# KINDER MORGAN WINK PIPELINE LLC — Notice of Amendment

**Citation:** CPF 420165027M  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2016-08-03

CLOSED notice of amendment citing 195.402(a).

## Document text

Notice of Amendment involving KINDER MORGAN WINK PIPELINE LLC. PHMSA's enforcement data identifies the cited regulation as 195.402(a). The case was opened on 2016-08-03 and is reported as closed as of 2016-10-27. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420165027M_Closure Letter_10272016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420165027M/420165027M_Closure%20Letter_10272016.pdf

420165027M_Closure Letter_10272016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420165027M/420165027M_Closure%20Letter_10272016_text.pdf

420165027M_Notice of Amendment_08032016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420165027M/420165027M_Notice%20of%20Amendment_08032016.pdf

420165027M_Notice of Amendment_08032016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420165027M/420165027M_Notice%20of%20Amendment_08032016_text.pdf

420165027M_Operator Response to Notice and Request For Time Extension_09012016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420165027M/420165027M_Operator%20Response%20to%20Notice%20and%20Request%20For%20Time%20Extension_09012016.pdf

420165027M_Closure Letter_10272016_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
October 27, 2016
Mr. Charles Fox
Kinder Morgan - Wink Pipeline, LLC
500 Dallas, Suite 1000
Houston, TX 77002
CPF 4-2016-5027M
Dear Mr. Charles Fox:
On multiple occasions between October 6, 2014 and February 18, 2015, representatives from the
Pipeline and Hazardous Materials Safety Administration (PHMSA), pursuant to chapter 601 of
49 United States Code, conducted an on-site pipeline safety inspection of the Kinder Morgan -
Wink Pipeline, LLC (Wink) procedures in Wink, TX. As a result of the inspection, Wink was
issued a Notice of Amendment on August 3, 2016, which proposed amendment of your
procedures.
Wink submitted its amended procedures on October 18, 2016. My staff reviewed the amended
procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been
corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
R. M. Seeley
Director, SW Region
Pipeline and Hazardous Materials Safety Administration

420165027M_Notice of Amendment_08032016_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
August 3, 2016
Mr. Charles Fox
Kinder Morgan - Wink Pipeline LP
500 Dallas, Suite 1000
Houston, TX 77002
CPF 4-2016-5027M
Dear Charles Fox:
On multiple occasions between October 6, 2014 through February 18, 2015, representatives of
the Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety
(OPS), pursuant to Chapter 601 of 49 United States Code inspected the Kinder Morgan - Wink
(KM Wink) procedures for operations, maintenance, integrity management, and emergency
response in Wink, Texas.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within the
KM Wink plans or procedures, as described below:
1. § 195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a
manual of written procedures for conducting normal operations and
maintenance activities and handling abnormal operations and emergencies.
This manual shall be reviewed at intervals not exceeding 15 months, but at
least once each calendar year, and appropriate changes made as necessary to
insure that the manual is effective. This manual shall be prepared before initial
operations of a pipeline system commence, and appropriate parts shall be kept
at locations where operations and maintenance activities are conducted.



KM Wink procedures regarding repairs for internal metal loss/internal corrosion lack guidance or
limitation on the term ‘temporary’ with regard to the use of Type B sleeve repairs. KM Wink
installs Type B sleeves on internal metal loss anomalies as permanent repairs knowing that their
pipeline has a high internal corrosion threat.
As required by §195.402(c)(3), the procedures must be in accordance with subpart F and subpart
H of this part. The KM Liquid O&M Manual Procedure L-O&M 213 Leaks, Pipe and Weld
Defects (Evaluation and Repair) section 3.7.5 Internal Metal Loss states,
“The limitations for areas with internal metal loss and areas with
a combination of internal metal loss and external corrosion are the
same as for external corrosion (RSTRENG). When dealing with
internal metal loss, treat it as a manufacturing anomaly and not
considered a defect unless an internal corrosion threat has been
identified thru product conditions, unique NDE evaluations, ILI
pattern recognition or prior history. If internal corrosion is
identified, then repairs consistent with Table 1 are considered
temporary unless the internal corrosion has been successfully
mitigated, the pressure reduction as noted in Section 3.4 and
Section 3.7.2 apply.” (underlined for emphasis)
Table 1 in the procedure does not note the Type B sleeve repair as a temporary repair for internal
corrosion. The Type B sleeve is a permanent repair only if it can be proven the internal corrosion
has been mitigated. Internal corrosion is repaired using Type B sleeves, which are a temporary
repair technique. There is no guidance or limitation on the term “temporary” in the process. KM
installs Type B sleeves for all corrosion repairs, internal or external.
2. § 195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a
manual of written procedures for conducting normal operations and
maintenance activities and handling abnormal operations and emergencies.
This manual shall be reviewed at intervals not exceeding 15 months, but at least
once each calendar year, and appropriate changes made as necessary to insure
that the manual is effective. This manual shall be prepared before initial
operations of a pipeline system commence, and appropriate parts shall be kept
at locations where operations and maintenance activities are conducted.
KM Wink does not have procedures that provide the basis for quantifying and adjusting the
corrosion inhibitor injection rates within their pipeline systems. KM does not have a process or
procedure to give adequate direction for the monitoring of corrosion inhibitors.
Paragraph §195.579 directs an operator to things that must be done to mitigate internal corrosion.
KM Wink uses both corrosion inhibitor and corrosion coupons/probes in an attempt to monitor
and control internal corrosion in their pipeline system. KM Liquid O&M Manual Procedure L-
O&M 906 Internal Corrosion Control, section 3.3.2 Coupon/Probe Monitoring states,
2



