# COFFEYVILLE RESOURCES CRUDE TRANSPORTATION, LLC — Notice of Probable Violation

**Citation:** CPF 32023006NOPV  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2023-05-04

CLOSED notice of probable violation citing 195.579(a).

## Document text

Notice of Probable Violation involving COFFEYVILLE RESOURCES CRUDE TRANSPORTATION, LLC. PHMSA's enforcement data identifies the cited regulation as 195.579(a). The case was opened on 2023-05-04 and is reported as closed as of 2025-03-03. Proposed civil penalty: $804,300. Assessed civil penalty: $268,100. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32023006NOPV_Closure Letter_03032025_(22-235672).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023006NOPV/32023006NOPV_Closure%20Letter_03032025_(22-235672).pdf

32023006NOPV_Closure Letter_03032025_(22-235672)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023006NOPV/32023006NOPV_Closure%20Letter_03032025_(22-235672)_text.pdf

32023006NOPV_Consent Agreement and Order_01032024_(22-235672).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023006NOPV/32023006NOPV_Consent%20Agreement%20and%20Order_01032024_(22-235672).pdf

32023006NOPV_Consent Agreement and Order_01032024_(22-235672)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023006NOPV/32023006NOPV_Consent%20Agreement%20and%20Order_01032024_(22-235672)_text.pdf

32023006NOPV_Operator Response to Notice_06022023_(22-235672).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023006NOPV/32023006NOPV_Operator%20Response%20to%20Notice_06022023_(22-235672).pdf

32023006NOPV_PCP PCO_05042023_(22-235672).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023006NOPV/32023006NOPV_PCP%20PCO_05042023_(22-235672).pdf

32023006NOPV_PCP PCO_05042023_(22-235672)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023006NOPV/32023006NOPV_PCP%20PCO_05042023_(22-235672)_text.pdf

32023006NOPV_Consent Agreement and Order_01032024_(22-235672)_text.pdf

January 3, 2024
VIA ELECTRONIC MAIL TO: dllamp@cvrenergy.com
David Lamp
President and Chief Executive Officer
CVR Partners, LP
P.O. Box 3516
411 N.E. Washington Boulevard
Bartlesville, Oklahoma 74006
CPF No. 3-2023-006-NOPV
Dear Mr. Lamp:
Enclosed please find a Consent Order incorporating the terms of the Consent Agreement between
the Pipeline and Hazardous Materials Safety Administration (PHMSA) and Coffeyville Resources
Crude Transportation, LLC (CRCT), which was executed on December 27, 2023. Service of the
Consent Order and Consent Agreement by electronic mail is deemed effective upon the date of
transmission and acknowledgement of receipt, or as otherwise provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure: Consent Order and Consent Agreement
cc: Mr. Gregory A. Ochs, Director, Central Region, Office of Pipeline Safety, PHMSA
Mr. Keith Kuehn, Vice President, Crude Transportation, CRCT, kakuehn@cvrenergy.com
Mr. Blake Record, DOT Compliance Primary, CRCT, brecord@cvrenergy.com
Mr. Jeffrey Hunter, Outside Counsel for CRCT, jhunter@perkinscoie.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
COFFEYVILLE RESOURCES )
CRUDE TRANSPORTATION, LLC, ) CPF No. 3-2023-006-NOPV
)
Respondent. )
____________________________________)
CONSENT ORDER
By letter dated May 4, 2023, the Pipeline and Hazardous Materials Safety Administration
(PHMSA), Office of Pipeline Safety (OPS), issued a Notice of Probable Violation, Proposed
Civil Penalty, and Proposed Compliance Order (Notice) to Coffeyville Resources Crude
Transportation, LLC (CRCT or Respondent).
In response to the Notice, Respondent contested the allegation of violation contained in the
Notice but did not request a formal hearing on the matter. CRCT did ask for the opportunity to
meet informally with PHMSA to discuss the calculation of the civil penalty in the Notice.
Respondent and PHMSA (The Parties) subsequently met to discuss the issues raised in the
Response on August 30, 2023. Following the informal discussion, CRCT submitted
supplemental information in a response sent October 2, 2023. The supplemental response
asserted further argument for Respondent’s position that the proposed civil penalty should be
lowered. As a result of those discussions, as explained in more detail below, the Parties have
agreed to a Consent Agreement by which the civil penalty is assessed to be $268,100.
Accordingly, the Consent Agreement is hereby approved and incorporated by reference into this
Consent Order. CRCT is hereby ordered to comply with the terms of the Consent Agreement
pursuant to its terms. Pursuant to 49 U.S.C. § 60101, et seq., failure to comply with this Consent
Order may result in the assessment of civil penalties as set forth in 49 U.S.C. § 60122 and 49
C.F.R. § 190.223, or in referral to the Attorney General for appropriate relief in a district court of
the United States.
The terms and conditions of this Consent Order are effective upon service in accordance with
49 C.F.R. § 190.5.
January 3, 2024
________________________________ ______________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
COFFEYVILLE RESOURCES )
CRUDE TRANSPORTATION, LLC, ) CPF No. 3-2023-006-NOPV
)
)
)
Respondent. )
____________________________________)
CONSENT AGREEMENT
From February through August 2022, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter 601 of 49
United States Code (U.S.C.), investigated the February 10, 2022 reported release of
approximately 720 barrels of crude oil from an eight-inch Valley pipeline controlled by
Coffeyville Resources Crude Transportation, LLC (CRCT or Respondent) in Crowley County,
Kansas.
As a result of the investigation, the Director, Central Region, OPS (Director), issued to
Respondent, by letter dated May 4, 2023, a Notice of Probable Violation, Proposed Compliance
Order, and Proposed Civil Penalty (Notice). In accordance with 49 C.F.R. § 190.207, the Notice
proposed finding that CRCT committed violations of one provision of 49 C.F.R. Part 195 (Item
1), proposed ordering Respondent to take certain measures to correct the alleged violation, and
proposed a civil penalty of $804,300.
CRCT responded to the Notice by letter dated June 2, 2023 (Response). Respondent contested
the allegation of violation contained in the Notice but did not request a hearing on the matter.
CRCT requested an informal meeting with PHMSA to discuss the calculation of the civil penalty
proposed in the Notice.
PHMSA and Respondent (the Parties) subsequently met on August 30, 2023, to discuss the
issues raised in the Response. As a result of those discussions and as explained in more detail
below, the Parties have agreed to a Consent Agreement by which PHMSA makes a finding of
violation, assesses a reduced civil penalty of $268,100, and orders certain corrective action be
completed.
Having agreed that settlement of this proceeding will avoid further administrative proceedings or
litigation and will serve the public interest by promoting safety and protection of the



