# LINDE — Notice of Amendment

**Citation:** CPF 42021054NOA  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2021-10-04

CLOSED notice of amendment citing 192.187, 192.515(a), 192.605(a), 192.605(b)(2).

## Document text

Notice of Amendment involving LINDE. PHMSA's enforcement data identifies the cited regulations as 192.187,  192.515(a),  192.605(a),  192.605(b)(2). The case was opened on 2021-10-04 and is reported as closed as of 2022-02-23. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

42021054NOA_Closure Letter_02232022_(21-201519).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42021054NOA/42021054NOA_Closure%20Letter_02232022_(21-201519).pdf

42021054NOA_Closure Letter_02232022_(21-201519)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42021054NOA/42021054NOA_Closure%20Letter_02232022_(21-201519)_text.pdf

42021054NOA_Notice of Amendment_10042021_(21-201519).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42021054NOA/42021054NOA_Notice%20of%20Amendment_10042021_(21-201519).pdf

42021054NOA_Notice of Amendment_10042021_(21-201519)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42021054NOA/42021054NOA_Notice%20of%20Amendment_10042021_(21-201519)_text.pdf

42021054NOA_Operator Response to Notice_11012021_(21-201519).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42021054NOA/42021054NOA_Operator%20Response%20to%20Notice_11012021_(21-201519).pdf

42021054NOA_Notice of Amendment_10042021_(21-201519)_text.pdf

NOTICE OF AMENDMENT
ELECTRONIC MAIL - RETURN RECEIPT REQUESTED
October 4, 2021
Steve Angel
Chief Executive Officer
Linde, PLC
10 Riverview Drive
Danbury, Connecticut 06810
CPF 4-2021-054-NOA
Dear Mr. Angel:
From March 22, 2021 through April 6, 2021, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code
(U.S.C.) inspected Linde, PLC’s (Linde) written procedures for the operation and maintenance of
its hydrogen pipelines operating in the Gulf Coast Area; Ontario, California; Geismar, Louisiana;
Ecorse, Michighan; Whiting, Indiana; and Niagara Falls, New York via video teleconference.
Based on the inspection, PHMSA has identified the apparent inadequacies found within Linde’s
plans or procedures, as described below:
1. § 192.605 Procedural manual for operations, maintenance, and emergencies
(a) General. Each operator shall prepare and follow for each pipeline, a manual of
written procedures for conducting operations and maintenance activities and for
emergency response. For transmission lines, the manual must also include procedures
for handling abnormal operations. This manual must be reviewed and updated by the
operator at intervals not exceeding 15 months, but at least once each calendar year.
This manual must be prepared before operations of a pipeline system commence.
Appropriate parts of the manual must be kept at locations where operations and
maintenance activities are conducted.



§ 192.187 - Vaults: Sealing, venting, and ventilation.
Each underground vault or closed top pit containing either a pressure regulating or
reducing station, or a pressure limiting or relieving station, must be sealed, vented or
ventilated, as follows:
(a) When the internal volume exceeds 200 cubic feet (5.7 cubic meters):
(1) The vault or pit must be ventilated with two ducts, each having at least the
ventilating effect of a pipe 4 inches (102 millimeters) in diameter
(2) The ventilation must be enough to minimize the formation of combustible
atmosphere in the vault or pit; and,
(3) The ducts must be high enough above grade to disperse any gas-air
mixtures that might be discharged.
(b) When the internal volume is more than 75 cubic feet (2.1 cubic meters) but less
than 200 cubic feet (5.7 cubic meters):
(1) If the vault or pit is sealed, each opening must have a tight fitting cover
without open holes through which an explosive mixture might be ignited, and
there must be a means for testing the internal atmosphere before removing the
cover;
(2) If the vault or pit is vented, there must be a means of preventing external
sources of ignition from reaching the vault atmosphere; or
(3) If the vault or pit is ventilated, paragraph (a) or (c) of this section applies.
(c) If a vault or pit covered by paragraph (b) of this section is ventilated by openings
in the covers or gratings and the ratio of the internal volume, in cubic feet, to the
effective ventilating area of the cover or grating, in square feet, is less than 20 to 1, no
additional ventilation is required.
Linde’s written operations and maintenance procedure is inadequate because it does not
sufficiently address the conditions of each underground vault or closed top pit containing either
a pressure regulating or reducing station or a pressure limiting or relieving station, which must
be sealed, vented, or ventilated as required per § 192.187. Specifically, Linde’s Operations and
Maintenance Manual, Regulated Hydrogen Gas Pipeline, OM-2287, 26.2 Vaults (Revised:
February 12, 2021) does not state the required criteria for ventilation, formation of combustible
atmosphere, or gas dispersion in vaults with an internal volume that exceeds 200 cubic feet.
Additionally, Linde’s operations and maintenance procedure fails to address vaults with an
internal volume of less than 200 cubic feet but greater than or equal to 75 cubic feet.
Furthermore, Linde’s procedure fails to address the criteria for ventilated openings in covers or
gratings.
Linde must amend its written operations and maintenance procedures to address the required
criteria for ventilation, formation of combustible atmosphere, and gas dispersion for vaults with
an internal volume of 200 cubic feet, less than 200 cubic feet but greater than 75 cubic feet, and
the required criteria for ventilated opening in covers or gratings as required by § 192.187.
2



