CLOSED notice of probable violation citing 192.479(a).

## Document text

Notice of Probable Violation involving NATURAL GAS PIPELINE CO OF AMERICA (KMI). PHMSA's enforcement data identifies the cited regulation as 192.479(a). The case was opened on 2018-04-25 and is reported as closed as of 2018-11-30. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420181005_Closure Letter_11302018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420181005/420181005_Closure%20Letter_11302018.pdf

420181005_Closure Letter_11302018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420181005/420181005_Closure%20Letter_11302018_text.pdf

420181005_Final Order_09242018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420181005/420181005_Final%20Order_09242018.pdf

420181005_Final Order_09242018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420181005/420181005_Final%20Order_09242018_text.pdf

420181005_NOPV PCO_04252018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420181005/420181005_NOPV%20PCO_04252018.pdf

420181005_NOPV PCO_04252018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420181005/420181005_NOPV%20PCO_04252018_text.pdf

420181005_Operator Response to Notice_05102018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420181005/420181005_Operator%20Response%20to%20Notice_05102018.pdf

420181005_Closure Letter_11302018_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
November 30, 2018
Mr. Gary Buchler
Vice President, Operations and Engineering
Natural Gas Pipeline Company of America
1001 Louisiana Street, STE 1000
Houston, Texas 77002
CPF 4-2018-1005
Dear Mr. Buchler:
On September 24, 2018, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Natural Gas Pipeline Company of America (NGPL), a Final Order in the above-
referenced case. This Order included a Compliance Order. PHMSA office received NGPL’s
response of the Compliance Order on November 07, 2018. Based on our review of the
documentation you provided, it has been determined that you have complied with the terms of this
order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Office of Pipeline and Hazardous Materials Safety Administration

420181005_Final Order_09242018_text.pdf

September 24, 2018
Mr. Steven J. Kean
President and Chief Executive Officer
Kinder Morgan, Inc.
1001 Louisiana Street
Houston, TX 77002
Re: CPF No. 4-2018-1005
Dear Mr. Kean:
Enclosed please find the Final Order issued in the above-referenced case to Natural Gas Pipeline
Company of America, LLC (NGPL), a joint venture of Kinder Morgan, Inc., and Brookfield
Infrastructure Partners LP, that is operated by Kinder Morgan. It makes one finding of violation
and specifies actions that need to be taken by NGPL to comply with the pipeline safety
regulations. When the terms of the compliance order have been completed, as determined by the
Director, Southwest Region, this enforcement action will be closed. Service of the Final Order
by certified mail is effective as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure
cc: Ms. Mary McDaniel, Director, Southwest Region, Office of Pipeline Safety, PHMSA
Mr. Kenneth W. Grubb, Chief Operating Officer Gas Pipelines, Kinder Morgan, Inc.
Mr. Samuel P. S. Pollock, Chief Executive Officer, Brookfield Infrastructure Partners, Ltd.,
Suite 300, 181 Bay Street, Toronto, Ontario, Canada
CERTIFIED MAIL - RETURN RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________________
In the Matter of )
)
)
Natural Gas Pipeline Company of America, LLC, a joint venture of Kinder Morgan, Inc., and )
Brookfield Infrastructure Partners, LP, )
)
Respondent. )
____________________________________________)
) CPF No. 4-2018-1005
FINAL ORDER
On multiple dates between September 19, 2017, and February 7, 2018, pursuant to 49 U.S.C.
§ 60117, representatives of the Pipeline and Hazardous Materials Safety Administration
(PHMSA), Office of Pipeline Safety (OPS), conducted an on-site pipeline safety inspection of
the facilities and records of Natural Gas Pipeline Company of America, LLC (NGPL or
Respondent), in Texas, Arkansas, and Louisiana. The system consists of approximately 2,809
miles of interstate gas transmission pipelines that extend from Texas to Arkansas, with branches
in Oklahoma and Louisiana.1 NGPL is jointly owned by Kinder Morgan, Inc. (Kinder Morgan),
and Brookfield Infrastructure Partners LP, and operated by Kinder Morgan.2
As a result of the inspection, the Director, Southwest Region, OPS (Director), issued to
Respondent, by letter dated April 25, 2018, a Notice of Probable Violation and Proposed
Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the Notice proposed
finding that NGPL had violated 49 C.F.R. § 192.479(a), and proposed ordering Respondent to
take certain measures to correct the alleged violation.
NGPL responded to the Notice by letter dated May 10, 2018 (Response). The company did not
contest the allegation of violation and agreed to complete the proposed compliance actions.
Respondent did not request a hearing and therefore has waived its right to one.
FINDING OF VIOLATION
In its Response, NGPL did not contest the allegation in the Notice that it violated 49 C.F.R. Part
192, as follows:
1 Pipeline Safety Violation Report (Violation Report), (April 20, 2018) (on file with PHMSA), at 1.
2 NGPL website, available at
https://www.kindermorgan.com/pages/business/gas pipelines/central/NGPL/default.aspx (last accessed July 12,
2018).