environment, pursuant to 49 U.S.C. § 60101, et seq. and 49 C.F.R. Part 190, and upon consent
and agreement, the Parties hereby agree as follows:
I. General Provisions
1. Respondent acknowledges that as the operator of the pipeline facilities subject to
the Notice, Respondent and its referenced pipeline facilities are subject to the jurisdiction of the
Federal pipeline safety laws, 49 U.S.C. § 60101, et seq., and the regulations and administrative
orders issued thereunder. For purposes of this Consent Agreement (Agreement), Respondent
acknowledges that it received proper notice of PHMSA’s action in this proceeding and that the
Notice states claims upon which relief may be granted pursuant to 49 U.S.C. § 60101, et seq.,
and the regulations and orders issued thereunder.
2. After Respondent returns this signed Agreement to PHMSA, the Agency’s
representative will present it to the Associate Administrator for Pipeline Safety, recommending
that the Associate Administrator adopt the terms of this Agreement by issuing an administrative
order (Consent Order) incorporating the terms of this Agreement. The terms of this Agreement
constitute an offer of settlement until accepted by the Associate Administrator. Once accepted, the
Associate Administrator will issue a Consent Order incorporating the terms of this Agreement.
3. Respondent consents to the issuance of the Consent Order, and hereby waives any
further procedural requirements with respect to its issuance. Respondent waives all rights to
contest the adequacy of notice, or the validity of the Consent Order or this Agreement, including
all rights to administrative or judicial hearings or appeals, except for the Dispute Resolution
provisions set forth herein.
4. This Agreement shall apply to and be binding upon PHMSA and Respondent, its
officers, directors, and employees, and its successors, assigns, or other entities or persons
otherwise bound by law. Respondent agrees to provide a copy of this Agreement and any
incorporated work plans and schedules to all of Respondent’s officers, employees, and agents
whose duties might reasonably include compliance with this Agreement.
5. This Agreement constitutes the final, complete and exclusive agreement and
understanding between the Parties with respect to the settlement embodied in this Agreement.
The Parties acknowledge that there are no representations, agreements or understandings relating
to settlement other than those expressly contained in this Agreement, except that the terms of this
Agreement may be construed by reference to the Notice.
6. Nothing in this Agreement affects or relieves Respondent of its responsibility to
comply with all applicable requirements of the Federal pipeline safety laws, 49 U.S.C. § 60101,
et seq., and the regulations and orders issued thereunder. Nothing in this Agreement alters
PHMSA's right of access, entry, inspection, and information gathering or PHMSA's authority to
bring enforcement actions against Respondent pursuant to the Federal pipeline safety laws, the
regulations and orders issued thereunder, or any other provision of Federal or State law.



