Warning Letter involving ANR PIPELINE CO. PHMSA's enforcement data identifies the cited regulations as 191.22(c)(2)(iii),  191.22(c)(2)(iv). The case was opened on 2017-02-09 and is reported as closed as of 2017-02-09. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420171003W_Operator Response to Notice_05022017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420171003W/420171003W_Operator%20Response%20to%20Notice_05022017.pdf

420171003W_Warning Letter_02092017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420171003W/420171003W_Warning%20Letter_02092017.pdf

420171003W_Warning Letter_02092017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420171003W/420171003W_Warning%20Letter_02092017_text.pdf

420171003W_Warning Letter_02092017_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
February 9, 2017
Vern Meier
Vice President - Pipeline Safety & Compliance
ANR Pipeline Company
717 Texas Avenue
Houston, Texas 77002
CPF 4-2017-1003W
Dear Mr. Meier:
In December 2016, representatives of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code reviewed the
notification reports filed electronically by ANR Pipeline Company (ANR). As a result of this
review, it appears that you have committed a probable violation of the Pipeline Safety
Regulations, Title 49, Code of Federal Regulations. The item reviewed and the probable
violation is:
1. §191.22 National Registry of Pipeline and LNG Operators.
(c) Changes. Each operator must notify PHMSA electronically through the
National Registry of Pipeline and LNG Operators at http://opsweb.phmsa.dot.gov,
of certain events.
(2) An operator must notify PHMSA of any following event not later than 60
days after the event occurs:
(iii) A change in the entity (e.g., company, municipality) responsible
for an existing pipeline, pipeline segment, pipeline facility, or LNG facility;
(iv) The acquisition or divestiture of 50 or more miles of a pipeline or
pipeline system subject to Part 192 of this subchapter.



ANR failed to file notification of divestiture for 515.22 miles of gas transmission pipeline no
later than 60 days following the divestiture. ANR submitted an Operator Registry Notification
Type D for 515.22 miles of Onshore and Offshore OCS, Interstate pipeline, located in Saint
Mary and Cameron, LA. According to the information submitted, the divestiture was completed
on April 1, 2016, and the notification was not received until August 25, 2016 (144 days). This
notification was required by June 1, 2016.
Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed $205,638
per violation per day the violation persists up to a maximum of $2,056,380 for a related series of
violations. For violation occurring between January 4, 2012 to August 1, 2016, the maximum
penalty may not exceed $200,000 per violation per day, with a maximum penalty not to exceed
$2,000,000 for a related series of violations. For violations occurring prior to January 4, 2012,
the maximum penalty may not exceed $100,000 per violation per day, with a maximum penalty
not to exceed $1,000,000 for a related series of violations. We have reviewed the
circumstances and supporting documents involved in this case, and have decided not to conduct
additional enforcement action or penalty assessment proceedings at this time. We advise you to
correct the item identified in this letter. Failure to do so will result in ANR being subject to
additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 4-2017-1003W. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
Sincerely,
R. M. Seeley
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
2

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/420171003W>
- Source ID: `phmsa-enforcement`
- SHA-256: `74a81a098b26671df985d59d928b81915744d3536b0846b39b6de9274a25f952`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-24T18:05:31.114Z
- Document slug: `phmsa-enforcement-420171003w`

### Source metadata

```json
{
  "cpf": "420171003W",
  "operator": "ANR PIPELINE CO",
  "region": "Southwest",
  "pipelineType": "GAS INTERSTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "191.22(c)(2)(iii)",
    "191.22(c)(2)(iv)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 3,
  "attachments": [
    {
      "name": "420171003W_Operator Response to Notice_05022017.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420171003W/420171003W_Operator%20Response%20to%20Notice_05022017.pdf",
      "bytes": 32519,
      "category": "party_submission"
    },
    {
      "name": "420171003W_Warning Letter_02092017.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420171003W/420171003W_Warning%20Letter_02092017.pdf",
      "bytes": 34558,
      "category": "agency_document"
    },
    {
      "name": "420171003W_Warning Letter_02092017_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420171003W/420171003W_Warning%20Letter_02092017_text.pdf",
      "bytes": 88305,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "ANR PIPELINE CO"
}
```