# CENTRA PIPELINE MINNESOTA INC. — Notice of Amendment

**Citation:** CPF 32024043NOA  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2024-04-16

CLOSED notice of amendment citing 192.465(d), 192.467(d), 192.469, 192.479(a), 192.481(b), 192.613(a), 192.615(b)(2), 192.635(a), 192.805(i).

## Document text

Notice of Amendment involving CENTRA PIPELINE MINNESOTA INC.. PHMSA's enforcement data identifies the cited regulations as 192.465(d),  192.467(d),  192.469,  192.479(a),  192.481(b),  192.613(a),  192.615(b)(2),  192.635(a),  192.805(i). The case was opened on 2024-04-16 and is reported as closed as of 2024-08-13. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32024043NOA_Closure Letter_08132024_(23-265891).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024043NOA/32024043NOA_Closure%20Letter_08132024_(23-265891).pdf

32024043NOA_Closure Letter_08132024_(23-265891)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024043NOA/32024043NOA_Closure%20Letter_08132024_(23-265891)_text.pdf

32024043NOA_Notice of Amendment_04162024_(23-265891).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024043NOA/32024043NOA_Notice%20of%20Amendment_04162024_(23-265891).pdf

32024043NOA_Notice of Amendment_04162024_(23-265891)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024043NOA/32024043NOA_Notice%20of%20Amendment_04162024_(23-265891)_text.pdf

32024043NOA_Operator Response to Notice_05152024_(23-265891).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024043NOA/32024043NOA_Operator%20Response%20to%20Notice_05152024_(23-265891).pdf

32024043NOA_Closure Letter_08132024_(23-265891)_text.pdf

VIA ELECTRONIC MAIL TO: tkarry@efgroupllc.com; ppowers@efgroupllc
August 13, 2024
Mr. Todd Karry
President & CEO
Centra Pipeline Minnesota Inc
33717 Woodward Ave. #600
Birmingham, MI 48009
RE: CPF 3-2024-043-NOA
Dear Mr. Karry:
From August 28 to August 31, 2023, representatives of the Minnesota Office of Pipeline Safety,
acting as an interstate agent for the Pipeline and Hazardous Materials Safety Administration
(PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.), inspected Centra Pipeline
Minnesota, Inc.’s (CPM) procedures for operation and maintenance. As a result of the inspection,
CPM was issued a Notice of Amendment on April 16, 2024, which proposed amendment of your
procedures
CPM submitted its amended procedures on July 15, 2024. My staff has reviewed the amended
procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been
corrected.
This letter is to inform you that no further action is necessary, and this case is now closed. Thank
you for your cooperation.
Sincerely,
Gregory A Ochs
Director, Central Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Phillip Powers, Director Engineering & Integrity (ppowers@efgroupllc)

32024043NOA_Notice of Amendment_04162024_(23-265891)_text.pdf

NOTICE OF AMENDMENT
VIA ELECTRONIC MAIL TO: tkarry@efgroupllc.com; ppowers@efgroupllc.com;
jborphy@efgroupllc.com
April 16, 2024
Mr. Todd Karry
President & CEO
Centra Pipeline Minnesota Inc
33717 Woodward Ave. #600
Birmingham, MI 48009
CPF 3-2024-043-NOA
Dear Mr. Karry:
From August 28 to August 31, 2023, representatives of the Minnesota Office of Pipeline Safety,
acting as an interstate agent for the Pipeline and Hazardous Materials Safety Administration
(PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.), inspected Centra Pipeline
Minnesota, Inc.’s (CPM) procedures for operation and maintenance in Emo, Ontario, Canada.
As a result of the inspection, PHMSA has identified the apparent inadequacies found within
CPM’s plans or procedures. The items inspected and the inadequacies are described below:
1. § 192.465 External corrosion control: Monitoring and remediation.
(a) . . . .
(d) Each operator must promptly correct any deficiencies indicated by the
inspection and testing required by paragraphs (a) through (c) of this section. For
onshore gas transmission pipelines, each operator must develop a remedial action
plan and apply for any necessary permits within 6 months of completing the
inspection or testing that identified the deficiency. Remedial action must be
completed promptly, but no later than the earliest of the following: prior to the next
inspection or test interval required by this section; within 1 year, not to exceed 15



