Notice of Probable Violation involving BOARDWALK PETROCHEMICAL PIPELINE, LLC. PHMSA's enforcement data identifies the cited regulations as 195.444(b),  195.446(c)(1),  195.446(c)(2),  195.446(c)(3),  195.446(e),  195.446(h)(1),  195.446(h)(3). The case was opened on 2023-07-27 and is reported as closed as of 2024-11-20. Proposed civil penalty: $16,700. Assessed civil penalty: $16,700. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32023014NOPV_Closure Letter_11202024_(22-250434).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023014NOPV/32023014NOPV_Closure%20Letter_11202024_(22-250434).pdf

32023014NOPV_Closure Letter_11202024_(22-250434)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023014NOPV/32023014NOPV_Closure%20Letter_11202024_(22-250434)_text.pdf

32023014NOPV_Final Order_11092023_(22-250434).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023014NOPV/32023014NOPV_Final%20Order_11092023_(22-250434).pdf

32023014NOPV_Final Order_11092023_(22-250434)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023014NOPV/32023014NOPV_Final%20Order_11092023_(22-250434)_text.pdf

32023014NOPV_Operator Response to Notice_08242023_(22-250434).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023014NOPV/32023014NOPV_Operator%20Response%20to%20Notice_08242023_(22-250434).pdf

32023014NOPV_PCP PCO_07272023_(22-250434).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023014NOPV/32023014NOPV_PCP%20PCO_07272023_(22-250434).pdf

32023014NOPV_PCP PCO_07272023_(22-250434)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023014NOPV/32023014NOPV_PCP%20PCO_07272023_(22-250434)_text.pdf

32023014NOPV_Closure Letter_11202024_(22-250434)_text.pdf

VIA ELECTRONIC MAIL TO: Scott.Hallam@bwpipelines.com; tina.baker@bwpipelines.com
November 20, 2024
Mr. Scott Hallam
President and CEO
Boardwalk Petrochemical Pipeline, LLC
9 Greenway Plaza Suite 2800
Houston, TX 77036
RE: CPF 3-2023-014-NOPV
Dear Mr. Hallam:
On November 9, 2023, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Boardwalk Petrochemical Pipeline, LLC (Boardwalk) a Final Order in the above-
referenced case. This Order included a Compliance Order and Civil Penalty assessment. Based
on our review of the documentation provided by your staff and confirmation of payment of the
civil penalty, it has been determined that Boardwalk has complied with the terms of the Final
Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Gregory A. Ochs
Director, Central Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Tina Baker, Manager, Compliance Services, Boardwalk Petrochemical Pipeline, LLC
(tina.baker@bwpipelines.com)

32023014NOPV_Final Order_11092023_(22-250434)_text.pdf

November 9, 2023
VIA ELECTRONIC MAIL TO: stan.horton@bwpipelines.com
Stanley Horton
President and Chief Executive Officer
Boardwalk Pipelines, LP
9 Greenway Plaza Suite 2800
Houston, Texas 77046
Re: CPF No. 3-2023-014-NOPV
Dear Mr. Horton:
Enclosed please find the Final Order issued in the above-referenced case. It withdraws one of the
allegations of violation, makes findings of violation, assesses a civil penalty of $16,700, and specifies
actions that need to be taken by Boardwalk Petrochemical Pipeline, LLC, a subsidiary of Boardwalk
Pipelines, LP, to comply with the pipeline safety regulations. The penalty payment terms are set
forth in the Final Order. When the civil penalty has been paid and the terms of the compliance order
completed, as determined by the Director, Central Region, this enforcement action will be closed.
Service of the Final Order by e-mail is effective upon the date of transmission and acknowledgement
of receipt as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Gregory A. Ochs, Director, Central Region, Office of Pipeline Safety, PHMSA
Ms. Tina Baker, Manager, Compliance Service, Boardwalk Petrochemical Pipeline, LLC,
tina.baker@bwpipelines.com
Mr. Tony Rizk, Vice President, Technical Services, Boardwalk Petrochemical Pipeline, LLC,
tony.rizk@bwpipelines.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
______________________________________
In the Matter of )
Boardwalk Petrochemical Pipeline, LLC, ) CPF No. 3-2023-014-NOPV
a subsidiary of Boardwalk Pipelines, LP, )
)
)
)
Respondent. )
______________________________________)
FINAL ORDER
From September 19 to September 23, 2022, pursuant to 49 U.S.C. § 60117, a representative of
the Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety
(OPS), conducted an on-site pipeline safety inspection of the facilities and records of Boardwalk
Petrochemical Pipeline, LLC (Boardwalk or Respondent) in Sulphur Springs, Louisiana.
Boardwalk operates a control center which supports around 380 miles of hazardous liquid
pipelines and eight miles of gas transmission pipelines.
As a result of the inspection, the Director, Central Region, OPS (Director), issued to Respondent,
by letter dated July 27, 2023, a Notice of Probable Violation, Proposed Civil Penalty, and
Proposed Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the Notice
proposed finding that Boardwalk had committed seven violations of 49 C.F.R. Part 195 and
proposed assessing a civil penalty of $16,700 for the alleged violations. The Notice also
proposed ordering Respondent to take certain measures to correct the alleged violations.
Boardwalk responded to the Notice by letter dated August 24, 2023 (Response). Boardwalk
contested one of the allegations and offered additional information. Respondent did not request
a hearing and therefore has waived its right to one.
FINDINGS OF VIOLATION
The Notice alleged that Respondent violated 49 C.F.R. Part 195, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.444(b), which states:
§ 195.444 Leak detection.
(a) . . . .



