# KINETICA ENERGY EXPRESS LLC — Notice of Amendment

**Citation:** CPF 420161007M  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2016-07-18

CLOSED notice of amendment citing 192.617.

## Document text

Notice of Amendment involving KINETICA ENERGY EXPRESS LLC. PHMSA's enforcement data identifies the cited regulation as 192.617. The case was opened on 2016-07-18 and is reported as closed as of 2016-08-31. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420161007M_Closure Letter_08312016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420161007M/420161007M_Closure%20Letter_08312016.pdf

420161007M_Closure Letter_08312016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420161007M/420161007M_Closure%20Letter_08312016_text.pdf

420161007M_Notice of Amendment_07182016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420161007M/420161007M_Notice%20of%20Amendment_07182016.pdf

420161007M_Notice of Amendment_07182016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420161007M/420161007M_Notice%20of%20Amendment_07182016_text.pdf

420161007M_Operator Response to Notice_08012016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420161007M/420161007M_Operator%20Response%20to%20Notice_08012016.pdf

420161007M_Closure Letter_08312016_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
August 31, 2016
Ms. Diane Dundee
Chief Operations Officer
Kinetica Energy Express LLC
1001 McKinney St., Suite 900
Houston, TX 77002
CPF 4-2016-1007M
Dear Ms. Dundee:
Between February 1, 2016 and March 18, 2016, a representative from the Pipeline and
Hazardous Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United
States Code, conducted an on-site pipeline safety inspection of Kinetica Energy Express LLC
(Kinetica) procedures in Lake Charles, LA. As a result of the inspection, Kinetica was issued a
Notice of Amendment on July 18, 2016, which proposed amendment of your procedures.
Kinetica submitted its amended procedures on August 5 & 17, 2016. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
R. M. Seeley
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration

420161007M_Notice of Amendment_07182016_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
July 18, 2016
Ms. Diane Dundee
Chief Operations Officer
Kinetica Energy Express LLC
1001 McKinney St., Suite 900
Houston, TX 77002
CPF 4-2016-1007M
Dear Ms. Dundee:
Between February 1, 2016 and March 18, 2016, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected the written
operating and maintenance procedures and other pipeline records for Kinetica Energy Express, LLC
(Kinetica) in Lake Charles, LA .
On the basis of the inspection, PHMSA has identified the apparent inadequacy found within Kinetica’s
plans or procedures, as described below:
1. §192.617 Investigation of failures.
Each operator shall establish procedures for analyzing accidents and failures, including the
selection of samples of the failed facility or equipment for laboratory examination, where
appropriate, for the purpose of determining the causes of the failure and minimizing the
possibility of a recurrence.
Kinetica failed to complete the investigation of each failure to determine the cause and minimize the
possibility of recurrence in accordance with 192.617. Section 603 of their Operations & Maintenance
plan fails to provide an adequate procedure to complete the required investigations in a timely manner.
Kinetica first experienced a failure on 10/10/2013 and since then have reported nine failures in the next
years, all attributed to internal corrosion.



With 10 failures over the course of 2 ½ years , it appears Kinetica’s offshore assets are at an elevated
risk of failure due to internal corrosion emphasizing the importance of completing the failure analysis
and lessons learned to minimize the possibility of recurrence, following each incident.
Kinetica should revise its procedure Section 603(Item 9) in their Operations & Maintenance Manual
pertaining to incident investigations, to ensure failures and/or incident investigations are completed in a
timely manner. The revisions must include provisions for conducting investigations following each
failure, and must include direction to determine the cause of the failure and recommendations to
minimize the possibility of a recurrence.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed as part of
this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all material
you submit in response to this enforcement action is subject to being made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5 U.S.C.
552(b), along with the complete original document you must provide a second copy of the document
with the portions you believe qualify for confidential treatment redacted and an explanation of why you
believe the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b). If you do
not respond within 30 days of receipt of this Notice, this constitutes a waiver of your right to contest the
allegations in this Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as
alleged in this Notice without further notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in this Notice,
you may be ordered to amend your plans or procedures to correct the inadequacies (49 C.F.R. § 190.237).
If you are not contesting this Notice, we propose that you submit your amended procedures to my office
within 30 days of receipt of this Notice. This period may be extended by written request for good cause.
Once the inadequacies identified herein have been addressed in your amended procedures, this
enforcement action will be closed.
It is requested (not mandated) that Kinetica maintain documentation of the safety improvement costs
associated with fulfilling this Notice of Amendment (preparation/revision of plans, procedures) and
submit the total to R. M. Seeley, Director, Southwest Region, Pipeline and Hazardous Materials Safety
Administration. In correspondence concerning this matter, please refer to CPF 4-2016-1007M and, for
each document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
R. M. Seeley
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
2

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/420161007M>
- Source ID: `phmsa-enforcement`
- SHA-256: `780f0a731192b0c19b785f62f3d46d04dabab693e4b4318b6e77c5d5525cbb18`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T23:56:58.345Z
- Document slug: `phmsa-enforcement-420161007m`

### Source metadata

```json
{
  "cpf": "420161007M",
  "operator": "KINETICA ENERGY EXPRESS LLC",
  "region": "Southwest",
  "pipelineType": "GAS INTERSTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.617"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "420161007M_Closure Letter_08312016.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420161007M/420161007M_Closure%20Letter_08312016.pdf",
      "bytes": 15457,
      "category": "agency_document"
    },
    {
      "name": "420161007M_Closure Letter_08312016_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420161007M/420161007M_Closure%20Letter_08312016_text.pdf",
      "bytes": 67044,
      "category": "agency_document"
    },
    {
      "name": "420161007M_Notice of Amendment_07182016.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420161007M/420161007M_Notice%20of%20Amendment_07182016.pdf",
      "bytes": 869710,
      "category": "agency_document"
    },
    {
      "name": "420161007M_Notice of Amendment_07182016_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420161007M/420161007M_Notice%20of%20Amendment_07182016_text.pdf",
      "bytes": 87505,
      "category": "agency_document"
    },
    {
      "name": "420161007M_Operator Response to Notice_08012016.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420161007M/420161007M_Operator%20Response%20to%20Notice_08012016.pdf",
      "bytes": 84081,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "KINETICA ENERGY EXPRESS LLC"
}
```