# ENERGY TRANSFER COMPANY — Notice of Probable Violation

**Citation:** CPF 420195016  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2019-08-12

CLOSED notice of probable violation citing 195.402(a), 195.452(b)(1), 195.452(b)(5), 195.452(j)(1), 195.452(l)(1)(ii), 195.583(a).

## Document text

Notice of Probable Violation involving ENERGY TRANSFER COMPANY. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.452(b)(1),  195.452(b)(5),  195.452(j)(1),  195.452(l)(1)(ii),  195.583(a). The case was opened on 2019-08-12 and is reported as closed as of 2020-09-09. Proposed civil penalty: $73,600. Assessed civil penalty: $73,600. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420195016_Closure Letter_09092020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420195016/420195016_Closure%20Letter_09092020.pdf

420195016_Closure Letter_09092020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420195016/420195016_Closure%20Letter_09092020_text.pdf

420195016_Final Order_01142020.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420195016/420195016_Final%20Order_01142020.pdf

420195016_Final Order_01142020_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420195016/420195016_Final%20Order_01142020_text.pdf

420195016_NOPV PCP PCO_08122019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420195016/420195016_NOPV%20PCP%20PCO_08122019.pdf

420195016_NOPV PCP PCO_08122019_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420195016/420195016_NOPV%20PCP%20PCO_08122019_text.pdf

420195016_Operator Response to Notice_ 09132019.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420195016/420195016_Operator%20Response%20to%20Notice_%2009132019.pdf

420195016_Final Order_01142020_text.pdf

January 14, 2020
Mr. Kelcy L. Warren
Chief Executive Officer
Energy Transfer, LP
8111 Westchester Drive
Dallas, Texas 75225
Re: CPF No. 4-2019-5016
Dear Mr. Warren:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation, finds that the civil penalty amount of $73,600 has been paid in full, and specifies
actions that need to be taken by Lone Star NGL, LLC, a subsidiary of Energy Transfer, LP, to
comply with the pipeline safety regulations. When the terms of the compliance order are
completed, as determined by the Director, Southwest Region, this enforcement action will be
closed. Service of the Final Order by certified mail is effective upon the date of mailing as
provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Ms. Mary McDaniel, Director, Southwest Region, Office of Pipeline Safety, PHMSA
Mr. Eric Amundsen, Senior Vice President – Operations, Energy Transfer, LP
Mr. Mark Milliken, Vice President – Technical Services, Energy Transfer, LP
Mr. Danny Nichols, Senior Director – Regulatory Compliance, Energy Transfer, LP
Mr. Chris Lason, Vice President – Asset Integrity, Energy Transfer, LP
Mr. Delyn Houder, Senior Manager – Corrosion Services, Energy Transfer, LP
Mr. Todd Nardozzi, Senior Manager – Regulatory Compliance, Energy Transfer, LP
CERTIFIED MAIL - RETURN RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Lone Star NGL, LLC, ) CPF No. 4-2019-5016
a subsidiary of Energy Transfer, LP, )
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On August 12, 2019, pursuant to 49 C.F.R. § 190.207, the Director, Southwest Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Lone Star NGL, LLC
(Respondent). The Notice proposed finding that Respondent had violated the pipeline safety
regulations in 49 C.F.R. Part 195 and proposed a civil penalty of $73,600. The Notice also
proposed certain measures to correct the violations. Respondent did not contest the allegations
of violation or corrective measures, and paid the proposed civil penalty on September 30, 2019.
In accordance with § 190.208(a)(1), such payment authorizes the entry of this final order.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 195.402(a) (Item 1) ─ Respondent failed to follow for each pipeline
system a manual of written procedures for conducting normal operations and
maintenance activities by failing to properly document atmospheric corrosion
inspections;
49 C.F.R. § 195.452(b)(5) (Item 2) ─ Respondent failed to implement and follow
its Integrity Management Plan (IMP) by failing to conduct periodic evaluations to
assure pipeline integrity pursuant to its IMP and § 195.452(j); and
49 C.F.R. § 195.452(l) (Item 5) ─ Respondent failed to maintain, for the useful
life of the pipeline, documents to support the decisions and analyses regarding
Emergency Flow Restricting Device installation(s) on the segments that could
affect a high consequence area and records regarding risk analyses.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent. In accordance with 49 C.F.R. § 190.223, Respondent is



