# ONEOK NGL PIPELINE, LLC — Notice of Probable Violation

**Citation:** CPF 42022008NOPV  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2022-04-25

CLOSED notice of probable violation citing 195.64(c)(1).

## Document text

Notice of Probable Violation involving ONEOK NGL PIPELINE, LLC. PHMSA's enforcement data identifies the cited regulation as 195.64(c)(1). The case was opened on 2022-04-25 and is reported as closed as of 2022-07-11. Proposed civil penalty: $36,200. Assessed civil penalty: $36,200. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

42022008NOPV_Final Order_06152022_(21-227989).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022008NOPV/42022008NOPV_Final%20Order_06152022_(21-227989).pdf

42022008NOPV_Final Order_06152022_(21-227989)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022008NOPV/42022008NOPV_Final%20Order_06152022_(21-227989)_text.pdf

42022008NOPV_Operator Response to Notice_05242022_(21-227989).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022008NOPV/42022008NOPV_Operator%20Response%20to%20Notice_05242022_(21-227989).pdf

42022008NOPV_PCP_04252022_(21-227989).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022008NOPV/42022008NOPV_PCP_04252022_(21-227989).pdf

42022008NOPV_PCP_04252022_(21-227989)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022008NOPV/42022008NOPV_PCP_04252022_(21-227989)_text.pdf

42022008NOPV_Final Order_06152022_(21-227989)_text.pdf

June 15, 2022
VIA ELECTRONIC MAIL TO: pierce.norton@oneok.com
Mr. Pierce H. Norton II
President and Chief Executive Officer
ONEOK NGL Pipeline, LLC
100 West Fifth Street
Tulsa, Oklahoma 74103
Re: CPF No. 4-2022-008-NOPV
Dear Mr. Norton:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and assesses a civil penalty of $36,200. When the civil penalty has been paid, this
enforcement action will be closed. Service of the Final Order by e-mail is effective upon the
date of transmission and acknowledgement of receipt as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Ms. Mary McDaniel, Director, Southwest Region, Office of Pipeline Safety, PHMSA
Mr. Scott Schingen, Senior Vice President, Operations, ONEOK NGL Pipeline, LLC,
scott.schingen@oneok.com
Mr. Gary Numedahl, Director, DOT Compliance, ONEOK NGL Pipeline, LLC,
gary.numedahl@oneok.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
ONEOK NGL Pipeline, LLC, ) CPF No. 4-2022-008-NOPV
a subsidiary of ONEOK, Inc., )
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On April 25, 2022, pursuant to 49 C.F.R. § 190.207, the Director, Southwest Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to ONEOK NGL Pipeline,
LLC (Respondent), a subsidiary of ONEOK, Inc.
1 The Notice proposed finding that Respondent
had violated the pipeline safety regulations in 49 C.F.R. Part 195 and proposed a civil penalty of
$36,200. Respondent did not contest the allegations of violation or the proposed civil penalty.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 195.64(c)(1)(i) (Item 1) ─ Respondent failed to notify PHMSA
electronically through the National Registry 60 days before the start of
construction of the Big Gulch Pump Station (Site 794).
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent. In accordance with 49 C.F.R. § 190.223, Respondent is assessed a
civil penalty amount of $36,200.
Payment of the civil penalty must be made within 20 days of service. Federal regulations (49
C.F.R. § 89.21(b)(3)) require such payment to be made by wire transfer through the Federal
Reserve Communications System (Fedwire), to the account of the U.S. Treasury. Detailed
instructions are contained in the enclosure. Questions concerning wire transfers should be
directed to: Financial Operations Division (AMK-325), Federal Aviation Administration, Mike
Monroney Aeronautical Center, 6500 S MacArthur Blvd, Oklahoma City, Oklahoma 79169.
1 US SEC Form 10-K, ONEOK, Inc., available at https://otp.tools.investis.com/clients/us/oneok inc2/SEC/sec-
show.aspx?Type=html&FilingId=15621391&CIK=0001039684&Index=10000 (last accessed May 31, 2022).



CPF No. 4-2022-008-NOPV
Page 2
The Financial Operations Division telephone number is (405) 954-8845.
Failure to pay the $36,200 civil penalty will result in accrual of interest at the current annual rate
in accordance with 31 U.S.C. § 3717, 31 C.F.R. § 901.9 and 49 C.F.R. § 89.23. Pursuant to
those same authorities, a late penalty charge of six percent (6%) per annum will be charged if
payment is not made within 110 days of service. Furthermore, failure to pay the civil penalty
may result in referral of the matter to the Attorney General for appropriate action in a district
court of the United States.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
June 15, 2022
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/42022008NOPV>
- Source ID: `phmsa-enforcement`
- SHA-256: `a7efc36877e94d4101cb8e04193725d8fed2e2c0616c57837961edcf2c16bf40`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-23T21:59:04.609Z
- Document slug: `phmsa-enforcement-42022008nopv`

### Source metadata

```json
{
  "cpf": "42022008NOPV",
  "operator": "ONEOK NGL PIPELINE, LLC",
  "region": "Southwest",
  "pipelineType": "INTERSTATE LIQUID",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.64(c)(1)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "42022008NOPV_Final Order_06152022_(21-227989).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42022008NOPV/42022008NOPV_Final%20Order_06152022_(21-227989).pdf",
      "bytes": 317779,
      "category": "agency_document"
    },
    {
      "name": "42022008NOPV_Final Order_06152022_(21-227989)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42022008NOPV/42022008NOPV_Final%20Order_06152022_(21-227989)_text.pdf",
      "bytes": 73823,
      "category": "agency_document"
    },
    {
      "name": "42022008NOPV_Operator Response to Notice_05242022_(21-227989).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42022008NOPV/42022008NOPV_Operator%20Response%20to%20Notice_05242022_(21-227989).pdf",
      "bytes": 175511,
      "category": "party_submission"
    },
    {
      "name": "42022008NOPV_PCP_04252022_(21-227989).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42022008NOPV/42022008NOPV_PCP_04252022_(21-227989).pdf",
      "bytes": 363020,
      "category": "case_document"
    },
    {
      "name": "42022008NOPV_PCP_04252022_(21-227989)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42022008NOPV/42022008NOPV_PCP_04252022_(21-227989)_text.pdf",
      "bytes": 191284,
      "category": "case_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "ONEOK NGL PIPELINE, LLC"
}
```
