## Document text

Notice of Probable Violation involving ALLIANCE PIPELINE L.P.. PHMSA's enforcement data identifies the cited regulations as 195.446(a),  195.446(c)(5). The case was opened on 2024-06-03 and is reported as closed as of 2024-11-07. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32024042NOPV_Closure Letter_11072024_(23-264638).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024042NOPV/32024042NOPV_Closure%20Letter_11072024_(23-264638).pdf

32024042NOPV_Closure Letter_11072024_(23-264638)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024042NOPV/32024042NOPV_Closure%20Letter_11072024_(23-264638)_text.pdf

32024042NOPV_Final Order_10102024_(23-264638).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024042NOPV/32024042NOPV_Final%20Order_10102024_(23-264638).pdf

32024042NOPV_Final Order_10102024_(23-264638)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024042NOPV/32024042NOPV_Final%20Order_10102024_(23-264638)_text.pdf

32024042NOPV_Operator Response to Notice and Request Time Extension_07012024_(23-264638).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024042NOPV/32024042NOPV_Operator%20Response%20to%20Notice%20and%20Request%20Time%20Extension_07012024_(23-264638).pdf

32024042NOPV_PCO_06032024_(23-264638).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024042NOPV/32024042NOPV_PCO_06032024_(23-264638).pdf

32024042NOPV_PCO_06032024_(23-264638)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024042NOPV/32024042NOPV_PCO_06032024_(23-264638)_text.pdf

32024042NOPV_Closure Letter_11072024_(23-264638)_text.pdf

VIA ELECTRONIC MAIL TO: sburrows@pembina.com; hcburns@pembina.com;
bbachmeier@pembina.com
November 7, 2024
Mr. Scott Burrows
President and CEO
Pembina Cochin, LLC
4000 585-8 Avenue SW
Calgary, Alberta, Canada
RE: CPF 3-2024-042-NOPV
Dear Mr. Burrows:
On October 17, 2024, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Alliance Pipeline, L.P. (Alliance) a Final Order in the above-referenced case. This
Order included a Compliance Order requiring Alliance to take actions to complete corrective
measures. On April 1, 2024, Enbridge sold the Alliance Pipeline to Pembina. Based on our
review of the documentation provided by your staff, , it has been determined that you have
complied with the terms of this Final Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Gregory A. Ochs
Director, Central Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Heather Christie-Burns, Vice President-Transmission Pipelines, Pembina US
hcburns@pembina.com
Bob Bachmeier, Manager Regulatory & Environment, US Ops, Pembina US,
bbachmeier@pambina.com

32024042NOPV_Final Order_10102024_(23-264638)_text.pdf

October 10, 2024
VIA ELECTRONIC MAIL TO: sburrows@pembina.com
Scott Burrows
President and Chief Executive Officer
Pembina Pipeline Corporation
4000, 585 – 8th Avenue S.W.
Calgary, Alberta, Canada
Re: CPF No. 3-2024-042-NOPV
Dear Mr. Burrows:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and specifies actions that need to be taken to comply with the pipeline safety
regulations. When the terms of the compliance order are completed, as determined by the
Director, Central Region, this enforcement action will be closed. Service of the Final Order by
e-mail is effective upon the date of transmission and acknowledgement of receipt as provided
under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Greg Ochs, Director, Central Region, Office of Pipeline Safety, PHMSA
Mr. Jaret Sprott, Chief Operating Officer, Pembina Pipeline Corporation,
jsprott@pembina.com
Mr. Bob Bachmeier, Specialist, Regulatory Pembina U.S., Pembina Pipeline Corporation,
bbachmeier@pembina.com



