# SUNOCO PIPELINE L.P. — Warning Letter

**Citation:** CPF 32021094WL  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2021-11-30

CLOSED warning letter citing 195.432(b).

## Document text

Warning Letter involving SUNOCO PIPELINE L.P.. PHMSA's enforcement data identifies the cited regulation as 195.432(b). The case was opened on 2021-11-30 and is reported as closed as of 2021-11-30. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32021094WL_Warning Letter_11302021_(20-172180).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021094WL/32021094WL_Warning%20Letter_11302021_(20-172180).pdf

32021094WL_Warning Letter_11302021_(20-172180)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021094WL/32021094WL_Warning%20Letter_11302021_(20-172180)_text.pdf

32021094WL_Warning Letter_11302021_(20-172180)_text.pdf

WARNING LETTER
VIA ELECTRONIC MAIL TO: Matthew.Ramsey@energytransfer.com;
Gregory.Mcilwain@energytransfer.com; Eric.Amundsen@energytransfer.com;
Todd.Nardozzi@energytransfer.com
November 30, 2021
Matt Ramsey
Chief Operating Officer
Energy Transfer
8111 Westchester
Dallas, TX 75225
CPF 3-2021-094-WL
Dear Mr. Ramsey:
From February 24th, 2020 to February 25th , 2021 a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code
(U.S.C.) inspected your Sunoco Pipeline L.P. (Sunoco’s) Millenium Pipeline, Corsicana Area
Pipelines , West Texas Gulf System #2 and West Texas Gulf System #1 Pipelines from Midland
to Nederland, Texas.
As a result of the inspection, it is alleged that you have committed probable violation(s) of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The item inspected
and the probable violation is:
1. § 195.432 Inspection of in-service breakout tanks.(a) . . . .
(b) Each operator must inspect the physical integrity of in-service atmospheric and
low-pressure steel above-ground breakout tanks according to API Std 653 (except
section 6.4.3, Alternative Internal Inspection Interval) (incorporated by
reference, see § 195.3). However, if structural conditions prevent access to the tank
bottom, its integrity may be assessed according to a plan included in the operations
and maintenance manual under § 195.402(c)(3). The risk-based internal inspection
procedures in API Std 653, section 6.4.3 cannot be used to determine the internal
inspection interval.



2
Sunoco failed to perform an internal inspection of breakout tank #2694 at their Corsicana facility
within the maximum interval of 10 years as prescribed by API 653, incorporated by reference in
§ 195.432(b). Section 6.4.2.2 of API 653 states as follows: "when corrosion rates are not known
and similar service experience is not available to estimate the bottom plate minimum thickness at
the next inspection, the internal inspection interval shall not exceed 10 years."
The last API 653 out-of-service (OOS) internal inspection on tank #2694 was performed in
2006. Per Sunoco Logistics Tank Maintenance Report dated 6/17/2011, the entire floor of tank
2694 was replaced in December of 2006. The report recommended the next out-of-service
inspection to be performed in 2029. The re-inspection interval justification was based on the
prediction of zero corrosion rates for both the top side and bottom side of the new floor due to
the installation of an internal tank coating and cathodic protection for corrosion protection of the
exterior bottom floor. The next internal inspection was scheduled for 2025. The tank re-
inspection interval should have been re-established at a maximum of 10 years, or 12/2016 since
the actual corrosion rate is unknown.
Sunoco removed tank #2694 from service on 3/8/21 for cleaning and API 653 internal
inspection. The final inspection report, prepared by Sunoco’s consultant, recommended a re-
inspection interval of 20 years or the life of the coating if all required tank bottom repairs were
performed. Per Energy Transfer’s Checklist for Out-of-Service Tank Inspections for tank #2694
the repairs were completed. Accordingly, Sunoco has reset the re-inspection intervals to April
2026 for the next external inspection and April 2041 for the next out-of-service inspection.
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$218,647 per violation per day the violation persists, up to a maximum of $2,186,465 for a
related series of violations. For violation occurring on or after November 27, 2018 and before
July 31, 2019, the maximum penalty may not exceed $213,268 per violation per day, with a
maximum penalty not to exceed $2,132,679. For violation occurring on or after November 2,
2015 and before November 27, 2018, the maximum penalty may not exceed $209,002 per
violation per day, with a maximum penalty not to exceed $2,090,022. For violations occurring
prior to November 2, 2015, the maximum penalty may not exceed $200,000 per violation per
day, with a maximum penalty not to exceed $2,000,000 for a related series of violations. We
have reviewed the circumstances and supporting documents involved in this case, and have
decided not to conduct additional enforcement action or penalty assessment proceedings at this
time. We advise you to correct the item(s) identified in this letter. Failure to do so will result in
Sunoco Pipeline being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 3-2021-071-WL. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).



3
Sincerely,
Gregory Ochs
Director, Central, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Gregory Mcilwain, Senior VP Liquids Operations, Gregory.Mcilwain@energytransfer.com
Eric Amundsen, Senior VP Gas Operations, Eric.Amundsen@energytransfer.com
Todd Nardozzi, Director Regulatory Compliance, todd.nardozzi@energytransfer.com

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/32021094WL>
- Source ID: `phmsa-enforcement`
- SHA-256: `3716a1606b32f5f140d0cf15224dbd318a4c827dc04cf3fc2679e025d5eab047`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T02:56:31.835Z
- Document slug: `phmsa-enforcement-32021094wl`

### Source metadata

```json
{
  "cpf": "32021094WL",
  "operator": "SUNOCO PIPELINE L.P.",
  "region": "Central",
  "pipelineType": "INTERSTATE LIQUID",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.432(b)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "32021094WL_Warning Letter_11302021_(20-172180).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021094WL/32021094WL_Warning%20Letter_11302021_(20-172180).pdf",
      "bytes": 295410,
      "category": "agency_document"
    },
    {
      "name": "32021094WL_Warning Letter_11302021_(20-172180)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32021094WL/32021094WL_Warning%20Letter_11302021_(20-172180)_text.pdf",
      "bytes": 127194,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "SUNOCO PIPELINE L.P."
}
```