# CHEVRON PIPE LINE CO — Notice of Probable Violation

**Citation:** CPF 420117003  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2011-06-29

CLOSED notice of probable violation citing 195.54(b).

## Document text

Notice of Probable Violation involving CHEVRON PIPE LINE CO. PHMSA's enforcement data identifies the cited regulation as 195.54(b). The case was opened on 2011-06-29 and is reported as closed as of 2012-03-05. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420117003_Final Order_03052012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420117003/420117003_Final%20Order_03052012.pdf

420117003_Final Order_03052012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420117003/420117003_Final%20Order_03052012_text.pdf

420117003_NOPV PCO_06292011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420117003/420117003_NOPV%20PCO_06292011.pdf

420117003_NOPV PCO_06292011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420117003/420117003_NOPV%20PCO_06292011_text.pdf

420117003_Operator_Response_to_NOPV_PCO_07292011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420117003/420117003_Operator_Response_to_NOPV_PCO_07292011.pdf

420117003_Final Order_03052012_text.pdf

MAR 5 2012
Mr. Randall L. Curry
President
Chevron Pipe Line Company
4800 Fournace Place
Bellaire, TX 77401
Re: CPF No. 4-2011-7003
Dear Mr. Curry:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding
of violation and finds that Chevron Pipe Line Company has completed the actions specified in
the Notice to comply with the pipeline safety regulations. Therefore, this case is now closed.
Service of the Final Order by certified mail is deemed effective upon the date of mailing, or as
otherwise provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Gary M. Saenz, Team Leader, Chevron Pipe Line
Mr. R. M. Seeley, Director, Southwest Region, OPS
Mr. Alan Mayberry, Deputy Associate Administrator for Field Operations, OPS
CERTIFIED MAIL - RETURN RECEIPT REQUESTED [ 71791000164203306569_]



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
Chevron Pipe Line Company, ) CPF No. 4-2011-7003
)
Respondent. )
____________________________________)
FINAL ORDER
On January 26, 2011, pursuant to 49 U.S.C. § 60117, representatives of the Pipeline and
Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), initiated
an investigation of an accident that occurred on January 26, 2011, on the 10-inch Grand Bay
crude oil pipeline operated by Chevron Pipe Line Company (Chevron or Respondent). The
Grand Bay pipeline is part of the Cypress pipeline system that originates at Chevron’s offshore
facilities in the Gulf of Mexico and ends at the Empire-Ostrica Terminal. The Empire-Ostrica
Terminal is located near the east bank of the Mississippi River approximately three miles south
of Empire, Plaquemines Parish, Louisiana.
As a result of the investigation, the Director, Southwest Region, OPS (Director), issued to
Respondent, by letter dated June 29, 2011, a Notice of Probable Violation and Proposed
Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the Notice proposed
finding that Chevron had violated 49 C.F.R. § 195.54 and proposed ordering Respondent to take
certain measures to correct the alleged violation.
Chevron responded to the Notice by letter dated July 29, 2011 (Response). The company
contested the allegation and offered additional information in response to the Notice.
Respondent did not request a hearing and therefore has waived its right to one.
FINDING OF VIOLATION
The Notice alleged that Respondent violated 49 C.F.R. Part 195, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.54(b), which states:



2
§ 195.54 Accident reports.
(a) Each operator that experiences an accident that is required to be
reported under § 195.50 shall as soon as practicable, but not later than 30
days after discovery of the accident, prepare and file an accident report on
DOT Form 7000-1, or a facsimile.
(b) Whenever an operator receives any changes in the information
reported or additions to the original report on DOT Form 7000-1, it shall
file a supplemental report within 30 days.
The Notice alleged that Respondent violated 49 C.F.R. § 195.54(b) by failing to file a
supplemental report within 30 days of receiving additions to the original report filed by Chevron
on February 15, 2011. Specifically, the Notice alleged that Chevron received a metallurgical
failure analysis report on or about March 1, 2011, but that as of June 16, 2011, the company had
still not filed a supplemental DOT Form 7000-1 with OPS that reflected the changed or
supplemental information on the probable cause of the failure.
1
The original DOT Form 7000-1 listed “Excavation Damage by Operator’s Contractor” as the
cause of the accident and “Previous Damage” as the root cause, but provided no further
information regarding factors that contributed to the accident.2 The metallurgical report,
concluded that “[t]he failure of the pipeline occurred by brittle, tensile fracture at an area of pre-
existing mechanical damage” and included an explanation of the evidence demonstrating a
brittle fracture was well defined by microstructural features revealed by metallographic
“brittle failure.”3 The report also noted that “[t]he susceptibility of the line pipe material to
examination.”
In its Response, Chevron argued that it was not required to file a supplemental report within 30
days of receiving the metallurgical failure analysis. The company indicated that it had
considered the metallurgical report to be “part of an ongoing internal Root Cause Analysis” and
stated that the metallurgy results were “not determined to be the only contributing factor.”4
Chevron claimed that there was no change to the information reported in the original DOT Form
7000-1 until June 22, 2011, when the Root Cause Analysis summary was received, and that
therefore a supplemental report was not due until 30 days after June 22, 2011. Chevron stated
that it had submitted a supplemental report on June 22, 2011, and therefore had not violated
§ 195.54.
1 Notice at 2.
2 Pipeline Safety Violation Report (Violation Report), (January 26, 2011), Exhibit A (on file with PHMSA).
3 Id.
4 Response at 1.



