# TALLGRASS PONY EXPRESS PIPELINE, LLC — Notice of Probable Violation

**Citation:** CPF 32021082NOPV  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2021-12-01

CLOSED notice of probable violation citing 195.505(b).

## Document text

Notice of Probable Violation involving TALLGRASS PONY EXPRESS PIPELINE, LLC. PHMSA's enforcement data identifies the cited regulation as 195.505(b). The case was opened on 2021-12-01 and is reported as closed as of 2024-10-16. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32021082NOPV_Closure Letter_10162024_(20-172259).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021082NOPV/32021082NOPV_Closure%20Letter_10162024_(20-172259).pdf

32021082NOPV_Closure Letter_10162024_(20-172259)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021082NOPV/32021082NOPV_Closure%20Letter_10162024_(20-172259)_text.pdf

32021082NOPV_Final Order_01242023_(20-172259).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021082NOPV/32021082NOPV_Final%20Order_01242023_(20-172259).pdf

32021082NOPV_Final Order_01242023_(20-172259)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021082NOPV/32021082NOPV_Final%20Order_01242023_(20-172259)_text.pdf

32021082NOPV_Operator Response to Notice_12312021_(20-172259).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021082NOPV/32021082NOPV_Operator%20Response%20to%20Notice_12312021_(20-172259).pdf

32021082NOPV_PCO_12012021_(20-172259).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021082NOPV/32021082NOPV_PCO_12012021_(20-172259).pdf

32021082NOPV_PCO_12012021_(20-172259)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021082NOPV/32021082NOPV_PCO_12012021_(20-172259)_text.pdf

32021082NOPV_Final Order_01242023_(20-172259)_text.pdf

January 24, 2023
VIA ELECTRONIC MAIL TO: matt@tallgrass.com
Matthew Sheehy
President and Chief Executive Officer
Tallgrass Energy, LP
370 Van Gordon Street
Lakewood, Colorado 80228
Re: CPF No. 3-2021-082-NOPV
Dear Mr. Sheehy:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and specifies actions that need to be taken by Tallgrass Pony Express Pipeline, LLC, a
subsidiary of Tallgrass Energy, LP, to comply with the pipeline safety regulations. When the
terms of the compliance order are completed, as determined by the Director, Central Region, this
enforcement action will be closed. Service of this Final Order by e-mail is effective upon the
date of transmission and acknowledgement of receipt as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure (Final Order)
cc: Mr. Gregory A. Ochs Director, Central Region, Office of Pipeline Safety, PHMSA
Ms. Jennifer Eckels, Manager, Compliance, Tallgrass Energy, jennifer.eckels@tallgrass.com
Ms. Crystal Heter, Chief Operating Officer, Tallgrass Energy, crystal.heter@tallgrass.com
Mr. Brad Armsbury, Compliance Engineer, Tallgrass Energy, brad.armsbury@tallgrass.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Tallgrass Pony Express Pipeline, LLC, ) CPF No. 3-2021-082-NOPV
a subsidiary of Tallgrass Energy, LP, )
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
From November 23 through 24, 2020, pursuant to 49 U.S.C. § 60117, a representative of the
Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety
(OPS), conducted an inspection of the records and facilities of Pony Express Pipeline, LLC
(Respondent) in Lakewood, Colorado.1 The Pony Express Pipeline is an approximately 900-mile
crude oil pipeline spanning several states from Wyoming to Oklahoma, and is owned and
operated by Tallgrass Energy, LP (Tallgrass).
As a result of the inspection, the Director, Central Region, OPS (Director), issued to Respondent,
by letter dated December 1, 2021, a Notice of Probable Violation (Notice) and Proposed
Compliance Order (PCO). In accordance with 49 C.F.R. § 190.207, the Notice proposed finding
that Respondent had violated 49 C.F.R. Part 195 and proposed ordering Respondent to take
certain measures to correct the alleged violation. Tallgrass responded to the Notice by letter
dated December 31, 2021 (Response). Tallgrass’ Response contested the allegation, offered
additional information in response to the Notice, and requested that the PCO either be
withdrawn, modified, or issued as a Notice of Amendment (NOA). Respondent did not request a
hearing and therefore has waived its right to one.
FINDING OF VIOLATION
The Notice alleged that Respondent violated 49 C.F.R. Part 195, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.505(b), which states:
§ 195.505 Qualification program.
1 The inspection involved the collection of additional records through June 2021.



