-179020).pdf",
      "bytes": 303970,
      "category": "case_document"
    },
    {
      "name": "32021056NOPV_PCP_10072021_(20-179020)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021056NOPV/32021056NOPV_PCP_10072021_(20-179020)_text.pdf",
      "bytes": 135840,
      "category": "case_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "MISSISSIPPI HUB, LLC"
}
```