# SPIRE MOGAS PIPELINE LLC — Warning Letter

**Citation:** CPF 32025002WL  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2025-05-19

CLOSED warning letter citing 192.631(a)(1), 192.631(c)(1), 192.631(c)(2), 192.631(c)(4), 192.631(h)(6).

## Document text

Warning Letter involving SPIRE MOGAS PIPELINE LLC. PHMSA's enforcement data identifies the cited regulations as 192.631(a)(1),  192.631(c)(1),  192.631(c)(2),  192.631(c)(4),  192.631(h)(6). The case was opened on 2025-05-19 and is reported as closed as of 2025-05-19. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32025002WL_Warning Letter_05192024_(22-237906).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32025002WL/32025002WL_Warning%20Letter_05192024_(22-237906).pdf

32025002WL_Warning Letter_05192024_(22-237906)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32025002WL/32025002WL_Warning%20Letter_05192024_(22-237906)_text.pdf

32025002WL_Warning Letter_05192024_(22-237906)_text.pdf

WARNING LETTER
VIA ELECTRONIC MAIL TO:
scott.smith@spireenergy.com; mark.lowe@spireenergy.com;
randy.wilson@spireenergy.com; dave.feeman@spireenergy.com
May 19, 2025
Mr. Scott Smith
President, Spire Midstream
Spire MOGAS Pipeline LLC
3773 Richmond Avenue, Suite 300
Houston, TX 77002
CPF 3-2025-002-WL
Dear Mr. Smith:
From May 9 through May 13, 2022 and September 21, 2022, a representative of the Pipeline and
Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant
to Chapter 601 of 49 United States Code (U.S.C.), virtually inspected MoGAS Pipeline, LLC’s
(MoGAS) procedures and records for Control Room Management (CRM) in Wentzville,
Missouri. Following the inspection, MoGAS was acquired by Spire Missouri Inc. East in
January 2024.1
As a result of the inspection, it is alleged that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items inspected
and the probable violations are:
1. § 192.631 Control room management.
(a) General.
(1) This section applies to each operator of a pipeline facility with a controller
working in a control room who monitors and controls all or part of a pipeline
facility through a SCADA system. Each operator must have and follow written
control room management procedures that implement the requirements of this
section. . . .
1 National Registry Notification B-20240423-52614 (April 23, 2024). A new OPID (OPID 40855) was requested
and issued under the name Spire MoGAS Pipeline, LLC (SpireMoGAS).



(a) . . . .
(b) Provide adequate information. Each operator must provide its controllers with
the information, tools, processes and procedures necessary for the controllers to
carry out the roles and responsibilities the operator has defined by performing each
of the following:
(1) Implement sections 1, 4, 8, 9, 11.1, and 11.3 of API RP 1165 (incorporated
by reference, see §192.7) whenever a SCADA system is added, expanded or
replaced, unless the operator demonstrates that certain provisions of sections 1,
4, 8, 9, 11.1, and 11.3 of API RP 1165 are not practical for the SCADA system
used;
MoGAS failed to provide records that demonstrated that it implemented sections 1, 4, 8, 9, 11.1,
and 11.3 of API RP 1165, as required by §§ 192.631(c)(1) and 192.631(j)(1). While MoGAS’
“Control Room Manual,” (version 3.2, effective 2019) (CRM Plan), section 4.1 stated, “sections
1, 4, 8, 9, 11.1, and 11.3 of API RP-1165 shall be implemented by MoGAS whenever the
SCADA system is added, expanded or replaced after August 1, 2012,” MoGAS indicated to
PHMSA that, to establish consistency in their SCADA screen design, it “[u]tilize[d] one of its
existing SCADA screens with similar layout to produce the basis layout for new station screens
to maintain consistency with other station screens.” While this supported a level of consistency
when designing and publishing screens, it was not adequate to demonstrate compliance with
§§ 192.631(c)(1) and 192.631(j)(1) because there was no audit or review performed to verify the
SCADA design manual was compliant with API RP 1165 and the screens were compliant with
API RP 1165. Therefore, MoGAS failed to ensure API RP 1165 sections 1, 4, 8, 9, 11.1, and
11.3 were implemented, as required by §§ 192. 631(c)(1) and 192.631(j)(1).
2. § 192.631 Control room management.
(a) General.
(1) This section applies to each operator of a pipeline facility with a controller
working in a control room who monitors and controls all or part of a pipeline
facility through a SCADA system. Each operator must have and follow written
control room management procedures that implement the requirements of this
section . . . .
(b) . . . .
(c) Provide adequate information. Each operator must provide its controllers with
the information, tools, processes and procedures necessary for the controllers to
carry out the roles and responsibilities the operator has defined by performing each
of the following:
(1) . . . .
(2) Conduct a point-to-point verification between SCADA displays and related
field equipment when field equipment is added or moved and when other
changes that affect pipeline safety are made to field equipment or SCADA
displays;
MoGAS failed to provide a record to demonstrate the completion of the initial point-to-point
when the new SPIRE STL interconnect was added to the SCADA display, per the requirements
of § 192.631(c)(2). The SPIRE STL facility became operational on December 11, 2020 and



