# TENNESSEE GAS PIPELINE COMPANY — Notice of Probable Violation

**Citation:** CPF 420121020  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2012-11-05

CLOSED notice of probable violation citing 192.469.

## Document text

Notice of Probable Violation involving TENNESSEE GAS PIPELINE COMPANY. PHMSA's enforcement data identifies the cited regulation as 192.469. The case was opened on 2012-11-05 and is reported as closed as of 2013-12-26. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420121020_Final Order_12262013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420121020/420121020_Final%20Order_12262013.pdf

420121020_Final Order_12262013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420121020/420121020_Final%20Order_12262013_text.pdf

420121020_NOPV PCO_11022012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420121020/420121020_NOPV%20PCO_11022012.pdf

420121020_NOPV PCO_11022012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420121020/420121020_NOPV%20PCO_11022012_text.pdf

420121020_NOPV PCO_11052012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420121020/420121020_NOPV%20PCO_11052012.pdf

420121020_NOPV PCO_11052012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420121020/420121020_NOPV%20PCO_11052012_text.pdf

420121020_Operator_Request_for_Hearing_and_Response_to_NOPV_PCO_12072012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420121020/420121020_Operator_Request_for_Hearing_and_Response_to_NOPV_PCO_12072012.pdf

420121020_Final Order_12262013_text.pdf

DECEMBER 26, 2013
Mr. Steven J. Kean
President and COO
Kinder Morgan, Inc.
1001 Louisiana St, Suite 1000
Houston, TX 77002
Re: CPF No. 4-2012-1020
Dear Mr. Kean:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and finds that Tennessee Gas Pipeline Company has completed the actions specified in
the proposed compliance order to comply with the pipeline safety regulations. There is no
further action required to be taken with regard to this case. Service of the Final Order by
certified mail is effective as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Rodrick Seeley, Director, Southwest Region, OPS
Ms. Jessica Toll, Assistant General Counsel, Kinder Morgan, Inc.
370 Van Gordon St, Lakewood, Colorado 80228
Ms. Susie Richmond, Manager DOT Compliance, Kinetica Partners LLC
224 Aviation Rd, Houma, LA 70360
CERTIFIED MAIL – RETURN RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Tennessee Gas Pipeline Company, ) CPF No. 4-2012-1020
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On June 18-22, 2012, pursuant to 49 U.S.C. § 60117, a representative of the Pipeline and
Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS),
conducted a pipeline safety inspection of the offshore gas pipeline system operated by Tennessee
Gas Pipeline Company (TGP or Respondent) in Louisiana.1
As a result of the inspection, the Director, Southwest Region, OPS (Director), issued a Notice of
Probable Violation and Proposed Compliance Order (Notice) to Respondent on November 5,
2012. In accordance with 49 C.F.R. §§ 190.207 and 190.217, the Notice alleged that Respondent
committed a violation of the natural gas pipeline safety regulations and proposed that corrective
action be taken. The Notice did not propose a civil penalty.
On December 7, 2012, TGP responded to the Notice by contesting the alleged violation and
requesting a hearing. Respondent submitted additional written material on February 19, 2013.
In accordance with 49 C.F.R. § 190.211, a hearing was held on February 28, 2013, in Houston,
Texas, before the Presiding Official from the Office of Chief Counsel, PHMSA. Respondent
provided a post-hearing written submittal on April 4, 2013.
FINDING OF VIOLATION
The Notice alleged that Respondent violated 49 C.F.R. § 192.469, which states:
1 TGP, a subsidiary of Kinder Morgan Energy Partners, L.P., operates approximately 13,500 miles of pipeline
transporting natural gas from Louisiana and Texas to states in the Northeast, as reported for calendar year 2012
pursuant to 49 C.F.R. § 191.17. The facilities inspected were sold to Kinetica Partners LLC during the course of this
proceeding.