Each operator shall have and follow a written qualification program. The
program shall include provisions to:
(a) . . . .
(b) Ensure through evaluation that individuals performing covered tasks are
qualified;
The Notice alleged that Respondent violated 49 C.F.R. § 195.505(b) by failing to have and
follow a written qualification program that includes provisions to ensure through evaluation that
individuals performing covered tasks are qualified. Specifically, Tallgrass’ Operator
Qualification (OQ) program failed to ensure through evaluation that individuals performing
covered tasks are qualified to recognize and react to abnormal operating conditions.
In the Response, Tallgrass contested the alleged violation described in the Notice. Tallgrass
argued that PHMSA did not meet its burden of proving a violation and that the Notice and
supporting evidence (Violation Report) fail to explain why the level of detail in its OQ program
did not satisfy the regulation. Tallgrass stated its OQ program addresses both generic and
covered-task-specific abnormal operating conditions and contains sufficient detail to comply
with § 195.505 (and is in accordance with preamble discussions in the 1999 final rule codifying
that section).
2 Tallgrass asserted that the responses to abnormal operating conditions contained
in its OQ program are also in accordance with relevant PHMSA guidance on this topic, as they
provide description of the task-specific abnormal operating conditions that individuals could
reasonably be expected to encounter and a description of appropriate responses.3 Tallgrass
explained it conducts both on-the-job and computer-based training (CBT) on each covered task.
Attached to the Response as examples are screen shots from Respondent’s CBT addressing
abnormal operating condition responses during various tasks. Tallgrass also asserted that an
April 28, 2021 email response to PHMSA acknowledging PHMSA’s concern regarding the
generic nature of task analysis forms that is referenced in the Notice does not substantiate the
alleged violation, but rather reflects Respondent’s “polite and solicitous response to PHMSA’s
concern, with a commitment to continue to improve its OQ program.”
Tallgrass also argued that if PHMSA does not withdraw the Notice, the agency should convert
the PCO into an NOA. Tallgrass stated an NOA is the more appropriate mechanism for
improving Respondent’s procedures.
Finally, Tallgrass requested that if the Notice is not withdrawn, PHMSA should revise the
timelines in the PCO for requalifying individuals and providing a summary report to the
Director. Respondent requested that those respective 90- and 120-day timelines be modified to
run from the date of the Director’s approval of the revised OQ program, rather than from the date
this Final Order is issued.
2 Pipeline Safety: Qualification of Pipeline Personnel, 64 Fed. Reg. 46,853, 46,861 (Aug. 27, 1999).
3 PHMSA OQ Frequently Asked Questions, Treatment of Abnormal Operating Conditions; available online at:
https://www.phmsa.dot.gov/pipeline/operator-qualifications/oq-frequently-asked-questions; PHMSA Operator
Qualification Enforcement Guidance at 15 (Aug. 25, 2016); available online at:
https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/OQ Enforcement Guidance %288 25 2016%29.pdf.