“If corrosion inhibitors are added in the product service to
mitigate internal corrosion, it must be used in a sufficient quantity
to protect the pipeline and corrosion probes and/or coupons shall
be used to determine its effectiveness in mitigating internal
corrosion.”
In section 3.4 Remedial Action, it further states,
“Pitting of the coupon/probe is an indication of insufficient
inhibitor to protect the internal surface of the pipe. Indications of
insufficient inhibitor to protect the internal surface of the pipe may
be if inspections reveal internal corrosion in excess of 1 mpy, or if
the coupon/probe surface rust is greater than 50% of the surface
area for consecutive inspection periods. Corrective actions to
mitigate insufficient inhibitor protection include:
• Increasing dosage rate of inhibitor at injection points
• Increasing coupon inspection interval
• Investigating source point (refinery) product received into the
pipeline system
• Increase frequency of cleaning scrapers/pigs
The KM representative(s) responsible for internal corrosion
ensures that sufficient inhibitors are used to protect the assigned
segment of pipeline.”
The process that KM Wink uses for internal corrosion control makes no reference to
using/applying manufacturer’s suggested corrosion inhibitor injection rates. The KM process
shows no correlation between the coupon/probe corrosion rating and the adjustment of the
corrosion inhibitor injection rate.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies for
confidential treatment under 5 U.S.C. 552(b), along with the complete original document you
must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted information
qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not respond within 30 days
of receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue a Final Order.
3



If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in
this Notice, you may be ordered to amend your plans or procedures to correct the inadequacies
(49 C.F.R. § 190.237). If you are not contesting this Notice, we propose that you submit your
amended procedures to my office within 30 days of receipt of this Notice. This period may be
extended by written request for good cause. Once the inadequacies identified herein have been
addressed in your amended procedures, this enforcement action will be closed.
It is requested (not mandated) that Kinder Morgan - Wink Pipeline, LP maintain documentation
of the safety improvement costs associated with fulfilling this Notice of Amendment
(preparation/revision of plans, procedures) and submit the total to R. M. Seeley, Director, SW
Region, Pipeline and Hazardous Materials Safety Administration. In correspondence concerning
this matter, please refer to CPF 4-2016-5027M and, for each document you submit, please
provide a copy in electronic format whenever possible.
Sincerely,
R. M. Seeley
Director, SW Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
4

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/420165027M>
- Source ID: `phmsa-enforcement`
- SHA-256: `b932c3278c98ff0a8025f0a7784adb2668c45674963532efc437c97c2fd9d606`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-24T19:57:02.029Z
- Document slug: `phmsa-enforcement-420165027m`

### Source metadata

```json
{
  "cpf": "420165027M",
  "operator": "KINDER MORGAN WINK PIPELINE LLC",
  "region": "Southwest",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.402(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "420165027M_Closure Letter_10272016.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420165027M/420165027M_Closure%20Letter_10272016.pdf",
      "bytes": 18690,
      "category": "agency_document"
    },
    {
      "name": "420165027M_Closure Letter_10272016_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420165027M/420165027M_Closure%20Letter_10272016_text.pdf",
      "bytes": 66922,
      "category": "agency_document"
    },
    {
      "name": "420165027M_Notice of Amendment_08032016.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420165027M/420165027M_Notice%20of%20Amendment_08032016.pdf",
      "bytes": 83660,
      "category": "agency_document"
    },
    {
      "name": "420165027M_Notice of Amendment_08032016_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420165027M/420165027M_Notice%20of%20Amendment_08032016_text.pdf",
      "bytes": 107877,
      "category": "agency_document"
    },
    {
      "name": "420165027M_Operator Response to Notice and Request For Time Extension_09012016.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420165027M/420165027M_Operator%20Response%20to%20Notice%20and%20Request%20For%20Time%20Extension_09012016.pdf",
      "bytes": 930596,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "KINDER MORGAN WINK PIPELINE LLC"
}
```