# SUNOCO PIPELINE L.P. — Notice of Amendment

**Citation:** CPF 420165021M  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2016-06-02

CLOSED notice of amendment citing 195.402(c)(3), 195.432, 195.573(d), 195.577.

## Document text

Notice of Amendment involving SUNOCO PIPELINE L.P.. PHMSA's enforcement data identifies the cited regulations as 195.402(c)(3),  195.432,  195.573(d),  195.577. The case was opened on 2016-06-02 and is reported as closed as of 2017-02-27. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420165021M_Closure Letter_02272017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420165021M/420165021M_Closure%20Letter_02272017.pdf

420165021M_Closure Letter_02272017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420165021M/420165021M_Closure%20Letter_02272017_text.pdf

420165021M_Notice of Amendment_06022016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420165021M/420165021M_Notice%20of%20Amendment_06022016.pdf

420165021M_Notice of Amendment_06022016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420165021M/420165021M_Notice%20of%20Amendment_06022016_text.pdf

420165021M_Operator Response to Notice_07112016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420165021M/420165021M_Operator%20Response%20to%20Notice_07112016.pdf

420165021M_Closure Letter_02272017_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
February 27, 2017
Mr. David Chalson
Vice President of Operations
Sunoco Pipeline L.P.
4041 Market Street
Aston, PA 19014
CPF 4-2016-5021M
Dear Mr. Chalson:
On March 2014 to December 2014, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected
Sunoco Pipeline L.P. procedures for Operations and Maintenance Plan in Sugarland, Texas.
As a result of the inspection, Sunoco was issued a Notice of Amendment (NOA) on June 2, 2016,
which proposed amendment of your procedures.
Sunoco submitted its final amended procedures on February 13, 2017. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
R. M. Seeley
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration

420165021M_Notice of Amendment_06022016_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
June 2, 2016
Mr. David Chalson
Vice President of Operations
Sunoco Pipeline L.P.
4041 Market Street
Aston, PA 19014
CPF 4-2016-5021M
Dear Mr. Chalson:
On March 2014 to December 2014, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected
Sunoco Pipeline L.P. procedures for Operations and Maintenance, and Integrity Management in
Sugarland, Texas.
On the basis of the inspection, PHMSA has identified the apparent inadequacy found within
Sunoco’s plans or procedures, as described below:
1. §195.402 Procedural manual for operations, maintenance, and emergencies.
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.



§195.432 Inspection of in-service breakout tanks1
(a) Except for breakout tanks inspected under paragraphs (b) and (c) of this
section, each operator shall, at intervals not exceeding 15 months, but at least once
each calendar year, inspect each in-service breakout tank.
(b) Each operator must inspect the physical integrity of in-service atmospheric and
low-pressure steel aboveground breakout tanks according to API Standard 653
(incorporated by reference, see § 195.3). However, if structural conditions prevent
access to the tank bottom, the bottom integrity may be assessed according to a plan
included in the operations and maintenance manual under § 195.402(c)(3).
1 Since the time of this inspection, 49 C.F.R. § 195.432 was amended and took effect in March 2015. The current
regulation is cited below.
§195.432 Inspection of in-service breakout tanks.
(a) …
(b) Each operator must inspect the physical integrity of in-service atmospheric and low-pressure steel above-
ground breakout tanks according to API Std 653 (except section 6.4.3, Alternative Internal Inspection
Interval) (incorporated by reference, see §195.3). However, if structural conditions prevent access to the
tank bottom, its integrity may be assessed according to a plan included in the operations and maintenance
manual under §195.402(c)(3). The risk-based internal inspection procedures in API Std 653, section 6.4.3
cannot be used to determine the internal inspection interval.
(1) Operators who established internal inspection intervals based on risk-based inspection procedures prior
to March 6, 2015, must re-establish internal inspection intervals based on API Std 653, section 6.4.2
(incorporated by reference, see §195.3).
(i) If the internal inspection interval was determined by the prior risk-based inspection procedure using API
Std 653, section 6.4.3 and the resulting calculation exceeded 20 years, and it has been more than 20 years
since an internal inspection was performed, the operator must complete a new internal inspection in
accordance with §195.432(b)(1) by January 5, 2017.
(ii) If the internal inspection interval was determined by the prior risk-based inspection procedure using API
Std 653, section 6.4.3 and the resulting calculation was less than or equal to 20 years, and the time since the
most recent internal inspection exceeds the re-established inspection interval in accordance with
§195.432(b)(1), the operator must complete a new internal inspection by January 5, 2017.
(iii) If the internal inspection interval was not based upon current engineering and operational information
(i.e., actual corrosion rate of floor plates, actual remaining thickness of the floor plates, etc.), the operator
must complete a new internal inspection by January 5, 2017, and re-establish a new internal inspection
interval in accordance with §195.432(b)(1).
(2) [Reserved]
(c) Each operator must inspect the physical integrity of in-service steel aboveground breakout tanks built to
API Std 2510 (incorporated by reference, see §195.3) according to section 6 of API Std 510 (incorporated by
reference, see §195.3).
Section 195.432 does not allow the use of the procedures set forth in API Standard 653, section 6.4.3, Alternative
Internal Inspection Interval. Forthcoming inspections of the procedures will be based on the current regulation, cited
above.
2