CPF No. 4-2019-5016
Page 2
assessed the proposed civil penalty amount of $73,600, which Respondent has already paid in
full.
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violations. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of ordered actions, Respondent may request that the Director close the case. Failure to comply
with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223 or in
referral to the Attorney General for appropriate relief in a district court of the United States.
With respect to Items 3, 4, and 6, the Notice alleged a probable violation of Part 195 but did not
propose a civil penalty or compliance order for these items. Therefore, these are considered to
be warning items. The warnings were for:
49 C.F.R. § 195.452(b)(5) (Item 3) ─ Respondent’s alleged failure to implement
and follow its written IMP regarding reassessment intervals;
49 C.F.R. § 195.452(b)(5) (Item 4) ─ Respondent’s alleged failure to implement
and follow its written IMP regarding annual evaluations of its program; and
49 C.F.R. § 195.583(a) (Item 6) ─ Respondent’s alleged failure to inspect each
onshore pipeline or portion of onshore pipeline that is exposed to the atmosphere
for evidence of atmospheric corrosion at least once every three calendar years, but
with intervals not exceeding 39 months.
If OPS finds a violation of these provisions in a subsequent inspection, Respondent may be
subject to future enforcement action.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
January 14, 2020
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

420195016_Closure Letter_09092020_text.pdf

ELECTRONIC MAIL - RETURN RECEIPT REQUESTED
September 9, 2020
Kelcy L. Warren
Chief Executive Officer
Energy Transfer, LP
8111 Westchester Drive
Dallas, Texas 75225
CPF 4-2019-5016
Dear Mr. Warren:
On January 14, 2020, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Energy Transfer L.P. a Final Order in the above-referenced case. This Order included a
Civil Penalty assessment and a Compliance Order with requirements to review your HLD 44
procedures, retrain the technicians on changes and its requirements, and to conduct an EFRD
study. Based on our review of the documentation provided and confirmation of payment of the
Civil Penalty, it has been determined that you have complied with the terms of this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
Cc: Todd Nardozzi, Director – Regulatory Compliance, Energy Transfer Partners

420195016_NOPV PCP PCO_08122019_text.pdf

NOTICE OF PROBABLE VIOLATION
PROPOSED CIVIL PENALTY
and
PROPOSED COMPLIANCE ORDER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
August 12, 2019
Eric Amundsen
Senior Vice President Operations
Energy Transfer Company
1300 Main Street
Houston, Texas 77002
CPF 4-2019-5016
Dear Mr. Amundsen:
On April 2, 2018 through October 29, 2018, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter
601 of 49 United States Code inspected Energy Transfer Company’s (Energy Transfer) Lone Star
NGL – East and West pipeline system (Gateway Justice Pipeline) in Houston, Abilene, Victoria,
and Midland, Texas.
As a result of the inspection, it is alleged that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items inspected
and the probable violations are:



1. §195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a
manual of written procedures for conducting normal operations and maintenance
activities and handling abnormal operations and emergencies. This manual shall
be reviewed at intervals not exceeding 15 months, but at least once each calendar
year, and appropriate changes made as necessary to insure that the manual is
effective. This manual shall be prepared before initial operations of a pipeline
system commence, and appropriate parts shall be kept at locations where
operations and maintenance activities are conducted.
Energy Transfer failed to follow for each pipeline system a manual of written procedures
for conducting normal operations and maintenance activities and handling abnormal
operations and emergencies. Specifically, it failed to follow section 7.3 of its written
procedure, HLD.44 for Atmospheric Corrosion Inspection which requires the inclusion of
certain additional details in the inspection records.
The procedure (HLD.44) requires that coating conditions be ranked (as either good, fair,
poor, or bare) as part of the evaluation carried out during the inspection, with section 7.4
requiring that the evaluations be documented. Work order numbers 629055, 1602951,
399997, and 1535422 do not document evaluation results or rankings of the coating
conditions. Also, the inspection reports for the segments between Highway 87 and Jackson
plant, SE Hull to Odell extension and Odell to Mont Belvieu pump stations 1-5 did not
include coating condition rankings or evaluation of the results as required.
2. §195.452 – Pipeline integrity management in high consequence areas.
(b) What program and practices must operators use to manage pipeline integrity?
Each operator of a pipeline covered by this section must:
(1) Develop a written integrity management program that addresses the risks on each
segment of pipeline in the first column of the following table not later than the
date in the second column:
(5) Implement and follow the program.
(j) What is a continual process of evaluation and assessment to maintain a pipeline's
integrity?
(1) General. After completing the baseline integrity assessment, an operator must
continue to assess the line pipe at specified intervals and periodically evaluate the
integrity of each pipeline segment that could affect a high consequence area.
2