Having considered the evidence in the record, I find PHMSA has satisfied its evidentiary burden
to prove a violation. Specifically, I find that Respondent’s OQ program failed to have provisions
to ensure through evaluation that individuals performing covered tasks are qualified as alleged in
the Notice.
4 The qualification documents in the record that were used to qualify Respondent’s
employees are generic in nature and lack sufficiently detailed information as to how individuals
perform assigned covered tasks and recognize and react to abnormal operating conditions. For
example, in the Tallgrass task analysis form addressing performance of the “Valve Visual
Inspection and Partial Operation” task, one of the abnormal operating conditions is described just
as “[h]azardous atmospheric conditions” with the required reaction described as “[o]nly continue
to work if safe to do so and with appropriate PPE”
.
5 The form contains no further explanations
governing what constitutes a hazardous atmospheric condition, how to identify the hazard, how
to determine whether it is safe to continue work, what constitutes appropriate PPE, or other
critical information. A review of all the task analysis forms provided during the inspection
reveals many similar examples throughout of abnormal operating conditions and required
reactions which do not provide individuals the knowledge or skill to be able to accurately or
reliably identify abnormal operating conditions and safely react to them. Nor do the task
analysis forms distinguish between employees, contractors, or other personnel and if or how their
required reactions to abnormal operating conditions differ.6
In the CBT examples attached to the Response, an instruction to “notify appropriate company
personnel” in the event of an abnormal operating condition (or an emergency) fails to specify
who the appropriate company personnel to notify are, or how an employee, contractor, or other
individual would make such a determination (e.g., no mention of any applicable operator
procedure or any other response resource to direct an employee’s reaction).
7 The example
addressing recognition of “application of improper coating” on page 8 of the Response includes
an image without identifying whether the image is an example of coating that is proper or
improper. The document does not explain or illustrate how the pictured coating helps an
individual determine when coating is considered improper. An individual receiving this training
is not provided with the knowledge or skill to be able to appropriately recognize the described
abnormal operating condition.
Further, the performance evaluation forms provided by Tallgrass as part of PHMSA’s inspection
state “[t]he individual will need to be able to discuss recognizing and reacting to Abnormal
4 Section 195.505(b) requires each operator to ensure through evaluation that individuals performing covered tasks
are qualified. The term “qualified” means that an individual has been evaluated and can perform assigned covered
tasks and can recognize and react to abnormal operating conditions. See § 195.503.
5 See Tallgrass Task Analysis Form “O&M Form OM100-82_GL” addressing Task No. 0331_GL (Violation
Report, Exhibit A, page 74 of 127).
6 PHMSA OQ Frequently Asked Questions (supra note 2) at FAQ No. 3 (“[t]he operator must ensure that any
individuals performing covered tasks, including contractors and other parties, such as other operator personnel
providing routine operation and maintenance (O&M) tasks or mutual aid, comply with the requirements of the
operator’s OQ program. See 49 CFR 192.805(b) and 195.505(b)”).
7 See, e.g., Response, at 7, 8.



