# FREEPORT LNG DEVELOPMENT, L.P. — Notice of Probable Violation

**Citation:** CPF 420193003  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2019-09-11

CLOSED notice of probable violation citing 193.2017(a), 193.2639(b).

## Document text

Notice of Probable Violation involving FREEPORT LNG DEVELOPMENT, L.P.. PHMSA's enforcement data identifies the cited regulations as 193.2017(a),  193.2639(b). The case was opened on 2019-09-11 and is reported as closed as of 2020-05-06. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420193003_ Operator Response to Notice_10032019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420193003/420193003_%20Operator%20Response%20to%20Notice_10032019.pdf

420193003_Closure Letter_05062020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420193003/420193003_Closure%20Letter_05062020.pdf

420193003_Closure Letter_05062020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420193003/420193003_Closure%20Letter_05062020_text.pdf

420193003_Final Order_01142020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420193003/420193003_Final%20Order_01142020.pdf

420193003_Final Order_01142020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420193003/420193003_Final%20Order_01142020_text.pdf

420193003_NOPV PCO_09112019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420193003/420193003_NOPV%20PCO_09112019.pdf

420193003_NOPV PCO_09112019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420193003/420193003_NOPV%20PCO_09112019_text.pdf

420193003_Closure Letter_05062020_text.pdf

ELECTRONIC MAIL- RETURN RECEIPT REQUESTED
May 6, 2020
Michael S. Smith
Chairman and Chief Executive Officer
Freeport LNG Development, LP
333 Clay Street, Suite 5050
Houston, Texas 77002
CPF 4-2019-3003
Dear Mr. Smith:
On January 14, 2020, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Freeport LNG Development, L.P. (FLNG) a Final Order in the above-referenced case.
This Order included a Compliance Order. Based on our review of the documentation you
provided, it has been determined that you have complied with the terms of this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
Cc: Mark Mallett, Vice President of Operations and Engineering, Freeport LNG
Development

420193003_Final Order_01142020_text.pdf

January 14, 2020
Mr. Michael S. Smith
Chairman and Chief Executive Officer
Freeport LNG Development, LP
333 Clay Street, Suite 5050
Houston, Texas 77002
Re: CPF No. 4-2019-3003
Dear Mr. Smith:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and specifies actions that need to be taken to comply with the pipeline safety
regulations. When the terms of the compliance order are completed, as determined by the
Director, Southwest Region, this enforcement action will be closed. Service of the Final Order
by certified mail is effective upon the date of mailing, as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Ms. Mary L. McDaniel, Director, Southwest Region, Office of Pipeline Safety, PHMSA
Mr. Mark W. Mallett, Senior Vice President, Operations and Projects, Freeport LNG
Development, LP
CERTIFIED MAIL - RETURN RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Freeport LNG Development, LP, ) CPF No. 4-2019-3003
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On September 11, 2019, pursuant to 49 C.F.R. § 190.207, the Director, Southwest Region,
Office of Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Freeport LNG
Development, LP (Respondent). The Notice proposed finding that Respondent had violated the
pipeline safety regulations in 49 C.F.R. Part 193, proposed certain measures to correct the
violation, and also included a warning item. Respondent did not contest the allegation of
violation or corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 193.2017 (Item 1) ─ Respondent failed to establish and maintain
written procedures for four separate tasks required by Part 193.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violation. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of ordered actions, Respondent may request that the Director close the case. Failure to comply
with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223 or in
referral to the Attorney General for appropriate relief in a district court of the United States.
The Notice also alleged another probable violation of Part 193, but did not propose a civil
penalty or compliance order for this item. Therefore, this item is considered to be a warning
item. The warning was for 49 C.F.R. § 193.2639(b), Respondent’s alleged failure to maintain



CPF No. 4-2019-3003
Page 2
records that show the location of cathodically-protected components, neighboring structures
bonded to the cathodic-protection system, and corrosion protection equipment.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
January 14, 2020
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/420193003>
- Source ID: `phmsa-enforcement`
- SHA-256: `f3b5cd003f0047da480ab977542373a969c1587d61b8d0ab42703255f2aa4103`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T16:45:48.050Z
- Document slug: `phmsa-enforcement-420193003`

### Source metadata

```json
{
  "cpf": "420193003",
  "operator": "FREEPORT LNG DEVELOPMENT, L.P.",
  "region": "Southwest",
  "pipelineType": "INTERSTATE LNG ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "193.2017(a)",
    "193.2639(b)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 7,
  "attachments": [
    {
      "name": "420193003_ Operator Response to Notice_10032019.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420193003/420193003_%20Operator%20Response%20to%20Notice_10032019.pdf",
      "bytes": 322536,
      "category": "party_submission"
    },
    {
      "name": "420193003_Closure Letter_05062020.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420193003/420193003_Closure%20Letter_05062020.pdf",
      "bytes": 232456,
      "category": "agency_document"
    },
    {
      "name": "420193003_Closure Letter_05062020_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420193003/420193003_Closure%20Letter_05062020_text.pdf",
      "bytes": 68329,
      "category": "agency_document"
    },
    {
      "name": "420193003_Final Order_01142020.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420193003/420193003_Final%20Order_01142020.pdf",
      "bytes": 816996,
      "category": "agency_document"
    },
    {
      "name": "420193003_Final Order_01142020_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420193003/420193003_Final%20Order_01142020_text.pdf",
      "bytes": 116272,
      "category": "agency_document"
    },
    {
      "name": "420193003_NOPV PCO_09112019.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420193003/420193003_NOPV%20PCO_09112019.pdf",
      "bytes": 120934,
      "category": "case_document"
    },
    {
      "name": "420193003_NOPV PCO_09112019_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420193003/420193003_NOPV%20PCO_09112019_text.pdf",
      "bytes": 142074,
      "category": "case_document"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "FREEPORT LNG DEVELOPMENT, L.P."
}
```