# SABINE PASS LNG, L.P. (Cheniere) — Notice of Probable Violation

**Citation:** CPF 42021022NOPV  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2021-09-23

CLOSED notice of probable violation citing 193.2503.

## Document text

Notice of Probable Violation involving SABINE PASS LNG, L.P. (Cheniere). PHMSA's enforcement data identifies the cited regulation as 193.2503. The case was opened on 2021-09-23 and is reported as closed as of 2022-01-11. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

42021022NOPV_Closure Letter_01112022_(20-186120).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42021022NOPV/42021022NOPV_Closure%20Letter_01112022_(20-186120).pdf

42021022NOPV_Closure Letter_01112022_(20-186120)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42021022NOPV/42021022NOPV_Closure%20Letter_01112022_(20-186120)_text.pdf

42021022NOPV_Final Order_12102021_(20-186120).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42021022NOPV/42021022NOPV_Final%20Order_12102021_(20-186120).pdf

42021022NOPV_Final Order_12102021_(20-186120)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42021022NOPV/42021022NOPV_Final%20Order_12102021_(20-186120)_text.pdf

42021022NOPV_Operator Response to Notice_10202021_(20-186120).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42021022NOPV/42021022NOPV_Operator%20Response%20to%20Notice_10202021_(20-186120).pdf

42021022NOPV_PCO_09232021_(20-186120).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42021022NOPV/42021022NOPV_PCO_09232021_(20-186120).pdf

42021022NOPV_PCO_09232021_(20-186120)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42021022NOPV/42021022NOPV_PCO_09232021_(20-186120)_text.pdf

42021022NOPV_Final Order_12102021_(20-186120)_text.pdf

December 10, 2021
VIA ELECTRONIC MAIL TO: jack.fusco@cheniere.com
Mr. Jack A. Fusco
President and Chief Executive Officer
Cheniere Energy, Inc.
700 Milam Street, Suite 1900
Houston, Texas 77002
Re: CPF No. 4-2021-022-NOPV
Dear Mr. Fusco:
Enclosed please find the Final Order issued in the above-referenced case to your subsidiary,
Sabine Pass Liquefaction, LLC. It makes a finding of violation and specifies actions that need to
be taken to comply with the pipeline safety regulations. When the terms of the compliance order
are completed, as determined by the Director, Southwest Region, this enforcement action will be
closed. Service of the Final Order by e-mail is effective upon the date of transmission as
provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Ms. Mary McDaniel, PE, Director, Southwest Region, Office of Pipeline Safety, PHMSA
Mr. Maas Hinz, Vice President and General Manager, Sabine Pass Liquefaction, LLC,
maas.hinz@cheniere.com
Mr. Aaron Stephenson, President, Sabine Pass Liquefaction, LLC,
aaron.stephenson@cheniere.com
Mr. Tom Myers, Vice President, Health, Safety, and Environment, Cheniere Energy, Inc.,
thomas.myers@cheniere.com
Mr. Michael Weller, Senior Counsel, Cheniere Energy, Inc., michael.weller@cheniere.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Sabine Pass Liquefaction, LLC, ) CPF No. 4-2021-022-NOPV
a subsidiary of Cheniere Energy, Inc., )
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On September 23, 2021, pursuant to 49 C.F.R. § 190.207, the Director, Southwest Region,
Office of Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Sabine Pass
Liquefaction, LLC, a subsidiary of Cheniere Energy, Inc. (Respondent). The Notice proposed
finding that Respondent violated the pipeline safety regulations in 49 C.F.R. § 193.2503. The
Notice also proposed certain measures to correct the violation. Respondent did not contest the
allegation of violation or corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 193.2503 (Item 1) ─ Respondent failed to follow its manual of
written procedures to provide safety in normal operations and in responding to an
abnormal operation that would affect safety.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
COMPLIANCE ACTIONS
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violation. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of ordered actions, Respondent may request that the Director close the case. Failure to comply
with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223 or in



referral to the Attorney General for appropriate relief in a district court of the United States.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
December 10, 2021
__________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

42021022NOPV_Closure Letter_01112022_(20-186120)_text.pdf

ELECTRONIC MAIL - RETURN RECEIPT REQUESTED
January 11, 2022
Mr. Jack A. Fusco
President and Chief Executive Officer
Cheniere Energy, Inc.
700 Milam Street, Suite 1900
Houston, Texas 77002
CPF 4-2021-022-NOPV
Dear Mr. Fusco:
On December 10, 2021, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Sabine Pass Liquefaction, LLC. (Cheniere), a Final Order in the above-referenced case.
This Order included a Compliance Order requirement to complete an alarm management study.
Based on PHMSA’s review of the documentation provided by Cheniere, it has been determined
that Cheniere has complied with the terms of the Final Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/42021022NOPV>
- Source ID: `phmsa-enforcement`
- SHA-256: `420fe1d80d0a01d6bbdb26988d0d52fba8fda90b9b540a1dae65a2903741b6c3`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T05:38:35.911Z
- Document slug: `phmsa-enforcement-42021022nopv`

### Source metadata

```json
{
  "cpf": "42021022NOPV",
  "operator": "SABINE PASS LNG, L.P. (Cheniere)",
  "region": "Southwest",
  "pipelineType": "INTERSTATE LNG",
  "caseStatus": "CLOSED",
  "citedSections": [
    "193.2503"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 7,
  "attachments": [
    {
      "name": "42021022NOPV_Closure Letter_01112022_(20-186120).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42021022NOPV/42021022NOPV_Closure%20Letter_01112022_(20-186120).pdf",
      "bytes": 243653,
      "category": "agency_document"
    },
    {
      "name": "42021022NOPV_Closure Letter_01112022_(20-186120)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42021022NOPV/42021022NOPV_Closure%20Letter_01112022_(20-186120)_text.pdf",
      "bytes": 76280,
      "category": "agency_document"
    },
    {
      "name": "42021022NOPV_Final Order_12102021_(20-186120).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42021022NOPV/42021022NOPV_Final%20Order_12102021_(20-186120).pdf",
      "bytes": 345400,
      "category": "agency_document"
    },
    {
      "name": "42021022NOPV_Final Order_12102021_(20-186120)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42021022NOPV/42021022NOPV_Final%20Order_12102021_(20-186120)_text.pdf",
      "bytes": 109579,
      "category": "agency_document"
    },
    {
      "name": "42021022NOPV_Operator Response to Notice_10202021_(20-186120).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42021022NOPV/42021022NOPV_Operator%20Response%20to%20Notice_10202021_(20-186120).pdf",
      "bytes": 285849,
      "category": "party_submission"
    },
    {
      "name": "42021022NOPV_PCO_09232021_(20-186120).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42021022NOPV/42021022NOPV_PCO_09232021_(20-186120).pdf",
      "bytes": 288486,
      "category": "case_document"
    },
    {
      "name": "42021022NOPV_PCO_09232021_(20-186120)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42021022NOPV/42021022NOPV_PCO_09232021_(20-186120)_text.pdf",
      "bytes": 149732,
      "category": "case_document"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "SABINE PASS LNG, L.P. (Cheniere)"
}
```