published to the SCADA system for controllers to monitor and control that same day. Per
MoGAS, a point-to-point (P2P) was completed prior to publishing to the production SCADA
system. However, MoGAS was unable to provide a record of the P2P verification, as required
by § 192.631(j)(1).
In addition, MoGAS’ CRM Plan, section 4.2, was inadequate to support a thorough P2P to
demonstrate compliance. MoGAS’ CRM Plan identified two forms—Form 4.2 Alarm Set Point
and Verification and Form 6.2c, for safety related points—required to be used to document the
P2P verification. MoGAS’ CRM Plan did not provide enough detail on what was required to be
documented on each form. For example, subsections 2b and 2c stated, “Controllers will confirm
that the SCADA display is reflecting the same values being observed in the field and
documented via Form 4.2 Alarm Set Points and Verification Log. If the point is a Safety Related
Point it will be verified on Form 6.2c. Information that must be verified:….(b) [d]ata value or
status, and (c) any alarm settings.” The intent of a P2P is to verify field conditions and data
match SCADA information being presented to the controller. Thus, P2P records need to
document the comparison of values/status and not just that the comparison was observed.
Therefore, the CRM Plan failed to include required documentation, such as documenting the
field value/status and SCADA value/status. For adequate documentation of alarms, the
documentation must include verification that the alarms presented at the designated set points
with the correct priority and description. CRM Plan section 3 only required a “representative
sampling of SCADA screens.” This is not adequate for new commissioned points into SCADA.
All screens must be verified and documented.
Furthermore, the CRM Plan did not include documentation requirements for: (1) the name of the
employee verifying in the field and the name of the employee verifying SCADA, (2) the date of
the verification, (3) whether the point was verified live or through simulation, and (4) any
comments related to the verification and follow up items to correct and retest the point if
required. Therefore, MoGAS’ procedures were deficient and caused MoGAS to be unable to
provide adequate records demonstrating the completion of the P2P when the new SPIRE STL
interconnect was added to the SCADA display, per the requirements of § 192.631(c)(2).
3. § 192.631 Control room management.
(a) General.
(1) This section applies to each operator of a pipeline facility with a controller
working in a control room who monitors and controls all or part of a pipeline
facility through a SCADA system. Each operator must have and follow written
control room management procedures that implement the requirements of this
section . . . .
(b) . . . .
(c) Provide adequate information. Each operator must provide its controllers with
the information, tools, processes and procedures necessary for the controllers to
carry out the roles and responsibilities the operator has defined by performing each
of the following:
(1) . . . .
(4) Test any backup SCADA systems at least once each calendar year, but at
intervals not to exceed 15 months;