months, of the inspection or test that identified the deficiency; or as soon as
practicable, not to exceed 6 months, after obtaining any necessary permits.
CPM’s written procedure for remediation to correct any deficiencies indicated, by inspection and
testing entitled “INT-PRO-009 Corrosion Control,” did not meet the requirements of
§ 192.465(d). Specifically, there was no guidance or explanation for remedial actions including
what is meant by “prompt”. The procedure must provide clear instructions for personnel to
understand what is expected when they encounter an indicated deficiency and when they must
address those deficiencies. CPM must amend its procedure to meet the requirements of
§ 192.465(d) in order to comply with § 192.605(a).
2. § 192.467 External corrosion control: Electrical isolation.
(a) . . . .
adequate.
(d) Inspection and electrical tests must be made to assure that electrical isolation is
CPM’s “INT-PRO-009 Corrosion Control” procedure, Section 4.7, was inadequate for checking
electrical isolation. The procedure contained the wording of the regulation, but did not provide
any guidance that included the RF-IT device used by CPM field personnel to check for proper
isolation. The procedure must be written to provide CPM personnel sufficient instructions on
completing the task to adequately comply with § 192.605(b)(2).
3. § 192.479 Atmospheric corrosion control; General.
(a) Each operator must clean and coat each pipeline or portion of pipeline that is
exposed to the atmosphere, except pipelines under paragraph (c) of this section.
CPM’s written procedure, entitled “INT-PRO-009 Corrosion Control,” Section 4.2.3, did not
address the transition zone in CPM’s atmospheric corrosion control procedures. Specifically,
Section 4.2.3 did not provide guidance on which coating is allowable at the pipe-to-soil
transition. Detailed procedures must be incorporated into the manual in order to comply with
§ 192.605(b)(2).
4. § 192.469 External corrosion control: Test stations.
Each pipeline under cathodic protection required by this subpart must have
sufficient test stations or other contact points for electrical measurement to
determine the adequacy of cathodic protection.
CPM’s procedure entitled “INT-PRO-009 Corrosion Control,” Section 4.5, did not adequately
describe the process used to determine a sufficient number of test stations to ensure the adequacy
of cathodic protection, as required by § 192.469. CPM’s O&M procedure simply restated the
regulation, which is inadequate; CPM must amend the procedure to provide more detailed
procedures specific to its system to meet the requirements of § 192.469 in order to comply with
§ 192.605(a).



5. § 192.481 Atmospheric corrosion control: Monitoring.
(a) . . . .
(b) During inspections the operator must give particular attention to pipe at soil-to-
air interfaces, under thermal insulation, under disbonded coatings, at pipe supports,
in splash zones, at deck penetrations, and in spans over water.
CPM’s written procedure entitled “INT-PRO-010 – Continuing Surveillance,” Section 6.4
addressed monitoring for atmospheric corrosion, but the procedure as written did not contain
adequate guidance as required by § 192.481(b). Specifically, Section 6.4 did not include any
guidance for personnel to assess pipe-to-soil interfaces and pipe support locations for
atmospheric corrosion. The procedures must be amended to comply with § 192.605(b)(2).
6. §192.613 Continuing surveillance.
(a) Each operator shall have a procedure for continuing surveillance of its facilities
to determine and take appropriate action concerning changes in class location,
failures, leakage history, corrosion, substantial changes in cathodic protection
requirements, and other unusual operating and maintenance conditions.
CPM’s INT-PRO-010 – Continuing Surveillance procedures did not meet the requirements of
§ 192.613 because the procedures for changes in class location did not include any guidance for
identifying Moderate Consequence Areas (MCA). The definition of MCA, per § 192.3, includes
consideration of the number of occupied dwellings as well as four-lane road crossings; this must
be included in CPM’s procedures to ensure that company personnel are aware of these locations
to comply with § 192.605(b)(1).
7. § 192.615 Emergency plans.
(a) . . . .
(b) Each operator shall:
(1) . . . .
(2) Train the appropriate operating personnel to assure that they are knowledgeable
of the emergency procedures and verify that the training is effective.
CPM’s Emergency Training Plan procedure, entitled “INT-PRO-001 Management of Gas
Emergencies,” was inadequate because it did not meet the requirements of § 192.615(b)(2).
Specifically, the procedure did not contain the required training courses and the frequency of the
training to ensure that operating personnel were trained and that the training was effective. The
procedures must be revised to comply with § 192.605(a).