3. Energy Transfer failed to follow its procedures for managing pipeline integrity by not
periodically evaluating the integrity of each pipeline segment that could affect a high
consequence area. Specifically, Energy Transfer failed to follow section 7 of its written
Integrity Management Plan requiring that periodic evaluations be carried out at intervals
not exceeding 15 months. Following the 2017 assessments, the periodic evaluation record
prepared for the PS5 to PS6 16” segment was reviewed. Records showing periodic
evaluations carried out for 2013, 2014 and 2015 were unavailable for review and not
subsequently provided. The other five (5) segments on the Gateway and Justice systems
assessed in 2017 did not have evaluation records either. Energy Transfer, therefore, failed
to conduct periodic evaluations on segments of the Gateway and Justice system as required
under its procedures and pipeline safety regulation in §195.452 (j)(2).
§195.452 – Pipeline integrity management in high consequence areas.
(b) What program and practices must operators use to manage pipeline
integrity? Each operator of a pipeline covered by this section must:
(1) Develop a written integrity management program that addresses the risks on each
segment of pipeline in the first column of the following table not later than the date
in the second column:
(5) Implement and follow the program.
Energy Transfer failed to follow section 7.0 of the Integrity Management Plan requiring
the re-assessment of the pipeline segments that affect a high consequence area at intervals
not to exceed 5 years. The Monument Junction to WT2 and WT2 to Halley Junction
segments were initially assessed on October 5, 2012 and the subsequent reassessments did
not happen until April 27, 2018 and May 16, 2018, for the respective segments. The
reassessments exceeded the 5 year duration by 6 to 8 months.
3



4. 5. §195.452 – Pipeline integrity management in high consequence areas.
(b) What program and practices must operators use to manage pipeline integrity?
Each operator of a pipeline covered by this section must:
(1) Develop a written integrity management program that addresses the risks on each
segment of pipeline in the first column of the following table not later than the
date in the second column:
(5) Implement and follow the program.
Energy Transfer failed to follow Section 9 of its written Integrity Management Plan that
requires the evaluation of the Integrity Management Program annually and its distribution
to management by December 15th. The record for the annual evaluation of the program
using performance measures shows that the evaluation was not carried out between 2013
and 2016 (5 years). The first year this evaluation was carried out was in 2017.
§195.452 – Pipeline integrity management in high consequence areas.
(l) What records must an operator keep to demonstrate compliance?
(1) An operator must maintain, for the useful life of the pipeline, records that
demonstrate compliance with the requirements of this subpart. At a minimum, an
operator must maintain the following records for review during an inspection:
(ii) Documents to support the decisions and analyses, including any modifications,
justifications, deviations and determinations made, variances, and actions taken, to
page 622 implement and evaluate each element of the integrity management program
listed in paragraph (f) of this section.
Energy Transfer failed to provide any record that shows that an evaluation for the need or
lack of need for Emergency Flow Restricting Device (EFRD) on the segments that could
affect an HCA, of the Lone Star NGL pipeline system had been carried out. Energy
Transfer stated that it determined that EFRDs were not necessary on its system after an
evaluation was carried out; however, Energy Transfer could not provide any records
substantiating this finding or decision.
Likewise, Energy Transfer failed to maintain records showing the risk analysis results from
previous years compared against the current risk analysis results. Energy Transfer stated
these records were not maintained in its database.
4



6. §195.583 – What must I do to monitor atmospheric corrosion control?
(a) You must inspect each pipeline or portion of pipeline that is exposed to the
atmosphere for evidence of atmospheric corrosion, as follows:
Then the frequency of inspection is:
At least once every 3 calendar years, but with intervals not
exceeding 39 months
If the pipeline is
located:
Onshore Energy Transfer failed to inspect exposed portions of its 24” Permian Connector at Hailey
Junction for evidence of atmospheric corrosion within the 3 calendar years to 39 months
frequency required under 49 CFR §195.583. The inspection records show the last
inspection was on July 14, 2014 and subsequently on April 4, 2018. The interval between
the inspections was therefore 45 months which exceeded the required deadline by 6
months. The required follow up inspection should have occurred no later than October 14,
2017.
Proposed Civil Penalty
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$213,268 per violation per day the violation persists, up to a maximum of $2,132,679 for a related
series of violations. For violation occurring on or after November 2, 2015 and before November
27, 2018, the maximum penalty may not exceed $209,002 per violation per day, with a maximum
penalty not to exceed $2,090,022. For violations occurring prior to November 2, 2015, the
maximum penalty may not exceed $200,000 per violation per day, with a maximum penalty not to
exceed $2,000,000 for a related series of violations. The Compliance Officer has reviewed the
circumstances and supporting documentation involved in the above probable violation(s) and has
recommended that you be preliminarily assessed a civil penalty of $73,600 as follows:
Item number PENALTY
2 $73,600
Warning Items
With respect to item numbers 3,4, and 6 we have reviewed the circumstances and supporting
documents involved in this case and have decided not to conduct additional enforcement action or
penalty assessment proceedings at this time. We advise you to promptly correct these items.
Failure to do so may result in additional enforcement action.
Proposed Compliance Order
5