7. For all transfers of ownership or operating responsibility of Respondent’s pipeline
system referenced herein, Respondent will provide a copy of this Agreement to the prospective
transferee at least 30 days prior to such transfer. Respondent will provide written notice of the
transfer to the Director no later than 60 days after the transfer occurs.
8. This Agreement does not waive or modify any Federal, State, or local laws or
regulations that are applicable to Respondent’s pipeline systems. This Agreement is not a permit,
or a modification of any permit, under any Federal, State, or local laws or regulations.
Respondent remains responsible for achieving and maintaining compliance with all applicable
Federal, State, and local laws, regulations and permits.
9. This Agreement does not create rights in, or grant any cause of action to, any third
party not party to this Agreement. The U.S. Department of Transportation is not liable for any
injuries or damages to persons or property arising from acts or omissions of Respondent or its
officers, employees, or agents carrying out the work required by this Agreement. Respondent
agrees to hold harmless the U.S. Department of Transportation, its officers, employees, agents,
and representatives from any and all causes of action arising from any acts or omissions of
Respondent or its contractors in carrying out any work required by this Agreement.
10. Except as set forth herein, this Agreement does not constitute a finding of
violation of any other federal law or regulation and may not be used in any civil proceeding of
any kind as evidence or proof of any fact, fault or liability, or as evidence of a violation of any
law, rule, regulation, or requirement, except in a proceeding to enforce the provisions of this
Agreement or in future PHMSA enforcement actions.
11. Agreement.
Respondent neither admits nor denies any allegation or conclusion in the Notice
or this Agreement but agrees for purposes of this Agreement to comply with the terms of this
II. Finding of Violation:
12. Item 1- 49 C.F.R. § 195.579: The Notice alleged Respondent failed to investigate
the corrosive effect of the hazardous liquid on its pipeline or take adequate steps to mitigate
internal corrosion. Specifically, the Notice alleged that during the investigation of the February
10, 2022, reported release, PHMSA found that the leak originated from a dead leg segment of
pipe that had not been included in the Valley pipeline threat matrix due to ineffective CRCT
internal communications. Respondent contested the allegation in the Notice. Upon further
discussions between the Parties, without admitting or denying the allegation of violation for this
item, Respondent agrees to accept the finding of the violation for purposes of settlement.
13. Item 1 will be considered by PHMSA as a prior offense in any future PHMSA
enforcement action taken against Respondent for the five (5)-year period following the Effective
Date of this Agreement.