(b) General. A pipeline must have an effective system for detecting
leaks in accordance with §§ 195.134 or 195.452, as appropriate. An
operator must evaluate the capability of its leak detection system to protect
the public, property, and the environment and modify it as necessary to do
so. At a minimum, an operator’s evaluation must consider the following
factors—length and size of the pipeline, type of product carried, the
swiftness of leak detection, location of nearest response personnel, and leak
history.
The Notice alleged that Respondent violated 49 C.F.R. § 195.444(b) by failing to evaluate the
capability of its leak detection system to protect the public, property, and the environment and
modify it as necessary to do so. Specifically, the Notice alleged that Boardwalk failed to
consider length and size of the pipeline, type of product carried, the swiftness of leak detection,
location of nearest response personnel, leak history, and risk assessment results in its procedure.
In addition, the Notice alleged Boardwalk did not have procedures requiring evaluation and
benchmarking if assets are added or removed and did not establish a frequency for the leak
detection capability evaluation.
In its Response, Boardwalk did not contest this allegation of violation. Having reviewed the
record, however, I note that under 195.134, a pipeline constructed prior to October 1, 2019, does
not have to comply with 195.444 until October 1, 2024. Respondent’s exhibits1 indicate that its
pipeline was constructed prior to October 1, 2019. Therefore, the pipeline was not required to be
in compliance with 195.444 at the time of the inspection. Based upon the foregoing, I hereby
order that Item 1 be withdrawn.
Item 2: The Notice alleged that Respondent violated 49 C.F.R. § 195.446(c)(1), which states:
§ 195.446 Control room management.
(a) . . . .
(c) Provide adequate information. Each operator must provide its
controllers with the information, tools, processes and procedures necessary
for the controllers to carry out the roles and responsibilities the operator has
defined by performing each of the following:
(1) Implement API RP 1165 (incorporated by reference, see § 195.3)
whenever a SCADA system is added, expanded or replaced, unless the
operator demonstrates that certain provisions of API RP 1165 are not
practical for the SCADA system used;
The Notice alleged that Respondent violated 49 C.F.R. § 195.446(c)(1) by failing to provide a
record that demonstrated it had implemented API RP 1165 whenever a supervisory control and
data acquisition (SCADA) system was added, expanded, or replaced. Specifically, the Notice
alleged that Boardwalk failed to provide records demonstrating it had reviewed its screens and
system functions in accordance with API RP 1165.
1 See Respondent Exhibit 1A (1/19/2018), Exhibit 4B (5/11/2019).



