# ENABLE GAS TRANSMISSION, LLC — Notice of Amendment

**Citation:** CPF 420161016M  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2016-12-20

CLOSED notice of amendment citing 191.25(a), 192.605(a), 192.907(a), 192.935(a), 192.935(b)(1)(iv), 192.935(d)(2).

## Document text

Notice of Amendment involving ENABLE GAS TRANSMISSION, LLC. PHMSA's enforcement data identifies the cited regulations as 191.25(a),  192.605(a),  192.907(a),  192.935(a),  192.935(b)(1)(iv),  192.935(d)(2). The case was opened on 2016-12-20 and is reported as closed as of 2017-03-30. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420161016M_Closure Letter_03302017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420161016M/420161016M_Closure%20Letter_03302017.pdf

420161016M_Closure Letter_03302017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420161016M/420161016M_Closure%20Letter_03302017_text.pdf

420161016M_Notice of Amendment_12202016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420161016M/420161016M_Notice%20of%20Amendment_12202016.pdf

420161016M_Notice of Amendment_12202016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420161016M/420161016M_Notice%20of%20Amendment_12202016_text.pdf

420161016M_Closure Letter_03302017_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
March 30, 2017
Mr. Paul M. Brewer
Executive Vice President of Operations
Enable Gas Transmission, LLC
211 North Robinson Avenue, Room 150
Oklahoma City, OK 73102
CPF 4-2016-1016M
Dear Mr. Brewer:
On February 2016 to October 2016, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected
Enable Gas Transmission, LLC (Enable) procedures for Operations and Maintenance, and
Integrity Management in Oklahoma City, Oklahoma.
As a result of the inspection, Enable was issued a Notice of Amendment (NOA) on December 20,
2016, which proposed amendment of your procedures.
Enable submitted its amended procedures on February 22, 2017. My staff reviewed the amended
procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been
corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
R. M. Seeley
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration

420161016M_Notice of Amendment_12202016_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
December 20, 2016
Mr. Pete Kirsch
Sr. VP-Pipelines Operations and Engineering
Enable Gas Transmission, LLC
211 North Robinson Avenue, Room 150
Oklahoma City, OK 73102
CPF 4-2016-1016M
Dear Mr. Kirsch:
On February 2016 to October 2016, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected
Enable Gas Transmission, LLC’s (Enable) procedures for Operations and Maintenance; and for
Integrity Management in Oklahoma City, OK.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
Enable’s plans or procedures, as described below:



1. §191.605 Procedural manual for operations, maintenance, and emergencies.
Each operator shall include the following in its operating and maintenance plan:
(a) General. Each operator shall prepare and follow for each pipeline, a manual of
written procedures for conducting operations and maintenance activities and for
emergency response. For transmission lines, the manual must also include
procedures for handling abnormal operations. This manual must be reviewed and
updated by the operator at intervals not exceeding 15 months, but at least one each
calendar year. This manual must be prepared before operations of a pipeline system
commence. Appropriate parts of the manual must be kept at locations where
operations and maintenance activities are conducted.
§191.25 Filing safety-related condition reports.
(a) Each report of a safety-related condition under §191.23(a) must be filed (received
by OPS within five working days, not including Saturday, Sunday, or Federal
Holidays) after the day a representative of the operator first determines that the
condition exists, but not later than 10 working days after the day a representative of
the operator discovers the condition. Separate conditions may be described in a single
report if they are closely related. Reports may be transmitted by electronic mail
to InformationResourcesManager@dot.gov or by facsimile at (202) 366-7128.
Enable’s Operating & Maintenance Plan, Procedure 108, Identifying and Reporting Safety Related
Conditions did not address when a SRCR fell within an HCA. When a SRCR falls within an HCA,
the Operator's procedures should address or reference procedures addressing the IMP requirements
for making repairs including the provision that when a reduction in operating pressure exceeds 365
days, the operator must notify PHMSA and explain the reasons for the remediation delay.
Enable also needs to define when discovery and determination dates are established. On several
occasions during the inspection, Enable would establish the discovery date when personnel went
to the field location and excavated, when in fact the discovery date was established when Enable
had enough information to categorize the anomaly as an immediate condition.
2



2. §192.907 What must an operator do to implement this subpart?
(a) General. No later than December 17, 2004, an operator of a covered pipeline
segment must develop and follow a written integrity management program that
contains all the elements described in § 192.911 and that addresses the risks on each
covered transmission pipeline segment. The initial integrity management program
must consist, at a minimum, of a framework that describes the process for
implementing each program element, how relevant decisions will be made and by
whom, a time line for completing the work to implement the program element, and
how information gained from experience will be continuously incorporated into the
program. The framework will evolve into a more detailed and comprehensive
program. An operator must make continual improvements to the program.
§192.935 take?
What additional preventive and mitigative measures must an operator
(a) General requirements. An operator must take additional measures beyond those
already required by Part 192 to prevent a pipeline failure and to mitigate the
consequences of a pipeline failure in a high consequence area. An operator must base
the additional measures on the threats the operator has identified to each pipeline
segment. (See §192.917) An operator must conduct, in accordance with one of the risk
assessment approaches in ASME/ANSI B31.8S (incorporated by reference, see
§192.7), section 5, a risk analysis of its pipeline to identify additional measures to
protect the high consequence area and enhance public safety. Such additional
measures include, but are not limited to, installing Automatic Shut-off Valves or
Remote Control Valves, installing computerized monitoring and leak detection
systems, replacing pipe segments with pipe of heavier wall thickness, providing
additional training to personnel on response procedures, conducting drills with local
emergency responders and implementing additional inspection and maintenance
programs.
Enable’s Integrity Management Program, PS-258 Preventive & Mitigative Measures procedure,
paraphrases regulation 192.935(a) and fails to consider other preventive or mitigative measures
not specifically referenced by §192.935 (a). PS-258 lacks details and does not give adequate
guidance.
3