2
§ 192.469 External corrosion control: Test stations.
Each pipeline under cathodic protection required by this subpart must
have sufficient test stations or other contact points for electrical
measurement to determine the adequacy of cathodic protection.
The Notice alleged that Respondent violated § 192.469 by failing to evaluate test stations on its
offshore gas pipeline system to ensure they were sufficient to determine the adequacy of cathodic
protection. Specifically, in 2004, two test stations were removed when a third-party production
company decommissioned and removed offshore platforms where the test stations were located.
The Notice alleged that Respondent did not replace the test stations and did not perform an
evaluation of the appropriate locations for testing to determine the adequacy of cathodic
protection.
At the hearing and in its written submissions, TGP explained that it was not the operator of the
system when the platforms and test stations were removed. The pipelines were designed and
operated by another company until 2008, when TGP began operating the lines. Respondent
contended that during its acquisition of the pipelines in 2007 and 2008, the company analyzed
cathodic protection data and concluded there were sufficient test stations. To support this
assertion, Respondent submitted an affidavit dated April 3, 2013, from the individual who
performed the analysis.
2 The individual stated that as Principal Corrosion Specialist for TGP, he
examined all of the corrosion data for the system in 2007 and concluded there were sufficient test
stations and adequate cathodic protection.
Respondent also presented a documented engineering analysis of the offshore system that it
prepared in response to the Notice. Respondent explained that the system has 132 contact points
across approximately 1300 miles of offshore pipeline. Due to the electrically continuous nature
of the system, Respondent found the contact points were sufficiently spaced to demonstrate
adequate cathodic protection. Respondent also explained that offshore there is reliable galvanic
cathodic protection, there is no soil resistivity, no coating degradation due to soil stress, no
increases in ground bed circuit resistance, no cyclical variations due to weather changes, and less
concern for electrical isolation, shorted casings, and stray currents. Respondent produced graphs
and diagrams to support these assertions.
TGP also argued that § 192.469 does not require replacement of the two test stations that were
removed because the regulation only requires test stations at accessible locations. When the two
platforms were removed in 2004, the locations were no longer accessible and therefore the
company was not required to replace the stations. To support this argument, Respondent cited
the preamble to the 1976 final rule adopting § 192.469, which stated that “tests from accessible
locations are ‘sufficient’ to determine the adequacy of cathodic protection in an offshore
environment.”3 Respondent also cited a consensus standard that states test leads for offshore
pipelines are usually limited to platforms and the pipeline entrance to the shore.4
2 TGP Post Hearing Submittal (Apr. 4, 2013), Attachment 2.
3 Offshore Pipeline Facilities, 41 Fed. Reg. 34598, 34603 (Aug. 16, 1976).
4 ASME B31.8 (2007), section A862.15. The B31.8 standard is not incorporated by reference in § 192.469, but is
incorporated by reference in Part 192 for other purposes, see § 192.7.



3
Finally, Respondent argued that a similar regulation for hazardous liquid pipelines, § 195.567(a),
does not require test stations for buried or submerged offshore liquid pipelines. In the preamble
for that rule, PHMSA stated “we believe readings taken by operators at offshore platforms or on
shore are used satisfactorily to determine the adequacy of protection over the entire pipeline.
Moreover, this test method is acceptable for offshore gas pipelines under paragraph A862.15 of
the ASME B31.8 Code.”5
At the hearing, OPS maintained that even though the platforms were removed before Respondent
began operating the pipelines, Respondent was required to have documentation demonstrating
compliance with § 192.469. OPS stated that it presumed there was an engineering basis for the
original location of the two test stations that were removed. For example, one of the test stations
had been located at the end of a lateral, so its removal left the entire lateral without a test station.
Since each station was presumed to be located purposefully, OPS argued that the stations could
not simply be removed without analyzing whether a sufficient number of test stations remained
to verify adequate cathodic protection.
Analysis and Findings
Section 192.469 requires operators to ensure their cathodic protection systems have a
“sufficient” number of test stations so that the operator can determine the adequacy of cathodic
protection. This is a performance-based requirement. The regulation does not establish a
specific number of test stations, but rather establishes a minimum level of safety that must be
achieved.
It is inherent to this performance-based requirement that an operator use acceptable means for
analyzing data to determine whether its test stations are sufficient. Without performing such an
analysis, an operator cannot be certain that test stations are sufficient for ensuring adequate
cathodic protection. It is also inherent that the operator document its decision-making process so
that OPS can verify the operator’s conclusions during a compliance inspection.6
As the operator of the system in question, Respondent was required to have documentation
demonstrating that the number and location of test stations and other relevant factors had been
analyzed and found to be sufficient for determining the adequacy of cathodic protection.
The affidavit submitted by Respondent is not an acceptable substitute for the documentation
required, because it was not prepared at the time of the analysis and did not include the data and
analysis behind the operator’s conclusion that the test stations were sufficient.
The recent engineering analysis prepared by Respondent is the type of information PHMSA
expects to be available during a compliance inspection. As explained below, the documentation
demonstrates there are sufficient test stations to determine the adequacy of the protection.
5 Controlling Corrosion on Hazardous Liquid and Carbon Dioxide Pipelines, 66 Fed. Reg. 66994, 66997
(Dec. 27, 2001).
6 See Nustar Logistics, L.P., CPF No. 4-2005-5048, p.3-4, 2009 WL 1211363 (Mar. 11, 2009) (also available at
http://www.phmsa.dot.gov/pipeline/enforcement) (finding a violation of § 195.406(b) where the operator failed to
produce a documented analysis demonstrating the system had “adequate” pressure controls and equipment).