With respect to items 1, and 5 pursuant to 49 U.S.C. § 60118, the Pipeline and Hazardous Materials
Safety Administration proposes to issue a Compliance Order to Energy Transfer Company. Please
refer to the Proposed Compliance Order, which is enclosed and made a part of this Notice.
Response to this Notice
Enclosed as part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. All
material you submit in response to this enforcement action may be made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5
U.S.C. 552(b), along with the complete original document you must provide a second copy of the
document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment under
5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, or request a
hearing under 49 CFR § 190.211. If you do not respond within 30 days of receipt of this Notice,
this constitutes a waiver of your right to contest the allegations in this Notice and authorizes the
Associate Administrator for Pipeline Safety to find facts as alleged in this Notice without further
notice to you and to issue a Final Order. If you are responding to this Notice, we propose that you
submit your correspondence to my office within 30 days from receipt of this Notice. This period
may be extended by written request for good cause.
In your correspondence on this matter, please refer to CPF 4-2019-5016 and, for each document
you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Mary L. McDaniel P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
Enclosures: Proposed Compliance Order
Response Options for Pipeline Operators in Compliance Proceedings
6



PROPOSED COMPLIANCE ORDER
Pursuant to 49 United States Code § 60118, the Pipeline and Hazardous Materials Safety
Administration (PHMSA) proposes to issue to Energy Transfer a Compliance Order incorporating
the following remedial requirements to ensure the compliance of Energy Transfer Company with
the pipeline safety regulations:
1. In regard to Item Number 1 of the Notice pertaining to ranking of atmospheric
corrosion inspection and documenting the evaluation results as set forth in HLD 44
procedure, Energy Transfer shall review the HLD 44 procedure and retrain it’s
corrosion control personnel on the requirements for evaluating coating conditions
and properly documenting the atmospheric corrosion evaluation / inspection.
2. In regard to Item Number 5 of the Notice pertaining to Energy Transfer’s inability
to provide records showing that an evaluation for the need for EFRD on the Lone
Star NGL pipeline was carried out, Energy Transfer shall conduct an EFRD study
and provide records of that study to PHMSA.
3. 4. Records showing all trainings, retraining’s, implementations and plan of correction
as required in Items 1 and 5 of this compliance order shall be submitted within 90
days of the issuance of the Final Order.
It is requested (not mandated) that Energy Transfer Company maintain
documentation of the safety improvement costs associated with fulfilling this
Compliance Order and submit the total to Mary L. McDaniel, Director, Southwest
Region, Pipeline and Hazardous Materials Safety Administration. It is requested
that these costs be reported in two categories: 1) total cost associated with
preparation/revision of plans, procedures, studies and analyses, and 2) total cost
associated with replacements, additions and other changes to pipeline
infrastructure.
7

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/420195016>
- Source ID: `phmsa-enforcement`
- SHA-256: `a1b35d6ff532bc337e6b2c17d64f6f0f54aa27ced26525349ff41e2391399314`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-23T14:04:15.775Z
- Document slug: `phmsa-enforcement-420195016`

### Source metadata

```json
{
  "cpf": "420195016",
  "operator": "ENERGY TRANSFER COMPANY",
  "region": "Southwest",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.402(a)",
    "195.452(b)(1)",
    "195.452(b)(5)",
    "195.452(j)(1)",
    "195.452(l)(1)(ii)",
    "195.583(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 7,
  "attachments": [
    {
      "name": "420195016_Closure Letter_09092020.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420195016/420195016_Closure%20Letter_09092020.pdf",
      "bytes": 228077,
      "category": "agency_document"
    },
    {
      "name": "420195016_Closure Letter_09092020_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420195016/420195016_Closure%20Letter_09092020_text.pdf",
      "bytes": 69973,
      "category": "agency_document"
    },
    {
      "name": "420195016_Final Order_01142020.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420195016/420195016_Final%20Order_01142020.pdf",
      "bytes": 1307604,
      "category": "agency_document"
    },
    {
      "name": "420195016_Final Order_01142020_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420195016/420195016_Final%20Order_01142020_text.pdf",
      "bytes": 107297,
      "category": "agency_document"
    },
    {
      "name": "420195016_NOPV PCP PCO_08122019.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420195016/420195016_NOPV%20PCP%20PCO_08122019.pdf",
      "bytes": 141554,
      "category": "agency_document"
    },
    {
      "name": "420195016_NOPV PCP PCO_08122019_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420195016/420195016_NOPV%20PCP%20PCO_08122019_text.pdf",
      "bytes": 163503,
      "category": "agency_document"
    },
    {
      "name": "420195016_Operator Response to Notice_ 09132019.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/420195016/420195016_Operator%20Response%20to%20Notice_%2009132019.pdf",
      "bytes": 349390,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 3,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "ENERGY TRANSFER COMPANY"
}
```