(c) Each operator shall inspect the physical integrity of in-service steel aboveground
breakout tanks built to API Standard 2510 according to section 6 of API 510.
(d) The intervals of inspection specified by documents referenced in paragraphs (b)
and (c) of this section begin on May 3, 1999, or on the operator's last recorded date of
the inspection, whichever is earlier.
Sunoco’s DOT 195 Maintenance Manual Subpart F: Operation and Maintenance Section 195.432
Inspection of In-Service Breakout Tanks procedure does not adequately described the time
intervals for performing out of service internal inspections. Sunoco’s procedure only states the
out of service inspections shall be determined according to API 653 Section 6.4. Sunoco must
amend their procedure to describe in detail, and specify the time intervals for performing out of
service internal inspections and not just state they will follow API 653.
Sunoco’s procedure also does not adequately address §195.432(b) which states if structural
conditions prevent access to the tank bottom, the bottom integrity may be assessed according to a
plan included in the operations and maintenance manual under §195.402(c)(3). Sunoco needs to
address bottom integrity inspection plan for their tanks that have concrete liners. In the last five
years, Sunoco has needed to replace five floors on tanks that had concrete liners due to internal
and external corrosion on the steel bottoms. This demonstrates tanks with concrete liners are
susceptible to internal and external corrosion and need to have internal inspection intervals of 10
years.
2. §195.402 Procedural manual for operations, maintenance, and emergencies.
(c) (3) see above.
195.577 What must I do to alleviate interference currents.
(a) For pipelines exposed to stray currents, you must have a program to identify,
test for, and minimize the detrimental effects of such currents.
(b) You must design and install each impressed current or galvanic anode system to
minimize any adverse effects on existing adjacent metallic structures.
Sunoco’s 195 Maintenance Manual, Subpart H (Corrosion Control), Section 195.577 (Interference
Currents), revised on 10-31-2010 is inadequate that it does not establish a program to identify, test
for, and minimize the detrimental effects of stray currents. Sunoco’s 195 Maintenance Manual,
Subpart H (Corrosion Control), Section 195.577 (Interference Currents), Paragraph SPLP
Requirement / Process Description (3.b.) states:
“Unexpected and/or unusual variations in cathodic protection measurements encountered during
normal testing will be evaluated to determine whether these test results may be caused by stray
current interference. SPLP will work through corrosion coordinating committees or by direct
contact with area utilities or other pipeline operators to resolve whether interference may be the
3