CPF No. 4-2018-1005
Page 2
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 192.479(a), which states:
§ 192.479 Atmospheric corrosion control: General.
(a) Each operator must clean and coat each pipeline or portions of
pipeline that is exposed to the atmosphere, except pipelines under paragraph
(c) of this section.
The Notice alleged that Respondent violated 49 C.F.R. § 192.479(a) by failing to clean and coat
each pipeline or portions of pipeline that is exposed to the atmosphere. Specifically, the Notice
alleged that NGPL failed to clean or coat certain pipe segments in 2014, 2015, and 2016. NGPL
provided PHMSA with photographs dated May 2017, indicating atmospheric corrosion
conditions at the following locations:
 Division 05, Louisiana Mainline #1 - 30"
o Milepost: 4649+85, Texaco High Island side tap BMT-235. Launch at
Centanna Site off Highway 87 (Gar 018)
o Milepost: 4728+55, Mainline Valve L-5W (Gar 019)
 Division 05, Louisiana Mainline #2 - 30"
o Milepost: 4259+02, Cross-over West Side Intracoastal Canal (Gar 092)
o Milepost: 4649+61, Mobil High Island Side Tap BMT-235.
These segments were marked “poor” in the company’s Atmospheric Inspection Records.
The Notice alleged that NGPL's own written procedures set forth requirements for the inspection
and remediation of atmospheric corrosion. Specifically, it alleged that Kinder Morgan’s O&M
Procedure 918, Inspecting for Atmospheric Corrosion, Section 3.3, Remedial Repairs, stated:
If corrosion is found on the surface of pressure piping, refer to O&M
Procedure 915 - Maximum Corrosion Limits and MAOP of Corroded Pipe
to determine if piping should be repaired, replaced, or recoated. Corrosion
on bolt heads, nuts and threads that could compromise their integrity, must
be evaluated to determine if the bolts and nuts should be replaced or
recoated. Complete all required recoating prior to the next required
inspection.
According to the Notice, when PHMSA questioned NGPL about the repair status of these
segments, the operator stated remediation of the facilities was scheduled in 2016, 2017, and
again in 2018 to address the atmospheric corrosion. However, remediation had not been
performed at the time of the PHMSA inspection. The PHMSA inspector verified with the
operator that no action had been taken as of February 2018 to stop active corrosion and metal
loss on the identified segment.
Respondent did not contest this allegation of violation. Accordingly, based upon a review of all
of the evidence, I find that Respondent violated 49 C.F.R. § 192.479(a) by failing to clean and
coat each pipeline or portions of pipeline that is exposed to the atmosphere.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.