2. § 192.605 Procedural manual for operations, maintenance, and emergencies
(a) General. Each operator shall prepare and follow for each pipeline, a manual of
written procedures for conducting operations and maintenance activities and for
emergency response. For transmission lines, the manual must also include procedures
for handling abnormal operations. This manual must be reviewed and updated by the
operator at intervals not exceeding 15 months, but at least once each calendar year.
This manual must be prepared before operations of a pipeline system commence.
Appropriate parts of the manual must be kept at locations where operations and
maintenance activities are conducted.
§ 192.515 - Environmental protection and safety requirements.
(a) In conducting tests under this subpart, each operator shall insure that every
reasonable precaution is taken to protect its employees and the general public during
the testing. Whenever the hoop stress of the segment of the pipeline being tested will
exceed 50 percent of SMYS, the operator shall take all practicable steps to keep
persons not working on the testing operation outside of the testing area until the
pressure is reduced to or below the proposed maximum allowable operating pressure.
Linde’s operations and maintenace procedures are inadequate because they do not address the
protection of its employees and the general public during actual pressure testing as required by
§ 192.515. Specifically, Linde’s T-6, Hydrostatic Testing of Pipelines (Effective Date:
10/30/2018) does not include the requirements of safe distances, communication to the public,
or precautions for conditions where the hoop stress of a segment being tested will be equal to or
greater than 50 percent SMYS, and a requirement to maintain a clear test area. Additionally,
Linde’s Operations and Maintenance Manual, Regulated Hydrogen Gas Pipeline, OM-2287, 13
Pressure Testing (Revised: February 12, 2021) does not discuss employee or public safety.
However, Linde's T-1, Procedure for Pneumatic Testing in Lieu of Hydrostatic Test (Effective
Date: 02/20/2018) sufficiently references safety protocols. Subsequently, Linde provided Policy
W.SES-2.02.15: Pressure and Leak Testing of Piping and Equipment (Effective: 12/2/2014) that
does not provide a safe setback distance for test liquids from a hydostatic test and is not
mentioned in Linde’s T-1 or T-6 procedures.
Linde must amend its written operations and maintenance procedures to ensure that every
reasonable precaution is taken to protect its employees and the general public during pressure
testing, including whenever the hoop stress of the segment of pipeline being tested will exceed
50 percent of SMYS, Linde will take all practicable steps to keep persons not working on the
testing operation outside of the testing area until the pressure is reduced to or below the proposed
allowable operating pressure in accordance with § 192.515.
3



3. § 192.605 - Procedural manual for operations, maintenance, and emergencies.
(a) …
(b) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following, if applicable, to provide safety
during maintenance and operations.
(1) …
(2) Controlling corrosion in accordance with the operations and maintenance
requirements of subpart I of this part.
Linde’s operation and maintenance procedure is inadequate because it does not address low-
purity gas with potential corrosive compounds. Specifically, Linde’s Operations and
Maintenance Manual, Regulated Hydrogen Gas Pipeline, OM-2287, 32.3 Inspection of Exposed
Internal Pipe Surfaces (Revised: February 12, 2021) states:
Linde hydrogen pipelines transport very high-purity dry hydrogen
gas, which does not contain significant amounts of corrosive
compounds. Internal corrosion is not anticipated, nor has evidence
of internal corrosion ever been found. As a result, Linde pipelines
do not require coupons for monitoring internal corrosion nor other
features incorporated into its design and construction to reduce the
risk of internal corrosion such as liquid collection reduction
configurations, liquid removal features, or devices for monitoring
internal corrosion. Only the Geismar Syn-Gas hydrogen/carbon
monoxide pipeline requires periodic internal inspection based on the
lower purity of hydrogen/carbon monoxide syn-gas.
During the inspection, Linde stated that it does not take various measures to monitor internal
corrosion due to its high-purity gas. However, Linde’s Operations and Maintenance Manual,
Regulated Hydrogen Gas Pipeline notes that its Geismar Syn-Gas facility requires periodic
internal inspection based on the existence of low-purity gas. Therefore, with the existence of
low-purity gas, a procedure is required to address potential internal corrosion threats from low-
purity gas.
Linde must amend its written operations and maintenance procedures to include a specific
procedure for the periodic internal inspection for corrosion control of potentially corrosive
compounds entrained within low-purity gas as required by § 192.605.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled, Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available.
If you believe that any portion of your responsive material qualifies for confidential treatment
4



