# CORPUS CHRISTI LIQUEFACTION, LLC — Warning Letter

**Citation:** CPF 420173004W  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2017-04-10

CLOSED warning letter citing 193.2301.

## Document text

Warning Letter involving CORPUS CHRISTI LIQUEFACTION, LLC. PHMSA's enforcement data identifies the cited regulation as 193.2301. The case was opened on 2017-04-10 and is reported as closed as of 2017-04-10. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420173004W_Operator Response to Notice_06012017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420173004W/420173004W_Operator%20Response%20to%20Notice_06012017.pdf

420173004W_Warning Letter_04102017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420173004W/420173004W_Warning%20Letter_04102017.pdf

420173004W_Warning Letter_04102017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420173004W/420173004W_Warning%20Letter_04102017_text.pdf

420173004W_Warning Letter_04102017_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
April 10, 2017
Mr. Doug Shanda
Senior Vice President, Terminal Operations
Corpus Christi Liquefaction, LLC
700 Milam Street
Houston, TX 77002
CPF 4-2017-3004W
Dear Mr. Doug Shanda:
From January 3, 2017 to January 5, 2017, representatives of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected your
Corpus Christi Liquefaction (CCL) construction project in Corpus Christi, TX.
As a result of the inspection, it is alleged that you have committed a probable violation of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The item inspected and the
probable violation is:
1. §193.2301 Scope.
Each LNG facility constructed after March 31, 2000 must comply with requirements
of this part and of NFPA-59A-2001 (incorporated by reference see §193.2013). In the
event of a conflict between this part and NFPA 59A, this part prevails.
NFPA-59A-2001
6.3.4 Welding.
6.3.4.1 Qualification and performance of welders shall be in accordance with
Section 328.2 of ASME B 31.3, Process Piping, and 6.3.4.2 of this standard.
ASME B 31.3 Section 328.2



328.2 Welding and Brazing Qualification
Welding and brazing procedure specifications (WPSs and BPSs) to be
followed in production welding shall be prepared and qualified, and
welders, brazers, and operators shall be qualified as required by the ASME
BPV Code, Section IX except as modified by para. 333 for brazing of
Category D Fluid Service piping and by the following subparagraphs.
ASME BPV Code, Section IX
QW-301.2 Qualification Tests.
Each manufacturer or contractor shall qualify each welder or
welding operator for each welding process to be used in production
welding. The performance qualification test shall be welded in
accordance with qualified Welding Procedure Specification1
(WPS), or Standard Welding Procedure Specifications (SWPS)
listed in Appendix E, except that when performance qualification is
done in accordance with a WPS or SWPS that requires a preheat or
postweld heat treatment, these may be omitted.
QW-401.3 Supplementary Essential Variable2 (Procedure).
A change in a welding condition which will affect the notch-
toughness properties of a weldment (for example,
change in welding process, uphill or down vertical welding,
heat input, preheat or PWHT, etc.). Supplementary essential
variables are in addition to the essential variables for
each welding process.
QW-409 Electrical Characteristics
QW-409.1 An increase in heat input, or an increase in
volume of weld metal deposited per unit length of weld,
over that qualified. The increase may be determined by
either of the following:
(a) Heat input [J/in. (J/mm)]
= Voltage x Amperage x 60
Travel Speed [in./min (mm/min)]
1ASME BPV Code, Section IX Article QW200.1(a) defines a WPS to be a written qualified welding procedure
prepared to provide making production welds.
2ASME BPV Code, Section IX Article QW200.1(b) a completed WPS shall contain all of the essential, nonessential,
and, when required, supplementary essential variables for each welding process used in the WPS.
2



CCL failed to adequately conduct welder qualifications as required by ASME BPV Code, Section
IX, Article QW-301.2 Qualification Tests, incorporated by reference. The essential and
supplementary essential welding variables for gas tungsten arc welding are specified in Article
QW-256 of ASME BPV Code, Section IX3. Heat Input is a supplementary essential variable
specified by the WPS and described in paragraph QW-409.1 for the Operator to ensure that the
welder qualification tests were welding to the WPS heat input requirements, as mentioned. This
is accomplished using voltage, amperage, and the travel speed formula.
In order to confirm the welds had the correct heat input per the welding procedures, voltage and
travel speed must be taken during the welder testing process. On January 4, 2017, PHMSA
inspectors observed the inadequate inspection of the voltage and travel speed and requested a copy
of the testing records to confirm that heat input paramters were not inspected to ensure compliance.
On February 13, 2017, PHMSA received these records including the “Welder Qualification
Request” along with “Welder Performance Qualification Test Record (WR-1)” which confirmed
that supplementary essential variables were not inspected.
CCL failed to adequately conduct welder qualifications as required by ASME BPV Code, Section
IX, incorporated by reference. CCL did not ensure that the supplementary essential variable of
heat input was followed during the welder qualification process.
Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed $205,638
per violation per day the violation persists up to a maximum of $2,056,380 for a related series of
violations. For violation occurring between January 4, 2012 to August 1, 2016, the maximum
penalty may not exceed $200,000 per violation per day, with a maximum penalty not to exceed
$2,000,000 for a related series of violations. For violations occurring prior to January 4, 2012, the
maximum penalty may not exceed $100,000 per violation per day, with a maximum penalty not to
exceed $1,000,000 for a related series of violations. Also, for LNG facilities, an additional penalty
of not more than $50,000 for each violation may be imposed. We have reviewed the circumstances
and supporting documents involved in this case, and have decided not to conduct additional
enforcement action or penalty assessment proceedings at this time. We advise you to correct the
item(s) identified in this letter. Failure to do so will result in Corpus Christi Liquefaction, LLC
being subject to additional enforcement action.
3 Article QW-256 of ASME BPV Code, Section IX describes the welding variables procedure specificaitons for gas
tungsten arc welding. Heat input is a supplementary essential variable required in the welding procedure.3



No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 4-2017-3004W. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe the
redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
Sincerely,
R. M. Seeley
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
4

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/420173004W>
- Source ID: `phmsa-enforcement`
- SHA-256: `d102b1c92f6ff06207263ace06fddd222b0df137be5bdf2bc4fc3af2ab5c4ccc`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-24T21:05:14.316Z
- Document slug: `phmsa-enforcement-420173004w`

### Source metadata

```json
{
  "cpf": "420173004W",
  "operator": "CORPUS CHRISTI LIQUEFACTION, LLC",
  "region": "Southwest",
  "pipelineType": "INTERSTATE LNG ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "193.2301"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 3,
  "attachments": [
    {
      "name": "420173004W_Operator Response to Notice_06012017.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420173004W/420173004W_Operator%20Response%20to%20Notice_06012017.pdf",
      "bytes": 44944,
      "category": "party_submission"
    },
    {
      "name": "420173004W_Warning Letter_04102017.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420173004W/420173004W_Warning%20Letter_04102017.pdf",
      "bytes": 59119,
      "category": "agency_document"
    },
    {
      "name": "420173004W_Warning Letter_04102017_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420173004W/420173004W_Warning%20Letter_04102017_text.pdf",
      "bytes": 91328,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "CORPUS CHRISTI LIQUEFACTION, LLC"
}
```