CPF No. 4-2018-1005
Page 3
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Item 1 in the Notice for violation of
49 C.F.R. § 192.479(a). Under 49 U.S.C. § 60118(a), each person who engages in the
transportation of gas or who owns or operates a pipeline facility is required to comply with the
applicable safety standards established under chapter 601. Pursuant to the authority of 49 U.S.C.
§ 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the following actions to
ensure compliance with the pipeline safety regulations applicable to its operations:
1. With respect to the violation of § 192.479(a) (Item 1), Respondent must perform
remedial repairs on the above-ground segments on Louisiana Mainline #1 and #2
determined to be in poor condition in accordance with 49 CFR Part 192 and NGPL
procedures, specifically, Kinder Morgan’s O&M Procedure 918, Section 3.3; and
2. Complete Compliance Order Item 1 within 45 days following receipt of the Final
Order.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent and demonstrating good cause for an
extension.
It is requested that Respondent maintain documentation of the safety improvement costs
associated with fulfilling this Compliance Order and submit the total to the Director. It is
requested that these costs be reported in two categories: (1) total cost associated with
preparation/revision of plans, procedures, studies and analyses; and (2) total cost associated with
replacements, additions and other changes to pipeline infrastructure.
Failure to comply with this Order may result in the administrative assessment of civil penalties
not to exceed $200,000, as adjusted for inflation (49 C.F.R. § 190.223), for each violation for
each day the violation continues or in referral to the Attorney General for appropriate relief in a
district court of the United States.
Under 49 C.F.R. § 190.243, Respondent may submit a Petition for Reconsideration of this Final
Order to the Associate Administrator, Office of Pipeline Safety, PHMSA, 1200 New Jersey
Avenue, SE, East Building, 2nd Floor, Washington, DC 20590, with a copy sent to the Office of
Chief Counsel, PHMSA, at the same address, no later than 20 days after receipt of service of this
Final Order by Respondent. Any petition submitted must contain a statement of the issue(s) and
meet all other requirements of 49 C.F.R. § 190.243. The terms of the order, including corrective
action, remain in effect unless the Associate Administrator, upon request, grants a stay. The
terms and conditions of this Final Order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
September 24, 2018
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/420181005>
- Source ID: `phmsa-enforcement`
- SHA-256: `3c09758f62201515bd3eae5b65a9ce62468201f6818b3de592a833990f45b10a`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T21:57:31.770Z
- Document slug: `phmsa-enforcement-420181005`

### Source metadata

```json
{
  "cpf": "420181005",
  "operator": "NATURAL GAS PIPELINE CO OF AMERICA (KMI)",
  "region": "Southwest",
  "pipelineType": "GAS INTERSTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.479(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 7,
  "attachments": [
    {
      "name": "420181005_Closure Letter_11302018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420181005/420181005_Closure%20Letter_11302018.pdf",
      "bytes": 17498,
      "category": "agency_document"
    },
    {
      "name": "420181005_Closure Letter_11302018_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420181005/420181005_Closure%20Letter_11302018_text.pdf",
      "bytes": 79008,
      "category": "agency_document"
    },
    {
      "name": "420181005_Final Order_09242018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420181005/420181005_Final%20Order_09242018.pdf",
      "bytes": 1072781,
      "category": "agency_document"
    },
    {
      "name": "420181005_Final Order_09242018_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420181005/420181005_Final%20Order_09242018_text.pdf",
      "bytes": 453300,
      "category": "agency_document"
    },
    {
      "name": "420181005_NOPV PCO_04252018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420181005/420181005_NOPV%20PCO_04252018.pdf",
      "bytes": 88590,
      "category": "case_document"
    },
    {
      "name": "420181005_NOPV PCO_04252018_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420181005/420181005_NOPV%20PCO_04252018_text.pdf",
      "bytes": 117219,
      "category": "case_document"
    },
    {
      "name": "420181005_Operator Response to Notice_05102018.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420181005/420181005_Operator%20Response%20to%20Notice_05102018.pdf",
      "bytes": 28329,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "NATURAL GAS PIPELINE CO OF AMERICA (KMI)"
}
```