8. § 192.635 Notification of potential rupture.
(a) As used in this part, a “notification of potential rupture” refers to the
notification of, or observation by, an operator (e.g., by or to its controller(s) in a
control room, field personnel, nearby pipeline or utility personnel, the public, local
responders, or public authorities) of one or more of the below indicia of a potential
unintentional or uncontrolled release of a large volume of gas from a pipeline:
CPM’s procedures did not address the notification of potential ruptures, as spelled out in
§ 192.635(a). Specifically, the Management of Gas Emergencies manual did not have any
information or guidance for notification of a rupture by company personnel. The regulation
became effective on April 5, 2022, and must be incorporated into CPM’s procedures to comply
with § 192.615(a)(12).
9. § 192.805 Qualification program.
Each operator shall have and follow a written qualification program. The program
shall include provisions to:
(a) ….
(i) After December 16, 2004, notify the Administrator or a state agency participating
under 49 U.S.C. Chapter 601 if an operator significantly modifies the program after
the administrator or state agency has verified that it complies with this section.
Notifications to PHMSA must be submitted in accordance with §192.18.
CPM’s Operator Qualification (OQ) procedures, GEN-PRO-007, Operator Qualification did not
contain any guidance or requirements to notify PHMSA of any significant OQ program
modifications. CPM must modify its procedures to comply with § 192.805(i).
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in
Enforcement Proceedings.
Please refer to this document and note the response options. Be advised that all material you
submit in response to this enforcement action is subject to being made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5
U.S.C. § 552(b), along with the complete original document you must provide a second copy of
the document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment
under 5 U.S.C. § 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under § 190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue an Order Directing Amendment. If your



plans or procedures are found inadequate as alleged in this Notice, you may be ordered to amend
your plans or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not
contesting this Notice, we propose that you submit your amended procedures to my office within
90 days of receipt of this Notice. This period may be extended by written request for good cause.
Once the inadequacies identified herein have been addressed in your amended procedures, this
enforcement action will be closed.
It is requested that CPM maintain documentation of the safety improvement costs associated
with fulfilling this Notice of Amendment (preparation/revision of plans, procedures) and submit
the total to Gregory A. Ochs, Director, Central Region, Pipeline and Hazardous Materials Safety
Administration. In correspondence concerning this matter, please refer to CPF 3-2024-043-NOA
and, for each document you submit, please provide a copy in electronic format whenever
possible.
Sincerely,
Gregory A. Ochs
Director, Central region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
cc: Phillip Powers, Director Pipeline Operations, ppowers@efgroupllc.com
Joe Brophy, VP/General Manager, jborphy@efgroupllc.com

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/32024043NOA>
- Source ID: `phmsa-enforcement`
- SHA-256: `13253f81b349a473bfb397929a912741c7e43e8a48589663bfc88b420bd80dfc`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T00:53:29.525Z
- Document slug: `phmsa-enforcement-32024043noa`

### Source metadata

```json
{
  "cpf": "32024043NOA",
  "operator": "CENTRA PIPELINE MINNESOTA INC.",
  "region": "Central",
  "pipelineType": "INTERSTATE GAS TRANSMISSION",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.465(d)",
    "192.467(d)",
    "192.469",
    "192.479(a)",
    "192.481(b)",
    "192.613(a)",
    "192.615(b)(2)",
    "192.635(a)",
    "192.805(i)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "32024043NOA_Closure Letter_08132024_(23-265891).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32024043NOA/32024043NOA_Closure%20Letter_08132024_(23-265891).pdf",
      "bytes": 218401,
      "category": "agency_document"
    },
    {
      "name": "32024043NOA_Closure Letter_08132024_(23-265891)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32024043NOA/32024043NOA_Closure%20Letter_08132024_(23-265891)_text.pdf",
      "bytes": 82534,
      "category": "agency_document"
    },
    {
      "name": "32024043NOA_Notice of Amendment_04162024_(23-265891).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32024043NOA/32024043NOA_Notice%20of%20Amendment_04162024_(23-265891).pdf",
      "bytes": 274116,
      "category": "agency_document"
    },
    {
      "name": "32024043NOA_Notice of Amendment_04162024_(23-265891)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32024043NOA/32024043NOA_Notice%20of%20Amendment_04162024_(23-265891)_text.pdf",
      "bytes": 144568,
      "category": "agency_document"
    },
    {
      "name": "32024043NOA_Operator Response to Notice_05152024_(23-265891).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32024043NOA/32024043NOA_Operator%20Response%20to%20Notice_05152024_(23-265891).pdf",
      "bytes": 593039,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "CENTRA PIPELINE MINNESOTA INC."
}
```