4
Although this renders the proposed compliance order unnecessary, it does not rebut the
allegation of violation because it was not prepared until after the OPS inspection.
Finally, Respondent successfully argued that § 192.469 requires test stations at accessible
locations, but this does not negate the requirement to have documentation demonstrating
compliance.
Accordingly, I find Respondent violated § 192.469 by failing to have a documented analysis to
demonstrate there were sufficient test stations for determining the adequacy of cathodic
protection on its offshore gas pipeline system.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
COMPLIANCE ORDER
Under 49 U.S.C. § 60118(a), each person who owns or operates a gas pipeline facility is required
to comply with the applicable safety standards established under chapter 601, including those
established in 49 C.F.R. Part 192. PHMSA may order a person to comply with those standards
as set forth in 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217.
The Director has indicated that Respondent completed the actions proposed in the Notice to
achieve compliance. Those actions include performing a documented evaluation of the cathodic
protection system and pipeline design. The evaluation demonstrated there are sufficient test
stations for electrical measurement to determine the adequacy of the protection. Since
Respondent has achieved compliance with respect to this issue, there is no need to issue an order
directing compliance. No further action is required to be taken by Respondent with regard to this
case.
Under 49 C.F.R. § 190.243 (formerly § 190.215), Respondent may submit a petition for
reconsideration of this Final Order to the Associate Administrator for Pipeline Safety, PHMSA,
1200 New Jersey Avenue SE, East Building, 2nd Floor, Washington, DC 20590, no later than 20
days after receipt of the Final Order by the Respondent. Any petition submitted must contain a
brief statement of the issue(s) and meet all other requirements of 49 C.F.R. § 190.243. The terms
of the order remain in effect upon the filing of a petition, unless the Associate Administrator,
upon request, grants a stay.
The terms and conditions of this Final Order are effective upon service in accordance with
49 C.F.R. § 190.5.
___________________________________ ________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/420121020>
- Source ID: `phmsa-enforcement`
- SHA-256: `30fdfda08d56c25ce51073e0c8797246771e7b4b0d6372991b6b9cfd9287f967`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-24T17:33:10.896Z
- Document slug: `phmsa-enforcement-420121020`

### Source metadata

```json
{
  "cpf": "420121020",
  "operator": "TENNESSEE GAS PIPELINE COMPANY",
  "region": "Southwest",
  "pipelineType": "GAS INTERSTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.469"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 7,
  "attachments": [
    {
      "name": "420121020_Final Order_12262013.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420121020/420121020_Final%20Order_12262013.pdf",
      "bytes": 296629,
      "category": "agency_document"
    },
    {
      "name": "420121020_Final Order_12262013_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420121020/420121020_Final%20Order_12262013_text.pdf",
      "bytes": 22145,
      "category": "agency_document"
    },
    {
      "name": "420121020_NOPV PCO_11022012.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420121020/420121020_NOPV%20PCO_11022012.pdf",
      "bytes": 58024,
      "category": "case_document"
    },
    {
      "name": "420121020_NOPV PCO_11022012_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420121020/420121020_NOPV%20PCO_11022012_text.pdf",
      "bytes": 14616,
      "category": "case_document"
    },
    {
      "name": "420121020_NOPV PCO_11052012.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420121020/420121020_NOPV%20PCO_11052012.pdf",
      "bytes": 58529,
      "category": "case_document"
    },
    {
      "name": "420121020_NOPV PCO_11052012_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420121020/420121020_NOPV%20PCO_11052012_text.pdf",
      "bytes": 14492,
      "category": "case_document"
    },
    {
      "name": "420121020_Operator_Request_for_Hearing_and_Response_to_NOPV_PCO_12072012.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420121020/420121020_Operator_Request_for_Hearing_and_Response_to_NOPV_PCO_12072012.pdf",
      "bytes": 168404,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "TENNESSEE GAS PIPELINE COMPANY"
}
```