Ms. Heather Christie-Burns, Vice President, Transmission Pipelines, Pembina Pipeline
Corporation, hcburns@pembina.com
Mr. Scott Seibert, Manager, Environment, Operations & Compliance U.S., Pembina
Pipeline Corporation, sseibert@pembina.com
Mr. Jeff Finch, Senior Advisor, Regulatory, Pembina Pipeline Corporation,
jfinch@pembina.com
Mr. Ian Hunt, Director, Gas Operations, Pembina Pipeline Corporation,
ihunt@pembina.com
Mr. John Stevenson, Director, Sustainability, Environment & Regulatory, Pembina
Pipeline Corporation, jstevenson@pembina.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
_____________________________________
In the Matter of )
Alliance Pipeline, L.P., ) CPF No. 3-2024-042-NOPV
a subsidiary of Pembina Pipeline Corp., )
)
)
)
Respondent. )
_____________________________________)
FINAL ORDER
On June 3, 2024, pursuant to 49 C.F.R. § 190.207, the Director, Central Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Alliance Pipeline, L.P.
(Alliance or Respondent).1 The Notice proposed finding that Respondent had violated a pipeline
safety regulation in 49 C.F.R. Part 195. The Notice also proposed certain measures to correct the
violation. Respondent did not contest the allegation of violation or corrective measures, but
requested additional time to complete the corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulation listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 195.446(a) (Item 1) ─ Respondent failed to implement required
procedures addressing the communication of abnormal operating conditions when
a different controller assumes responsibility.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
Compliance Actions
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violation. Respondent requested until
November 1, 2024, to complete the corrective measures. Finding good cause, the request is
approved. The corrective measures must be completed by December 1, 2024. The Director may
grant an additional extension of time to comply with any of the required items upon a written
1 PHMSA’s 2023 inspection informing the Notice was of Alliance’s Control Room Management (CRM) procedures
and records. Prior to the issuance of the Notice, on April 1, 2024, Pembina Pipeline Corporation acquired Alliance.



request timely submitted by the Respondent and demonstrating good cause for an extension.
Upon completion of the ordered actions, Respondent may request that the Director close the
case. Failure to comply with this Order may result in the assessment of civil penalties under 49
C.F.R. § 190.223 or in referral to the Attorney General for appropriate relief in a district court of
the United States.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
October 10, 2024
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/32024042NOPV>
- Source ID: `phmsa-enforcement`
- SHA-256: `cc973838b054487e3bb08ecf79d35dd7a2f082a24c4ea0464c0bb38a8ed011d4`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T19:20:54.764Z
- Document slug: `phmsa-enforcement-32024042nopv`

### Source metadata

```json
{
  "cpf": "32024042NOPV",
  "operator": "ALLIANCE PIPELINE L.P.",
  "region": "Central",
  "pipelineType": "INTRASTATE LIQUID",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.446(a)",
    "195.446(c)(5)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 7,
  "attachments": [
    {
      "name": "32024042NOPV_Closure Letter_11072024_(23-264638).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32024042NOPV/32024042NOPV_Closure%20Letter_11072024_(23-264638).pdf",
      "bytes": 223595,
      "category": "agency_document"
    },
    {
      "name": "32024042NOPV_Closure Letter_11072024_(23-264638)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32024042NOPV/32024042NOPV_Closure%20Letter_11072024_(23-264638)_text.pdf",
      "bytes": 89535,
      "category": "agency_document"
    },
    {
      "name": "32024042NOPV_Final Order_10102024_(23-264638).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32024042NOPV/32024042NOPV_Final%20Order_10102024_(23-264638).pdf",
      "bytes": 492951,
      "category": "agency_document"
    },
    {
      "name": "32024042NOPV_Final Order_10102024_(23-264638)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32024042NOPV/32024042NOPV_Final%20Order_10102024_(23-264638)_text.pdf",
      "bytes": 152061,
      "category": "agency_document"
    },
    {
      "name": "32024042NOPV_Operator Response to Notice and Request Time Extension_07012024_(23-264638).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32024042NOPV/32024042NOPV_Operator%20Response%20to%20Notice%20and%20Request%20Time%20Extension_07012024_(23-264638).pdf",
      "bytes": 319777,
      "category": "party_submission"
    },
    {
      "name": "32024042NOPV_PCO_06032024_(23-264638).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32024042NOPV/32024042NOPV_PCO_06032024_(23-264638).pdf",
      "bytes": 307820,
      "category": "case_document"
    },
    {
      "name": "32024042NOPV_PCO_06032024_(23-264638)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32024042NOPV/32024042NOPV_PCO_06032024_(23-264638)_text.pdf",
      "bytes": 183566,
      "category": "case_document"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "ALLIANCE PIPELINE L.P."
}
```