under 5 U.S.C. 552(b), along with the complete original document, you must provide a second
copy of the document with the portions you believe qualify for confidential treatment redacted and
an explanation of why you believe the redacted information qualifies for confidential treatment
under 5 U.S.C. 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 90 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that Linde, PLC maintain documentation of the safety improvement
costs associated with fulfilling this Notice of Amendment (preparation/revision of plans,
procedures) and submit the total to Mary L. McDanie, P.E., Director, Southwest Region, Pipeline
and Hazardous Materials Safety Administration. In correspondence concerning this matter, please
refer to CPF 4-2021-054-NOA and, for each document you submit, please provide a copy in
electronic format whenever possible.
Sincerely,
Mary L. McDaniel, P.E.,
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
cc: John Maitino – Compliance Manager, John.Maitino@Linde.com
5

42021054NOA_Closure Letter_02232022_(21-201519)_text.pdf

ELECTRONIC MAIL - RETURN RECEIPT REQUESTED
February 23, 2022
Steve Angel
Chief Executive Officer
Linde, PLC
10 Riverview Drive
Danbury, Connecticut 06810
CPF 4-2021-054-NOA
Dear Mr. Angel:
From March 22, 2021 through April 6, 2021, a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code,
inspected Linde, PLC’s (Linde) written procedures for the operation and maintenance of its
hydrogen pipelines operating in the Gulf Coast Area; Ontario, California; Geismar, Louisiana;
Ecorse, Michigan; Whiting, Indiana; and Niagara Falls, New York. As a result of the inspection,
Linde was issued a Notice of Amendment on October 4, 2021, which proposed amendment of your
procedures.
Linde submitted its response and revised procedures on November 1, 2021, and December 23,
2021. My staff reviewed the amended procedures, and it appears that the inadequacies outlined in
the Notice have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Mary L. McDaniel, P.E.
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
cc: John Maitino – Compliance Manager, John.Maitino@Linde.com

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/42021054NOA>
- Source ID: `phmsa-enforcement`
- SHA-256: `737ba062d8b5e97899c199b58bec432bd22a65cda105daf264eda42810b656fa`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T07:39:20.705Z
- Document slug: `phmsa-enforcement-42021054noa`

### Source metadata

```json
{
  "cpf": "42021054NOA",
  "operator": "LINDE",
  "region": "Southwest",
  "pipelineType": "INTERSTATE GAS TRANSMISSION, INTRASTATE GAS TRANSMISSION",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.187",
    "192.515(a)",
    "192.605(a)",
    "192.605(b)(2)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "42021054NOA_Closure Letter_02232022_(21-201519).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42021054NOA/42021054NOA_Closure%20Letter_02232022_(21-201519).pdf",
      "bytes": 245818,
      "category": "agency_document"
    },
    {
      "name": "42021054NOA_Closure Letter_02232022_(21-201519)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42021054NOA/42021054NOA_Closure%20Letter_02232022_(21-201519)_text.pdf",
      "bytes": 81067,
      "category": "agency_document"
    },
    {
      "name": "42021054NOA_Notice of Amendment_10042021_(21-201519).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42021054NOA/42021054NOA_Notice%20of%20Amendment_10042021_(21-201519).pdf",
      "bytes": 301633,
      "category": "agency_document"
    },
    {
      "name": "42021054NOA_Notice of Amendment_10042021_(21-201519)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42021054NOA/42021054NOA_Notice%20of%20Amendment_10042021_(21-201519)_text.pdf",
      "bytes": 134072,
      "category": "agency_document"
    },
    {
      "name": "42021054NOA_Operator Response to Notice_11012021_(21-201519).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42021054NOA/42021054NOA_Operator%20Response%20to%20Notice_11012021_(21-201519).pdf",
      "bytes": 280334,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "LINDE"
}
```