3. §192.907 What must an operator do to implement this subpart?
(a) General. No later than December 17, 2004, an operator of a covered pipeline
segment must develop and follow a written integrity management program that
contains all the elements described in § 192.911 and that addresses the risks on each
covered transmission pipeline segment. The initial integrity management program
must consist, at a minimum, of a framework that describes the process for
implementing each program element, how relevant decisions will be made and by
whom, a time line for completing the work to implement the program element, and
how information gained from experience will be continuously incorporated into the
program. The framework will evolve into a more detailed and comprehensive
program. An operator must make continual improvements to the program.
§192.935 take?
What additional preventive and mitigative measures must an operator
(b) Third party damage and outside force damage-General. An operator must
document any change to its program and the reasons for the change before
implementing the change.
(1) Third party damage. An operator must enhance its damage prevention program,
as required under §192.614 of this part, with respect to a covered segment to prevent
and minimize the consequences of a release due to third party damage. Enhanced
measures to an existing damage prevention program include, at a minimum-
(iv) Monitoring of excavations conducted on covered pipeline segments by pipeline
personnel. If an operator finds physical evidence of encroachment involving
excavation that the operator did not monitor near a covered segment, an operator
must either excavate the area near the encroachment or conduct an above ground
survey using methods defined in NACE SP0502-2008 (incorporated by reference, see
§192.7). An operator must excavate, and remediate, in accordance with ANSI/ASME
B31.8S and §192.933 any indication of coating holidays or discontinuity warranting
direct examination.
Enable’s Integrity Management Program, PS-258 Preventive & Mitigative Measures procedure
does not require Enable to either excavate the area near the encroachment or conduct an above
ground survey when Enable finds physical evidence of encroachment involving excavation that
Enable did not monitor near a covered segment. This section lacks details to meet the requirements
in §192.935(b).
4



4. §192.907 What must an operator do to implement this subpart?
(a) General. No later than December 17, 2004, an operator of a covered pipeline
segment must develop and follow a written integrity management program that
contains all the elements described in § 192.911 and that addresses the risks on each
covered transmission pipeline segment. The initial integrity management program
must consist, at a minimum, of a framework that describes the process for
implementing each program element, how relevant decisions will be made and by
whom, a time line for completing the work to implement the program element, and
how information gained from experience will be continuously incorporated into the
program. The framework will evolve into a more detailed and comprehensive
program. An operator must make continual improvements to the program.
§192.935 take?
What additional preventive and mitigative measures must an operator
(d) Pipelines operating below 30% SMYS. An operator of a transmission pipeline
operating below 30% SMYS located in a high consequence area must follow the
requirements in paragraphs (d)(1) and (d)(2) of this section. An operator of a
transmission pipeline operating below 30% SMYS located in a Class 3 or Class 4 area
but not in a high consequence area must follow the requirements in paragraphs (d)(1),
(d)(2) and (d)(3) of this section.
(2) Either monitor excavations near the pipeline, or conduct patrols as required by
§192.705 of the pipeline at bi-monthly intervals. If an operator finds any indication of
unreported construction activity, the operator must conduct a follow up investigation
to determine if mechanical damage has occurred.
Enable’s Integrity Management Program, , PS-258 Preventive & Mitigative Measures, Section 4.4
Low Stress Pipelines does not require Enable to either monitor excavations near the pipeline, or
conduct patrols as required of the pipeline at bi-monthly intervals and if Enable finds any
indication of unreported construction activity, the Enable must conduct a follow up investigation
to determine if mechanical damage has occurred. This part of PS-258 also paraphrases the code
and lacks details.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b).
5



Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 30 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that Enable Gas Transmission, LLC maintain documentation of the
safety improvement costs associated with fulfilling this Notice of Amendment
(preparation/revision of plans, procedures) and submit the total to R.M. Seeley, Director,
Southwest Region, Pipeline and Hazardous Materials Safety Administration. In correspondence
concerning this matter, please refer to CPF 4-2016-1016M and, for each document you submit,
please provide a copy in electronic format whenever possible.
Sincerely,
R.M. Seeley
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
6

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/420161016M>
- Source ID: `phmsa-enforcement`
- SHA-256: `73d662c8d039fd4217fc600c696cc1505b3b4608057b77cd16e07386e5515fa8`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T21:54:18.203Z
- Document slug: `phmsa-enforcement-420161016m`

### Source metadata

```json
{
  "cpf": "420161016M",
  "operator": "ENABLE GAS TRANSMISSION, LLC",
  "region": "Southwest",
  "pipelineType": "GAS INTERSTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "191.25(a)",
    "192.605(a)",
    "192.907(a)",
    "192.935(a)",
    "192.935(b)(1)(iv)",
    "192.935(d)(2)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 4,
  "attachments": [
    {
      "name": "420161016M_Closure Letter_03302017.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420161016M/420161016M_Closure%20Letter_03302017.pdf",
      "bytes": 15285,
      "category": "agency_document"
    },
    {
      "name": "420161016M_Closure Letter_03302017_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420161016M/420161016M_Closure%20Letter_03302017_text.pdf",
      "bytes": 66607,
      "category": "agency_document"
    },
    {
      "name": "420161016M_Notice of Amendment_12202016.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420161016M/420161016M_Notice%20of%20Amendment_12202016.pdf",
      "bytes": 87870,
      "category": "agency_document"
    },
    {
      "name": "420161016M_Notice of Amendment_12202016_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420161016M/420161016M_Notice%20of%20Amendment_12202016_text.pdf",
      "bytes": 118553,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "ENABLE GAS TRANSMISSION, LLC"
}
```