In its Response, Boardwalk did not contest this allegation of violation. Accordingly, after
considering all of the evidence, I find that Respondent violated 49 C.F.R. § 195.446(c)(1) by
failing to provide a record that demonstrated it had implemented API RP 1165 whenever a
SCADA system was added, expanded, or replaced.
Item 3: The Notice alleged that Respondent violated 49 C.F.R. § 195.446(c)(2), which states:
§ 195.446 Control room management.
(a) . . . .
(c) Provide adequate information. Each operator must provide its
controllers with the information, tools, processes and procedures necessary
for the controllers to carry out the roles and responsibilities the operator has
defined by performing each of the following:
(1) . . . .
(2) Conduct a point-to-point verification between SCADA displays and
related field equipment when field equipment is added or moved and when
other changes that affect pipeline safety are made to field equipment or
SCADA displays;
The Notice alleged that Respondent violated 49 C.F.R. § 195.446(c)(2) by failing to conduct a
point-to-point verification between SCADA displays and related field equipment when field
equipment is added or moved and when other changes that affect pipeline safety are made to
field equipment of SCADA displays. Specifically, the Notice alleged that Boardwalk failed to
conduct a point-to-point verification when it implemented a new SCADA system at the Sulphur
Springs Control Room. Second, the Notice alleged that Respondent violated 49 C.F.R.
§ 195.446(c)(2) by failing to include a requirement in its procedures to verify the accuracy of
values, alarm graphics, and messaging on all SCADA screens when conducting a point-to-point
verification.
In its Response, Boardwalk contested this allegation of violation, in part, and submitted
documentation showing that a point-to-point had been completed. Boardwalk did not contest the
second allegation that it failed to include a requirement in its procedures to verify the accuracy of
all SCADA screens when conducting a point-to-point.
In a recommendation for final action submitted pursuant to § 190.209(b)(7), the Director
recommended withdrawing the violation of § 195.446(c)(2), in part, after consideration of the
additional documentation submitted related to the alleged failure to conduct a point-to-point
verification. Based upon the foregoing, I hereby order that Item 3 be withdrawn, in part, because
Boardwalk submitted documentation showing that a point-to-point had been completed.
Having considered the evidence associated with the second allegation, which Respondent did not
contest, I find that Respondent violated 49 C.F.R. § 195.446(c)(2) by failing to include a
requirement in its procedures to verify the accuracy of values, alarm graphics, and messaging on
all SCADA screens when conducting a point-to-point verification.
Item 4: The Notice alleged that Respondent violated 49 C.F.R. § 195.446(c)(3), which states:



§ 195.446 Control room management.
(a) . . . .
(c) Provide adequate information. Each operator must provide its
controllers with the information, tools, processes and procedures necessary
for the controllers to carry out the roles and responsibilities the operator has
defined by performing each of the following:
(1) . . . .
(3) Test and verify an internal communication plan to provide adequate
means for manual operation of the pipeline safely, at least once each
calendar year, but at intervals not to exceed 15 months;
The Notice alleged that Respondent violated 49 C.F.R. § 195.446(c)(3) by failing to test and
verify an internal communication plan to provide adequate means for manual operation of the
pipeline safety, at least once each calendar year, but at intervals not to exceed 15 months.
Specifically, the Notice alleged that Boardwalk failed to complete a test of the internal
communication system for safe manual operation of the pipeline in calendar year 2020 and could
not provide records documenting a test claimed to be performed on May 11, 2019.
In its Response, Boardwalk did not contest this allegation of violation. Accordingly, after
considering all of the evidence, I find that Respondent violated 49 C.F.R. § 195.446(c)(3) by
failing to test and verify an internal communication plan to provide adequate means for manual
operation of the pipeline safety, at least once each calendar year, but at intervals not to exceed 15
months.
Item 5: The Notice alleged that Respondent violated 49 C.F.R. § 195.446(e), which states:
§ 195.446 Control room management.
(a) . . . .
(e) Alarm management. Each operator using a SCADA system must
have a written alarm management plan to provide for effective controller
response to alarms. An operator’s plan must include provisions to:
The Notice alleged that Respondent violated 49 C.F.R. § 195.446(e) by failing to have a written
alarm management plan to provide for effective controller response to alarms. Specifically, the
Notice alleged that Boardwalk’s plan did not have consistency in alarm management because it,
in part, relied on field personnel to determine what was monitored and the appropriate response
level.
In its Response, Boardwalk did not contest this allegation of violation. Accordingly, after
considering all of the evidence, I find that Respondent violated 49 C.F.R. § 195.446(e) by failing
to have a written alarm management plan to provide for effective controller response to alarms.
Item 6: The Notice alleged that Respondent violated 49 C.F.R. § 195.446(h)(1), which states:
§ 195.446 Control room management.
(a) . . . .