MoGAS failed to adequately test its backup SCADA system and failed to provide a record of the
tests for the backup SCADA system in 2019 and 2021, per the requirements of §§ 192.631(c)(4)
and 192.631(j)(1). MoGAS also failed to follow its CRM Plan, section 4.4, which required
testing both control room backup systems, “[a]t least monthly, in periods not to exceed 15
months.” Specifically, in 2019 and 2021, MoGAS only tested the functionality to transfer and
operate on the backup SCADA servers and did not travel to the backup control room and operate
from the facility. Backup SCADA systems include SCADA servers, HMIs, printers, IT business
systems, FAX machines, building access and anything related to the function of a control room.
In addition, MoGAS’ CRM Plan section 4.4 was inadequate to provide instructions to MoGAS’
controllers on how to thoroughly conduct and document the test. The CRM Plan failed to
contain any instructions on (1) how the transfer was to be completed, (2) how controllers were to
relocate, (3) who and what are the qualifications to monitor the system during travel between
facilities, as the procedure stated, “[field] personnel [at the back up location] may monitor the
system until [primary control room] gas controllers can travel to the [backup] location to take
over,” and (4) how the system would be transferred back from the backup control room to
primary control room. While MoGAS’ CRM Plan contained a requirement to “confirm
reception of good data,” it did not require the use of a check list, or other documentation tools, to
document the testing of key SCADA functions or to document the operating server. Therefore,
MoGAS failed to adequately test its backup SCADA system, per the requirements of
§ 192.631(c)(4).
4. § 192.631 Control room management.
(a) General.
(1) This section applies to each operator of a pipeline facility with a controller
working in a control room who monitors and controls all or part of a pipeline
facility through a SCADA system. Each operator must have and follow written
control room management procedures that implement the requirements of this
section. . . .
(b) . . . .
(h) Training. Each operator must establish a controller training program and
review the training program content to identify potential improvements at least
once each calendar year, but at intervals not to exceed 15 months. An operator's
program must provide for training each controller to carry out the roles and
responsibilities defined by the operator. In addition, the training program must
include the following elements:
(1) . . . .
(6) Control room team training and exercises that include both controllers and
other individuals, defined by the operator, who would reasonably be expected to
operationally collaborate with controllers (control room personnel) during
normal, abnormal or emergency situations. Operators must comply with the
team training requirements under this paragraph no later than January 23, 2018.
MoGAS failed to have a procedure to address the requirements to conduct team training and
failed to conduct team training for 2019, 2020, 2021, as required by §§ 192.605(b)(12) and
192.631(h)(6). When asked by PHMSA during the inspection, MoGAS failed to (1) provide a



procedure for the team training, or (2) conduct control room team training, and (3) identify
personnel that would operationally collaborate with controllers as required by the code.
Therefore, MoGAS failed to follow the requirements of §§ 192.605(b)(12) and 192.631(h)(6).
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$272,926 per violation per day the violation persists, up to a maximum of $2,729,245 for a
related series of violations. For violation occurring on or after December 28, 2023 and before
December 30, 2024 the maximum penalty may not exceed $266,015 per violation per day the
violation persists, up to a maximum of $2,660,135 for a related series of violations. For violation
occurring on or after January 6, 2023 and before December 28, 2023 the maximum penalty may
not exceed $257,664 per violation per day the violation persists, up to a maximum of $2,576,627
for a related series of violations. For violation occurring on or after March 21, 2022 and before
January 6, 2023 the maximum penalty may not exceed $239,142 per violation per day the
violation persists, up to a maximum of $2,391,142 for a related series of violations. For violation
occurring on or after May 3, 2021 and before March 21, 2022 the maximum penalty may not
exceed $225,134 per violation per day the violation persists, up to a maximum of $2,251,334 for
a related series of violations. For violation occurring on or after January 11, 2021 and before
May 3, 2021 the maximum penalty may not exceed $222,504 per violation per day the violation
persists, up to a maximum of $2,225,034 for a related series of violations. For violation
occurring on or after July 31, 2019 and before January 11, 2021 the maximum penalty may not
exceed $218,647 per violation per day the violation persists, up to a maximum of $2,186,465 for
a related series of violations.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 3-2025-002-WL. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. § 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. § 552(b).
Sincerely,
David Barrett
Acting Director, Central Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Mark Lowe, Senior VP- Eng, Gas Supply & Ops Services, Spire MOGAS Pipeline, LLC,
mark.lowe@spireenergy.com
Randy Wilson, Director Compliance, Spire MOGAS Pipeline, LLC,
randy.wilson@spireenergy.com
David Feeman, Director, Spire MOGAS Pipeline, LLC, dave.feeman@spireenergy.com

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/32025002WL>
- Source ID: `phmsa-enforcement`
- SHA-256: `0eba872070d706e26c6281ee151c0c4b7208c50696168b392f3c33278a8eb182`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T23:13:22.625Z
- Document slug: `phmsa-enforcement-32025002wl`

### Source metadata

```json
{
  "cpf": "32025002WL",
  "operator": "SPIRE MOGAS PIPELINE LLC",
  "region": "Central",
  "pipelineType": "INTERSTATE GAS TRANSMISSION",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.631(a)(1)",
    "192.631(c)(1)",
    "192.631(c)(2)",
    "192.631(c)(4)",
    "192.631(h)(6)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "32025002WL_Warning Letter_05192024_(22-237906).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32025002WL/32025002WL_Warning%20Letter_05192024_(22-237906).pdf",
      "bytes": 314344,
      "category": "agency_document"
    },
    {
      "name": "32025002WL_Warning Letter_05192024_(22-237906)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/32025002WL/32025002WL_Warning%20Letter_05192024_(22-237906)_text.pdf",
      "bytes": 190540,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "SPIRE MOGAS PIPELINE LLC"
}
```