cause of the unexpected and/or unusual test results and to resolve the stray current interference
condition, if it exists”.
According to the aforementioned paragraph, Sunoco did not clarify the “Unexpected and/or
unusual variations in cathodic protection measurements” in their manual. PHMSA notes that there
must be a numerical threshold of Unexpected and/or unusual variations in cathodic protection
measurements which triggers Sunoco to determine whether the cathodic protection measurements
encountered by stray currents or not.
Sunoco must revise its procedure to reflect the numerical value of Unexpected and/or unusual
variations in cathodic protection measurements.
3. 195.402 Procedural manual for operations, maintenance, and emergencies.
(c) (3) see above.
195.573 What must I do to monitor external corrosion control?
(c) Breakout tanks. You must inspect each cathodic protection system used to
control corrosion on the bottom of an aboveground breakout tank to ensure
that operation and maintenance of the system are in accordance with API
Recommended Practice 651. However, this inspection is not required if you
note in the corrosion control procedures established under § 195.402(c)(3) why
compliance with all or certain operation and maintenance provisions of API
Recommended Practice 651 is not necessary for the safety of the tank.
Sunoco’s 195 Maintenance Manual, Subpart H Corrosion Control, Section 195.573 Monitoring
External Corrosion Control, is inadequate and lacks detail to inspect each cathodic protection
system used to control corrosion on the bottom of an aboveground breakout tank to ensure that
operation and maintenance of the system are in accordance with API Recommended Practice 651.
The procedure also references the regulation and API 651 but does not give details and guidance
on inspecting and monitoring cathodic protection for breakout tanks.
Sunoco must revise its procedure to give better details and guidance on cathodic protection control
for breakout tanks.
4



Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b). If you do not respond within 30 days of receipt of this Notice,
this constitutes a waiver of your right to contest the allegations in this Notice and authorizes the
Associate Administrator for Pipeline Safety to find facts as alleged in this Notice without further
notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in this
Notice, you may be ordered to amend your plans or procedures to correct the inadequacies (49
C.F.R. § 190.237). If you are not contesting this Notice, we propose that you submit your amended
procedures to my office within 30 days of receipt of this Notice. This period may be extended by
written request for good cause. Once the inadequacies identified herein have been addressed in
your amended procedures, this enforcement action will be closed.
It is requested (not mandated) that Sunoco L.P. maintain documentation of the safety improvement
costs associated with fulfilling this Notice of Amendment (preparation/revision of plans,
procedures) and submit the total to R. M. Seeley, Director, Southwest Region, Pipeline and
Hazardous Materials Safety Administration. In correspondence concerning this matter, please
refer to CPF 4-2016-5021M and, for each document you submit, please provide a copy in
electronic format whenever possible.
Sincerely,
R. M. Seeley
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
5

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/420165021M>
- Source ID: `phmsa-enforcement`
- SHA-256: `39a8ae41723bc322399b47eb638d464fcd3e2b08ac0fcb8da6ade49d04b57d58`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T23:14:20.941Z
- Document slug: `phmsa-enforcement-420165021m`

### Source metadata

```json
{
  "cpf": "420165021M",
  "operator": "SUNOCO PIPELINE L.P.",
  "region": "Southwest",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.402(c)(3)",
    "195.432",
    "195.573(d)",
    "195.577"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "420165021M_Closure Letter_02272017.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420165021M/420165021M_Closure%20Letter_02272017.pdf",
      "bytes": 262046,
      "category": "agency_document"
    },
    {
      "name": "420165021M_Closure Letter_02272017_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420165021M/420165021M_Closure%20Letter_02272017_text.pdf",
      "bytes": 64218,
      "category": "agency_document"
    },
    {
      "name": "420165021M_Notice of Amendment_06022016.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420165021M/420165021M_Notice%20of%20Amendment_06022016.pdf",
      "bytes": 81846,
      "category": "agency_document"
    },
    {
      "name": "420165021M_Notice of Amendment_06022016_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420165021M/420165021M_Notice%20of%20Amendment_06022016_text.pdf",
      "bytes": 26010,
      "category": "agency_document"
    },
    {
      "name": "420165021M_Operator Response to Notice_07112016.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420165021M/420165021M_Operator%20Response%20to%20Notice_07112016.pdf",
      "bytes": 323049,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "SUNOCO PIPELINE L.P."
}
```