(h) Training. Each operator must establish a controller training
program and review the training program content to identify potential
improvements at least once each calendar year, but at intervals not to exceed
15 months. An operator’s program must provide for training each controller
to carry out the roles and responsibilities defined by the operator. In
addition, the training program must include the following elements:
(1) Responding to abnormal operating conditions likely to occur
simultaneously or in sequence;
The Notice alleged that Respondent violated 49 C.F.R. § 195.446(h)(1) by failing to include
responding to abnormal operating conditions likely to occur simultaneously or in sequence in its
controller training program. Specifically, the Notice alleged that Boardwalk failed to provide a
list or examples of abnormal operating conditions that could occur simultaneously or in sequence
that was used for training.
In its Response, Boardwalk did not contest this allegation of violation. Accordingly, after
considering all of the evidence, I find that Respondent violated 49 C.F.R. § 195.446(h)(1) by
failing to include responding to abnormal operating conditions likely to occur simultaneously or
in sequence in its controller training program.
Item 7: The Notice alleged that Respondent violated 49 C.F.R. § 195.446(h)(3), which states:
§ 195.446 Control room management.
(a) . . . .
(h) Training. Each operator must establish a controller training
program and review the training program content to identify potential
improvements at least once each calendar year, but at intervals not to exceed
15 months. An operator’s program must provide for training each controller
to carry out the roles and responsibilities defined by the operator. In
addition, the training program must include the following elements:
(1) . . . .
(3) Training controllers on their responsibilities for communication
under the operator’s emergency response procedures;
The Notice alleged that Respondent violated 49 C.F.R. § 195.446(h)(3) by failing to train
controllers on their responsibilities for communication under the operator’s emergency response
procedures. Specifically, the Notice alleged that Boardwalk failed to establish training for how
the leak detection system works and supports alarming to SCADA. The Notice further alleged
that Boardwalk did not provide directions or steps for a controller to take if a possible leak is
identified in Appendix 8 of the CRM Training Program. The Notice also stated Boardwalk
failed to provide controller training records related to leak detection.
In its Response, Boardwalk did not contest this allegation of violation. Accordingly, after
considering all of the evidence, I find that Respondent violated 49 C.F.R. § 195.446(h)(3) by
failing to train controllers on their responsibilities for communication under the operator’s
emergency response procedures.



These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$200,000 per violation for each day of the violation, up to a maximum of $2,000,000 for any
related series of violations.2
In determining the amount of a civil penalty under 49 U.S.C. § 60122 and 49 C.F.R. § 190.225, I
must consider the following criteria: the nature, circumstances, and gravity of the violation,
including adverse impact on the environment; the degree of Respondent’s culpability; the history
of Respondent’s prior offenses; any effect that the penalty may have on its ability to continue
doing business; the good faith of Respondent in attempting to comply with the pipeline safety
regulations; and self-disclosure or actions to correct a violation prior to discovery by PHMSA.
In addition, I may consider the economic benefit gained from the violation without any reduction
because of subsequent damages, and such other matters as justice may require. The Notice
proposed a total civil penalty of $16,700 for the violations cited above.
Item 4: The Notice proposed a civil penalty of $16,700 for Respondent’s violation of 49 C.F.R.
§ 195.446(c)(3) for failing to test and verify an internal communication plan to provide adequate
means for manual operation of the pipeline safety, at least once each calendar year, but at
intervals not to exceed 15 months. Boardwalk neither contested the allegation nor presented any
evidence or argument justifying elimination of the proposed penalty. Accordingly, having
reviewed the record and considered the assessment criteria, I assess Respondent a civil penalty of
$16,700 for violation of 49 C.F.R. § 195.446(c)(3).
Payment of the civil penalty must be made within 20 days after receipt of this Final Order.
Federal regulations (49 C.F.R. § 89.21(b)(3)) require such payment to be made by wire transfer
through the Federal Reserve Communications System (Fedwire), to the account of the U.S.
Treasury. Detailed instructions are contained in the enclosure. Questions concerning wire
transfers should be directed to: Financial Operations Division (AMK-325), Federal Aviation
Administration, Mike Monroney Aeronautical Center, 6500 S MacArthur Blvd, Oklahoma City,
Oklahoma 79169. The Financial Operations Division telephone number is (405) 954-8845.
Failure to pay the civil penalty will result in accrual of interest at the current annual rate in
accordance with 31 U.S.C. § 3717, 31 C.F.R. § 901.9 and 49 C.F.R. § 89.23. Pursuant to those
same authorities, a late penalty charge of six percent (6%) per annum will be charged if payment
is not made within 110 days of service. Furthermore, failure to pay the civil penalty may result
in referral of the matter to the Attorney General for appropriate action in a district court of the
United States.
COMPLIANCE ORDER
2 These amounts are adjusted annually for inflation. See 49 C.F.R. § 190.223 for adjusted amounts.