III. Civil Penalty:
14. Item 1: The Notice proposed assessing a civil penalty in the amount of $804,300
for Item 1. Respondent requested a reduction of the proposed civil penalty, and, with its
responses, provided new information and evidence to support its request. After consideration of
the new information and evidence provided by Respondent, PHMSA agrees to a reduced civil
penalty. Specifically, Respondent provided evidence in the form of a report from the Kansas
Department of Health and Environment indicating there was little or no known environmental
harm from the release. Consequently, a reduction of the civil penalty calculation multiplier
reflecting the limited impact of the release is appropriate, which results in a civil penalty of
$268,100. Respondent agrees to pay a reduced civil penalty in the amount of $268,100 for the
violation in Item 1.
15. Respondent shall pay a total civil penalty in the amount of $268,100, pursuant to
the payment instructions at 49 C.F.R. § 190.227(a), to be paid in full no later than 20 days from
the Effective Date of this Agreement.
IV. Compliance Order:
16. Item 1: The Notice proposed certain compliance order actions to address the non-
compliance alleged in the Notice. Respondent did not contest the Proposed Compliance Order.
As such, Respondent agrees to perform the following corrective measures:
A. In regard to Item 1 of the Notice pertaining to CRCT’s failure to monitor and
mitigate internal corrosion, CRCT must, within 90 days of the Final Order,
provide an updated internal corrosion monitoring procedure that includes a
process to periodically survey its pipeline segments for dead leg segments.
V. Enforcement:
17. This Agreement is subject to all enforcement authorities available to PHMSA
under 49 U.S.C. § 60101, et seq., and 49 C.F.R. Part 190, including administrative civil penalties
under 49 U.S.C. § 60122, of up to $257,664 per violation for each day the violation continues and
referral of the case to the Attorney General for judicial enforcement, if PHMSA determines that
Respondent is not complying with the terms of this Agreement in accordance with the
determinations made by the Director, or in accordance with decisions of the Associate
Administrator if resolved pursuant to the Dispute Resolution process herein. The maximum civil
penalty amounts are adjusted annually for inflation. See 49 C.F.R. § 190.223. All work plans and
associated schedules set forth or referenced in Section IV are automatically incorporated into this
Agreement and are enforceable in the same manner.
VI. Review and Approval Process:
18. With respect to any submission under Section IV (Compliance Order) of this
Agreement that requires the approval of the Director, the Director may: (a) approve, in whole or
in part, the submission; (b) approve the submission on specified, reasonable conditions; (c)
disapprove, in whole or in part, the submission; or (d) any combination of the foregoing. If the



Director approves, approves in part, or approves with conditions, Respondent will take all
actions as approved by the Director, subject to Respondent’s right to invoke the dispute
resolution procedures with respect to any conditions the Director identifies. If the Director
disapproves all or any portion of the submission, the Director will provide Respondent a written
notice of the deficiencies. Respondent will correct all deficiencies within the time specified by
the Director and resubmit it for approval.
VII. Dispute Resolution:
19. The Director and Respondent will informally attempt to resolve any disputes
arising under this Agreement, including any decision of the Director under the terms of Section
IV, Compliance Order. If Respondent and the Director are unable to informally resolve the
dispute within 15 calendar days after the dispute is first raised, in writing, to the Director,
Respondent may submit a written request for a determination resolving the dispute from the
Associate Administrator for Pipeline Safety, PHMSA. Such request must be made in writing and
provided to the Director, counsel for the Central Region, and to the Associate Administrator for
Pipeline Safety, no later than 10 calendar days from the 15-day deadline for informal resolution
referenced in this paragraph. Along with its request, Respondent must provide the Associate
Administrator with all information Respondent believes is relevant to the dispute. Decisions of
the Associate Administrator under this paragraph will constitute final agency action. The
existence of a dispute and PHMSA’s consideration of matters placed in dispute will not excuse,
toll, or suspend any term or timeframe for completion of any work to be performed under this
Agreement during the pendency of the dispute resolution process.
VIII. Effective Date:
20. The term “Effective Date,” as used herein, is the date on which the Consent Order
is issued by the Associate Administrator, PHMSA, incorporating the terms of this Agreement.
IX. Recordkeeping and Information Disclosure:
21. Unless otherwise required in this Agreement, Respondent agrees to maintain
records demonstrating compliance with all requirements of this Agreement for a period of at
least five (5) years following completion of all work to be performed. For any reports, plans, or
other deliverables required to be submitted to PHMSA pursuant to this Agreement, Respondent
may assert a claim of business confidentiality or other protections applicable to the release of
information by PHMSA, covering part or all of the information required to be submitted to
PHMSA pursuant to this Agreement in accordance with 49 C.F.R. Part 7. Respondent must mark
the claim of confidentiality in writing on each page and include a statement specifying the
grounds for each claim of confidentially. PHMSA determines release of any information
submitted pursuant to this Agreement in accordance with 49 C.F.R. Part 7, the Freedom of
Information Act, 5 U.S.C. § 552, DOT and PHMSA policies, and other applicable regulations
and Executive Orders.



