# RIO VISTA ENERGY PARTNERS, LP — Notice of Probable Violation

**Citation:** CPF 420045022  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2004-05-20

CLOSED notice of probable violation citing 195.452(b)(2).

## Document text

Notice of Probable Violation involving RIO VISTA ENERGY PARTNERS, LP. PHMSA's enforcement data identifies the cited regulation as 195.452(b)(2). The case was opened on 2004-05-20 and is reported as closed as of 2005-03-18. Proposed civil penalty: $5,000. Assessed civil penalty: $5,000. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420045022_Final Order_03182005.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420045022/420045022_Final%20Order_03182005.pdf

cpf420045022.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420045022/cpf420045022.pdf

420045022_Final Order_03182005.pdf

@
U.S. Deporfment
of Tronsportolion
Plpelin€ qnd
Hozoldous moleriols Sofety
Administrqtion
400 Seventh Street, S.W.
Washington, D.C. 20590
[4Ait i I ii]i,',
Mr. Charles C. Handly
Executive Vice President
Penn Octane Corporation
Two Memorial CityPlaza
820 Gessner, Suite 1285
Houston, Texas 77024
Re: CPF No. 4-2004-5022
Dear Mr. Handly:
Enclosed is the Final Order issued by the Associate Administrator for Pipeline Safety in
the above-referenced case. It makes a finding of violation and assesses a civil penalty. I
acknowiedge receipt of and accept your wire hansfer for $5,000 as payment in full of the civil
penalty assessed in the Final Order. The Finai Order also acknowledges your completion of the
proposed compliance order items to comply with the pipeline safety regulations. This case is
now closed. Your receipt of the Final Order constitutes service of that document under
49 C.F.R. 6 190.5.
Sincerely,
N /,r
d-* Yb-
James Reynolds
Pipeline Compliance Registry
Office of Pioeline Safety
Enclosure
Rod Seeley, Region Director
Southwest Region, OPS
CERTIFIED MAIL'_ RETT]RN RECEIPT FJOUESTED



DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS'MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON. DC 20590
In the Matter of
Penn Octane Corporation,
Respondent
CPF No. 4-2004-5022
FINAL ORDER
On May 20,2004, in accordance with 49 C.F.R. $ 190.207, the Director, Southwest Region,
Office of Pipeline Safety (OPS), issued Respondent a Notice of Probable Violation, Proposed
Civil Penalty and Proposed Compliance Order (Notice). The Notice proposed frnding that
Respondent had violated 49 C.F.R. $ 195.452(bX2) and proposed assessing a civil penalty of
$S,OOO for the alleged violation. The Notice also proposed that Respondent take certain
measures to correct the alleged violation.
After requesting and receiving an extension of time to respond, Respondent submitted
information on September 16, September 20, and November 16,2004, conceming the corrective
actions it has taken. Respondent submitted a wire transfer in the amount of the proposed civil
penalty (s5,000) on June 17,2004, waiving further nght to respond and authorizing the entry of
this Final Order.
pursuant to 49 C.F.R. g 190.213 and 49 U.S.C. $ 60122,I find that Respondent violated the
following section of 49 C.F.R. Pafi 195, as more fully described in the Notice:
49 C.F.R. $ 195.452(b)(2) - failing to include in the written integrity management
program an ldentihcation of each Category 2 pipeline or pipeline segment by November
18,2002.
This finding of violation will be considered a prior offense in any subsequent enforcement actron
taken agaiist Respondent. I assess Respondent a civil penalty of $5,000, already paid by
Respondent.
The Notice aiso proposed a compliance oider fbr the violation of 49 C.F-R-. $ 195'452(bx2)'
Under 49 U.S.C. i OOt t Slu;, "u.h p".ron who engages in the transportaJi-on of hazardous liquids
or who owns or operates a-pipeline facility is required to comply with the appticable safety
standards established una.. ihapter 601. The Director, Southwest Region, OPS, has reviewed



z
the corrective action taken by Respondent and has indicated that the corrective action has
achieved compliance with respect to this violation. Accordingly, since compliance has been
achieved, it is not necessary to include the compliance terms in this order.
The lerms antl conditions of this Final Order are effeclive on receipt.
-,
iiiAri I 8 ],ii;:
Date Issued
e Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/420045022>
- Source ID: `phmsa-enforcement`
- SHA-256: `e329847477c3c35cba33c700b2e93444262d5c0c0fb2ea7a7bfac7ef5509cc0a`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T04:03:24.067Z
- Document slug: `phmsa-enforcement-420045022`

### Source metadata

```json
{
  "cpf": "420045022",
  "operator": "RIO VISTA ENERGY PARTNERS, LP",
  "region": "Southwest",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.452(b)(2)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "420045022_Final Order_03182005.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420045022/420045022_Final%20Order_03182005.pdf",
      "bytes": 89083,
      "category": "agency_document"
    },
    {
      "name": "cpf420045022.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420045022/cpf420045022.pdf",
      "bytes": 231434,
      "category": "case_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "RIO VISTA ENERGY PARTNERS, LP"
}
```