The Notice proposed a compliance order with respect to Items 1, 2, 3, 5, 6, and 7 in the Notice
for violations of 49 C.F.R. §§ 195.444(b), 195.446(c)(1), 195.446(c)(2), 195.446(e),
195.446(h)(1), and 195.446(h)(3), respectively. Under 49 U.S.C. § 60118(a), each person who
engages in the transportation of hazardous liquids or who owns or operates a pipeline facility is
required to comply with the applicable safety standards established under chapter 601. As
discussed above, Item 1 has been withdrawn. Therefore, the compliance terms proposed in the
Notice for that Item are not included in this Order. The Director has indicated that Respondent
has taken the following actions to address some of the cited violations:
With regard to the violation of § 195.446(c)(1) (Item 2), Respondent stated that it will conduct a
full audit of its SCADA screens and Style Guide against API RP 1165 and submit to PHMSA
within 90 days of receipt of the Final Order. Accordingly, the terms of the proposed compliance
order for Item 2 are included.
With respect to the violation of § 195.446(c)(2) (Item 3), as discussed above, Item 3 has been
withdrawn, in part. Therefore, the compliance terms proposed in the Notice for that Item are
revised to remove the terms associated with completing point-to-point of the AVEVA Sulphur
Springs SCADA system. The terms of the proposed compliance order for Item 3 associated with
modifying procedures are included.
With respect to the violation of § 195.446(e) (Item 5), Respondent stated it revised its procedures
in MOC 2022-11-01 to document its established process for alarm rationalization. Having
reviewed the revised procedures, further corrective action is required. The procedure did not
detail the process of how Boardwalk is going to rationalize alarms. Accordingly, the terms of the
proposed compliance order for Item 5 are included.
With regard to the violation of § 195.446(h)(1) (Item 6), Respondent stated that it implemented
its Liquids Control Trainer in late 2022. The syllabus for each scenario included a list of
abnormal operating conditions likely to occur simultaneously or in sequence. Records were
attached to the Response. Boardwalk further stated training with the Liquids Control Trainer
will be completed once each calendar year, not to exceed 15 months, by each Controller and
Control Room Management. Boardwalk also requested clarification of the proposed compliance
order, as the last sentence for Item 6, requiring utilization of the amended process to rationalize
all alarms, repeated the requirement of Item 5, which also required alarm rationalization. I find
Respondent provided adequate records of abnormal operations that could occur simultaneously
or in sequence to support the training requirement. In addition, I agree the last sentence for Item
6 was a typographical error. Accordingly, after considering all of the evidence, I find that
Respondent satisfied all compliance order requirements for Item 6. Therefore, it is not necessary
to include the terms below.
With respect to the violation of § 195.446(h)(3) (Item 7), Respondent stated that the training
requirement is satisfied using Scenario #4 of the Liquids Control Trainer. Having reviewed the
revised procedures, further corrective action is required. Respondent must develop a training
plan that includes all the topics covered in training controllers on leak detection, including how



the leak detection system works along with other SCADA indications related to identifying
leaks, and controllers’ response to these presentations. The documentation provided by
Respondent did not include this information. Accordingly, the terms of the proposed compliance
order for Item 7 are included below.
For the above reasons, the Compliance Order is modified as set forth below.
Pursuant to the authority of 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is
ordered to take the following actions to ensure compliance with the pipeline safety regulations
applicable to its operations:
1. With respect to the violation of § 195.446(c)(1) (Item 2), Respondent must conduct an
audit of its SCADA screens and style guide against API RP 1165 to identify compliance
and deficiencies and correct those deficiencies, or demonstrate that certain provisions of
API RP 1165 are not practical for the SCADA system used, within 90 days of receipt of
the Final Order.
2. With respect to the violation of § 195.446(c)(2) (Item 3), Respondent must modify the
point-to-point procedure to include verification of all screens, verify all point values and
status match, and verify the appropriate alarm conditions present such as “on/off,”
“open/closed,” “local/remote,” in alarm with the correct priority, etc., within 120 days of
receipt of the Final Order.
3. With respect to the violation of § 195.446(e) (Item 5), Respondent must develop an
alarm rationalization process that supports a consistent method for determination of alarm
priorities and set points to provide effective controller response to alarms, and utilize that
process to rationalize all alarms within 120 days of receipt of the Final Order.
4. With respect to the violation of § 195.446(h)(3) (Item 7), Respondent must develop
training content to describe how the AVEVA system works to calculate the benchmark,
how the value is alarmed to SCADA, and how the controller must respond should the
alarm present, and train controllers on this content within 60 days of receipt of the Final
Order.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent and demonstrating good cause for an
extension.
PHMSA requests that Respondent maintain documentation of the safety improvement costs
associated with fulfilling this Compliance Order and submit the total to the Director. It is
requested that these costs be reported in two categories: (1) total cost associated with
preparation/revision of plans, procedures, studies and analyses; and (2) total cost associated with
replacements, additions and other changes to pipeline infrastructure.
Failure to comply with this Order may result in the administrative assessment of civil penalties