X. Modification:
22. The terms of this Agreement may be modified by mutual agreement of the Parties.
Such modifications must be in writing and signed by both parties.
XI. Termination:
23. This Agreement will remain in effect until the Compliance Order in Section IV
and the Civil Penalty in Section III are satisfied, as determined by the Director. The Agreement
shall not terminate until the Director confirms, in writing, that the Agreement is terminated in
accordance with this paragraph. Nothing in this Agreement prevents Respondent from
completing any of the obligations earlier than the deadlines provided for in this Agreement.
XII. Ratification:
24. The Parties’ undersigned representatives certify that they are fully authorized to
enter into the terms and conditions of this Agreement and to execute and legally bind such party
to this document.
25. The Parties hereby agree to all findings, conditions, and terms of this Agreement.
[Signature Lines on Following Page]



For Coffeyville Resources Crude Transportation, LLC:
___________________________________
Keith Kuehn, Vice President Pipelines, Coffeyville Resources Crude Transportation, LLC
________________________
Date:
For PHMSA:
________________________________________
Director, Central Region, Office of Pipeline Safety
________________________
Date:

32023006NOPV_Closure Letter_03032025_(22-235672)_text.pdf

VIA ELECTRONIC MAIL TO: dgsloan@CVREnergy.com; brecord@cvrenergy.com;
brandon@enservsolutions.com
March 3, 2025
Mr. Don Sloan – VP, Crude Transportation Pipeline
Coffeyville Resources Crude Transportation, LLC
P.O. Box 3516
411 N.E. Washington Boulevard
Bartlesville, Oklahoma 74006
RE: CPF 3-2023-006-NOPV
Dear Mr. Sloan:
On January 3, 2024, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Coffeyville Resources Crude Transportation, LLC (Coffeyville) a Consent Order,
incorporating the terms of the Consent Agreement in the above-referenced case. The Consent
Agreement included a Compliance Order and Civil Penalty assessment. Based on our review of
the documentation provided, and confirmation of payment of the civil penalty, it has been
determined that Coffeyville has complied with the terms of the Consent Agreement and Order.
Accordingly, this case is now closed, and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Gregory A. Ochs
Director, Central Region, Office of Pipeline Safety
cc: Blake Record, Safety and DOT Compliance, brecord@cvrenergy.com
Brandon Clemons, Compliance Manager, brandon@enservsolutions.com

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/32023006NOPV>
- Source ID: `phmsa-enforcement`
- SHA-256: `5ab8c1679bbcfdf0283b3b9216833487d9534be7ee4184ae15f791980a3ffd4c`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-25T16:17:45.187Z
- Document slug: `phmsa-enforcement-32023006nopv`

### Source metadata

```json
{
  "cpf": "32023006NOPV",
  "operator": "COFFEYVILLE RESOURCES CRUDE TRANSPORTATION, LLC",
  "region": "Central",
  "pipelineType": "INTERSTATE LIQUID",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.579(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 7,
  "attachments": [
    {
      "name": "32023006NOPV_Closure Letter_03032025_(22-235672).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32023006NOPV/32023006NOPV_Closure%20Letter_03032025_(22-235672).pdf",
      "bytes": 241159,
      "category": "agency_document"
    },
    {
      "name": "32023006NOPV_Closure Letter_03032025_(22-235672)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32023006NOPV/32023006NOPV_Closure%20Letter_03032025_(22-235672)_text.pdf",
      "bytes": 107635,
      "category": "agency_document"
    },
    {
      "name": "32023006NOPV_Consent Agreement and Order_01032024_(22-235672).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32023006NOPV/32023006NOPV_Consent%20Agreement%20and%20Order_01032024_(22-235672).pdf",
      "bytes": 566467,
      "category": "agency_document"
    },
    {
      "name": "32023006NOPV_Consent Agreement and Order_01032024_(22-235672)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32023006NOPV/32023006NOPV_Consent%20Agreement%20and%20Order_01032024_(22-235672)_text.pdf",
      "bytes": 201434,
      "category": "agency_document"
    },
    {
      "name": "32023006NOPV_Operator Response to Notice_06022023_(22-235672).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32023006NOPV/32023006NOPV_Operator%20Response%20to%20Notice_06022023_(22-235672).pdf",
      "bytes": 147438,
      "category": "party_submission"
    },
    {
      "name": "32023006NOPV_PCP PCO_05042023_(22-235672).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32023006NOPV/32023006NOPV_PCP%20PCO_05042023_(22-235672).pdf",
      "bytes": 310572,
      "category": "case_document"
    },
    {
      "name": "32023006NOPV_PCP PCO_05042023_(22-235672)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32023006NOPV/32023006NOPV_PCP%20PCO_05042023_(22-235672)_text.pdf",
      "bytes": 124520,
      "category": "case_document"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "COFFEYVILLE RESOURCES CRUDE TRANSPORTATION, LLC"
}
```