Operating Conditions (AOCs) in accordance with company policies and procedures.”8 However,
the evaluation forms do not reference Respondent’s specific applicable policies and procedures
for a particular abnormal operating condition. The absence of references to the governing
policies and procedures prevents an evaluation from assessing whether an individual is qualified
under § 195.505.
9 Tallgrass does not appear to have incorporated its procedures into the
qualification evaluation process for the tasks reviewed during the inspection.
Tallgrass’ argument that Respondent’s task analysis forms are compliant with § 195.505(b)
because they contain the same level of detail in some examples discussed in the preamble to the
1999 rule that codified Subpart G of Part 195 is unpersuasive. The 1999 preamble addressing
the definitions in Part 195 provides a few examples of abnormal operating conditions that an
operator may be required to qualify individuals to recognize and react to. The examples given
are not purported to provide the actual substance of the procedures governing required reactions
to an abnormal operating condition or the level of specificity that is unique to an individual
operator’s covered tasks performed at its facilities.
Tallgrass requested that the Notice be converted to an NOA. PHMSA may issue an NOA
pursuant to § 190.206 when an operator’s procedures are inadequate to assure safe operation. An
NOA will specify the alleged inadequacies and the proposed revisions of the plans or procedures.
In this case, however, the appropriate compliance actions implicated by the Notice go beyond
mere correction to a procedure. Rather, Respondent must requalify and communicate procedural
changes to individuals who perform covered tasks and must also summarize compliance actions
in a report to the Director. Additionally, PHMSA’s decisions on appropriate enforcement
actions are discretionary and involve the unique considerations involved in each case.10 In
reviewing the specific compliance considerations involved here, I find the Notice is the proper
enforcement action and therefore decline Respondent’s request.
Finally, having considered Respondent’s request to revise the timelines in the PCO, I agree the
requested revisions are appropriate to provide Respondent sufficient time to requalify individuals
and provide a summary report to the Director. Therefore, I am modifying the timeframe to
complete the last two PCO actions described in the Notice. Respondent must requalify
individuals and provide a summary report of actions taken to the Director within 90- and 120-
days, respectively, after the date the Director approves Respondent’s revised OQ program.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 C.F.R.
§ 195.505(b) by failing to ensure through qualification that individuals performing covered
tasks are qualified.
8 See, e.g., Performance Assessment 86797: EWN-PE-Inspect or Test Cathodic Protection Bonds (0061) (Violation
Report, Exhibit A, page 24 of 127).
9 Id., at FAQ No. 15.
10 See PHMSA Pipeline Safety Enforcement Procedures, Section 3 (Sept. 15, 2020); available online at:
https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/2020-09/Section%203%20Selection%20of%20Administr
ative%20Enforcement%20Actions%20%20%289%2015%202020%29.pdf.



This finding of violation will be considered a prior offense in any subsequent enforcement
action taken against Respondent.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Item 1 in the Notice for violation of 49
C.F.R. § 195.505(b). Under 49 U.S.C. § 60118(a), each person who engages in the
transportation of hazardous liquids or who owns or operates a pipeline facility is required to
comply with the applicable safety standards established under chapter 601. Pursuant to the
authority of 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
following actions to ensure compliance with the pipeline safety regulations applicable to its
operations:
With respect to the violation of § 195.505(b) (Item 1) in the Notice pertaining to qualifying
individuals to react to abnormal operating conditions (AOC), Tallgrass shall:
1. Revise its OQ program to address the specific abnormal operating conditions
related to its identified covered tasks and submit to the Director for approval within
30 days of receipt of the Final Order;
2. Within 30 days of receiving Director approval of the revised OQ program as
required by paragraph 1, implement the revised OQ program and communicate
changes that affect the covered tasks to individuals performing those covered tasks
(§ 195.505(f));
3. Requalify individuals as required by the revised OQ program within 90 days of
receipt of the Director’s approval of the revised OQ program; and
4. Provide to the Director, PHMSA Central Region a report summarizing the above
actions within 120 days of receipt of the Director’s approval of the revised OQ
program.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent and demonstrating good cause for an
extension. Upon completion of the ordered actions, Respondent may request that the Director
close the case.
It is requested that Tallgrass maintain documentation of the safety improvement costs associated
with fulfilling this Compliance Order and submit the total to the Director. It is requested that
these costs be reported in two categories: 1) total cost associated with preparation/revision of
plans, procedures, studies and analyses, and 2) total cost associated with replacements, additions
and other changes to pipeline infrastructure.
Failure to comply with this Order may result in the administrative assessment of civil penalties
not to exceed $200,000, as adjusted for inflation (see 49 C.F.R. § 190.223), for each violation for
each day the violation continues or in referral to the Attorney General for appropriate relief in a



district court of the United States.
Under 49 C.F.R. § 190.243, Respondent may submit a Petition for Reconsideration of this Final
Order to the Associate Administrator, Office of Pipeline Safety, PHMSA, 1200 New Jersey
Avenue, SE, East Building, 2nd Floor, Washington, DC 20590, with a copy sent to the Office of
Chief Counsel, PHMSA, at the same address. The written petition must be received no later than
20 days after receipt of the Final Order by Respondent. Any petition submitted must contain a
statement of the issue(s) and meet all other requirements of 49 C.F.R. § 190.243. The filing of a
petition automatically stays the payment of any civil penalty assessed. The other terms of the
order, including corrective action, remain in effect unless the Associate Administrator, upon
request, grants a stay.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
January 24, 2023
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