not to exceed $200,000, as adjusted for inflation (see 49 C.F.R. § 190.223), for each violation for
each day the violation continues or in referral to the Attorney General for appropriate relief in a
district court of the United States.
Under 49 C.F.R. § 190.243, Respondent may submit a Petition for Reconsideration of this Final
Order to the Associate Administrator, Office of Pipeline Safety, PHMSA, 1200 New Jersey
Avenue, SE, East Building, 2nd Floor, Washington, DC 20590, with a copy sent to the Office of
Chief Counsel, PHMSA, at the same address. The written petition must be received no later than
20 days after receipt of the Final Order by Respondent. Any petition submitted must contain a
statement of the issue(s) and meet all other requirements of 49 C.F.R. § 190.243. The filing of a
petition automatically stays the payment of any civil penalty assessed. The other terms of the
order, including corrective action, remain in effect unless the Associate Administrator, upon
request, grants a stay.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
November 9, 2023
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/32023014NOPV>
- Source ID: `phmsa-enforcement`
- SHA-256: `1442ce25c50b3c1b8bb7d1b88b1cbf32b37b39ccd4f4243b250a262a227960e8`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-23T18:11:37.857Z
- Document slug: `phmsa-enforcement-32023014nopv`

### Source metadata

```json
{
  "cpf": "32023014NOPV",
  "operator": "BOARDWALK PETROCHEMICAL PIPELINE, LLC",
  "region": "Central",
  "pipelineType": "INTERSTATE LIQUID",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.444(b)",
    "195.446(c)(1)",
    "195.446(c)(2)",
    "195.446(c)(3)",
    "195.446(e)",
    "195.446(h)(1)",
    "195.446(h)(3)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 7,
  "attachments": [
    {
      "name": "32023014NOPV_Closure Letter_11202024_(22-250434).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32023014NOPV/32023014NOPV_Closure%20Letter_11202024_(22-250434).pdf",
      "bytes": 221348,
      "category": "agency_document"
    },
    {
      "name": "32023014NOPV_Closure Letter_11202024_(22-250434)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32023014NOPV/32023014NOPV_Closure%20Letter_11202024_(22-250434)_text.pdf",
      "bytes": 87165,
      "category": "agency_document"
    },
    {
      "name": "32023014NOPV_Final Order_11092023_(22-250434).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32023014NOPV/32023014NOPV_Final%20Order_11092023_(22-250434).pdf",
      "bytes": 239454,
      "category": "agency_document"
    },
    {
      "name": "32023014NOPV_Final Order_11092023_(22-250434)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32023014NOPV/32023014NOPV_Final%20Order_11092023_(22-250434)_text.pdf",
      "bytes": 177596,
      "category": "agency_document"
    },
    {
      "name": "32023014NOPV_Operator Response to Notice_08242023_(22-250434).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32023014NOPV/32023014NOPV_Operator%20Response%20to%20Notice_08242023_(22-250434).pdf",
      "bytes": 530584,
      "category": "party_submission"
    },
    {
      "name": "32023014NOPV_PCP PCO_07272023_(22-250434).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32023014NOPV/32023014NOPV_PCP%20PCO_07272023_(22-250434).pdf",
      "bytes": 346211,
      "category": "case_document"
    },
    {
      "name": "32023014NOPV_PCP PCO_07272023_(22-250434)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32023014NOPV/32023014NOPV_PCP%20PCO_07272023_(22-250434)_text.pdf",
      "bytes": 190567,
      "category": "case_document"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "BOARDWALK PETROCHEMICAL PIPELINE, LLC"
}
```