3
I disagree. Section 195.54(b) requires an operator to file a supplemental report after receipt of
any “changes” or “additions” to the information originally reported. DOT Form 7000-1 instructs
the operator to “[d]escribe secondary, contributing or root causes of the Accident” in Part H of
accident falls within the scope of secondary, contributing, or root causes, and in this case would
have been an “addition” to the original report. Therefore, a supplemental report on DOT Form
the form.5 I find that information about the material properties of the pipe that contributed to the
7000-1 was required within 30 days of receipt of the metallurgical report.
Accordingly, after considering all of the evidence and the legal issues presented, I find that
Respondent violated 49 C.F.R. § 195.54 by failing to file a supplemental report on DOT Form
7000-1 within 30 days of receiving changes in the information reported or additions to the
original report.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Item 1 in the Notice, for a violation of
49 C.F.R. § 195.54. Under 49 U.S.C. § 60118(a), each person who engages in the transportation
of hazardous liquids or who owns or operates a pipeline facility is required to comply with the
applicable safety standards established under chapter 601. The Director indicates that
Respondent has taken the following action specified in the proposed compliance order:
1. With respect to the violation of § 195.54(b) (Item 1), Respondent filed
a supplemental DOT Form 7000-1 on June 22, 2011, and filed a final
DOT Form 7000-1 on August 22, 2011.
Accordingly, I find that compliance has been achieved with respect to this violation. Therefore,
the compliance terms proposed in the Notice are not included in this Order.
Under 49 C.F.R. § 190.215, Respondent has a right to submit a Petition for Reconsideration of
this Final Order. The petition must be sent to: Associate Administrator, Office of Pipeline
Safety, PHMSA, 1200 New Jersey Avenue, SE, East Building, 2nd Floor, Washington, DC
20590, with a copy sent to the Office of Chief Counsel, PHMSA, at the same address. PHMSA
will accept petitions received no later than 20 days after receipt of service of this Final Order by
the Respondent, provided they contain a brief statement of the issue(s) and meet all other
5 Violation Report, Exhibit A.



4
requirements of 49 C.F.R. § 190.215. Unless the Associate Administrator, upon request, grants a
stay, the terms and conditions of this Final Order are effective upon service in accordance with
49 C.F.R. § 190.5.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/420117003>
- Source ID: `phmsa-enforcement`
- SHA-256: `2a5b7b0889ede2b5ef70cb235e01ed3d2ea0be58bb56a8cfc56cd6bcc7adbae9`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-23T23:57:03.123Z
- Document slug: `phmsa-enforcement-420117003`

### Source metadata

```json
{
  "cpf": "420117003",
  "operator": "CHEVRON PIPE LINE CO",
  "region": "Southwest",
  "pipelineType": "INTERSTATE LIQUID OFFSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.54(b)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "420117003_Final Order_03052012.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420117003/420117003_Final%20Order_03052012.pdf",
      "bytes": 71590,
      "category": "agency_document"
    },
    {
      "name": "420117003_Final Order_03052012_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420117003/420117003_Final%20Order_03052012_text.pdf",
      "bytes": 27521,
      "category": "agency_document"
    },
    {
      "name": "420117003_NOPV PCO_06292011.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420117003/420117003_NOPV%20PCO_06292011.pdf",
      "bytes": 433939,
      "category": "case_document"
    },
    {
      "name": "420117003_NOPV PCO_06292011_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420117003/420117003_NOPV%20PCO_06292011_text.pdf",
      "bytes": 24646,
      "category": "case_document"
    },
    {
      "name": "420117003_Operator_Response_to_NOPV_PCO_07292011.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420117003/420117003_Operator_Response_to_NOPV_PCO_07292011.pdf",
      "bytes": 75343,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "CHEVRON PIPE LINE CO"
}
```