32021082NOPV_Closure Letter_10162024_(20-172259)_text.pdf

VIA ELECTRONIC MAIL TO: matt@tallgrass.com; crystal.heter@tallgrass.com;
Danielle.Stephens@tallgrass.com
October 16, 2024
Matthew Sheehy
President and Chief Executive Officer
Tallgrass Energy, LP
370 Van Gordon Street
Lakewood, Colorado 80228
RE: CPF 3-2021-082-NOPV
Dear Mr. Sheehy:
On January 24, 2023, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to a Final Order in the above-referenced case. This Final Order included a Compliance
Order which specifies actions that need to be taken by Tallgrass Pony Express Pipeline, LLC
(Tallgrass) in order to comply with the pipeline safety regulations. Based on our review of the
documentation provided, it has been determined that Tallgrass has complied with the terms of
this Final Order.
Accordingly, this case is now closed, and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Gregory A. Ochs
Director, Central Region, OPS
Pipeline and Hazardous Materials Safety Administration
cc: Crystal Heter, Chief Operating Officer, Rockies Express Pipeline, LLC
crystal.heter@tallgrass.com
Danielle Stephens, Director-PHMSA Compliance, Rockies Express Pipeline, LLC
danielle.stephens@tallgrass.com

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/32021082NOPV>
- Source ID: `phmsa-enforcement`
- SHA-256: `b9eaefca8f24adc2e759cfb33342131a48356d46e68b2e091471ae5bc70710f4`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T05:38:47.274Z
- Document slug: `phmsa-enforcement-32021082nopv`

### Source metadata

```json
{
  "cpf": "32021082NOPV",
  "operator": "TALLGRASS PONY EXPRESS PIPELINE, LLC",
  "region": "Central",
  "pipelineType": "INTERSTATE LIQUID, INTRASTATE LIQUID",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.505(b)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 7,
  "attachments": [
    {
      "name": "32021082NOPV_Closure Letter_10162024_(20-172259).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021082NOPV/32021082NOPV_Closure%20Letter_10162024_(20-172259).pdf",
      "bytes": 239194,
      "category": "agency_document"
    },
    {
      "name": "32021082NOPV_Closure Letter_10162024_(20-172259)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021082NOPV/32021082NOPV_Closure%20Letter_10162024_(20-172259)_text.pdf",
      "bytes": 105046,
      "category": "agency_document"
    },
    {
      "name": "32021082NOPV_Final Order_01242023_(20-172259).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021082NOPV/32021082NOPV_Final%20Order_01242023_(20-172259).pdf",
      "bytes": 357018,
      "category": "agency_document"
    },
    {
      "name": "32021082NOPV_Final Order_01242023_(20-172259)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021082NOPV/32021082NOPV_Final%20Order_01242023_(20-172259)_text.pdf",
      "bytes": 99979,
      "category": "agency_document"
    },
    {
      "name": "32021082NOPV_Operator Response to Notice_12312021_(20-172259).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021082NOPV/32021082NOPV_Operator%20Response%20to%20Notice_12312021_(20-172259).pdf",
      "bytes": 327364,
      "category": "party_submission"
    },
    {
      "name": "32021082NOPV_PCO_12012021_(20-172259).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021082NOPV/32021082NOPV_PCO_12012021_(20-172259).pdf",
      "bytes": 310590,
      "category": "case_document"
    },
    {
      "name": "32021082NOPV_PCO_12012021_(20-172259)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021082NOPV/32021082NOPV_PCO_12012021_(20-172259)_text.pdf",
      "bytes": 153330,
      "category": "case_document"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "TALLGRASS PONY EXPRESS PIPELINE, LLC"
}
```