# SOUTHERN STAR CENTRAL GAS PIPELINE, INC — Warning Letter

**Citation:** CPF 420141007W  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2014-06-10

CLOSED warning letter citing 192.619(a).

## Document text

Warning Letter involving SOUTHERN STAR CENTRAL GAS PIPELINE, INC. PHMSA's enforcement data identifies the cited regulation as 192.619(a). The case was opened on 2014-06-10 and is reported as closed as of 2014-06-10. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420141007W_Warning Letter_06102014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420141007W/420141007W_Warning%20Letter_06102014.pdf

420141007W_Warning Letter_06102014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420141007W/420141007W_Warning%20Letter_06102014_text.pdf

420141007W_Warning Letter_06102014_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
June 10, 2014
Mr. Jerry Morris
President & CEO
Southern Star Central Gas Pipeline, Inc.
4700 Highway 56
Box 20010
Owensboro, KY 42301
CPF 4-2014-1007W
Dear Mr. Morris:
Between October 17, 2013 and April 30, 2014, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code
reviewed Safety Related Condition Report 2013-0111 submitted on October 2, 2013, by
Southern Star Central Pipeline, Inc. for a safety related incident that occurred in Kay County,
Oklahoma.
As a result of the review, it appears that you have committed a probable violation of the Pipeline
Safety Regulations, Title 49, Code of Federal Regulations. The item reviewed and the probable
violation is:
1. § 192.619 Maximum allowable operating pressure: Steel or plastic pipelines.
(a) No person may operate a segment of steel or plastic pipeline at a pressure that
exceeds a maximum allowable operating pressure determined under paragraph (c)
or (d) of this section ...



As indicated in your Safety Related Condition Report, Southern Star Central Gas Pipeline, Inc.
experienced an overpressure condition that met the reporting criteria for a safety related condition.
On October 2, 2013, a portion of the Blackwell Station (Line VN) was operated at a pressure that
exceeded the maximum allowable operating pressure (MAOP) for the line. The MAOP for the line
at the time of the event was reported as 719 psig. The MAOP, plus the allowable 10%, was exceeded
for approximately 18 minutes with maximum pressures recorded at 798 psig.
This event is reflected in the Safety Related Condition Report filed with PHMSA, as well as
other documentation provided in response to PHMSA requests during the course of our
investigation.
We have reviewed the circumstances and supporting documents involved in this case, and have
decided not to conduct additional enforcement action or penalty assessment proceedings at this
time.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 4-2014-1007W. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
Sincerely,
R. M. Seeley
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/420141007W>
- Source ID: `phmsa-enforcement`
- SHA-256: `efc82b4da9fa57faf007ba1bd643bd8e7d7058c0b62078d33996111b19ff7e34`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T10:07:32.124Z
- Document slug: `phmsa-enforcement-420141007w`

### Source metadata

```json
{
  "cpf": "420141007W",
  "operator": "SOUTHERN STAR CENTRAL GAS PIPELINE, INC",
  "region": "Southwest",
  "pipelineType": "GAS INTERSTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.619(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "420141007W_Warning Letter_06102014.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420141007W/420141007W_Warning%20Letter_06102014.pdf",
      "bytes": 30895,
      "category": "agency_document"
    },
    {
      "name": "420141007W_Warning Letter_06102014_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420141007W/420141007W_Warning%20Letter_06102014_text.pdf",
      "bytes": 6986,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "SOUTHERN STAR CENTRAL GAS PIPELINE, INC"
}
```