# FLORIDA GAS TRANSMISSION CO — Notice of Probable Violation

**Citation:** CPF 42022032NOPV  
**Type / status:** enforcement / current  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2022-07-22

OPEN notice of probable violation citing 192.619(a)(3), 192.917(a)(1), 192.937(c)(1).

## Document text

Notice of Probable Violation involving FLORIDA GAS TRANSMISSION CO. PHMSA's enforcement data identifies the cited regulations as 192.619(a)(3),  192.917(a)(1),  192.937(c)(1). The case was opened on 2022-07-22 and is reported as open. Proposed civil penalty: $834,400. Assessed civil penalty: $0. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

42022032NOPV_Final Order_05212024_(20-190995).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_Final%20Order_05212024_(20-190995).pdf

42022032NOPV_Final Order_05212024_(20-190995)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_Final%20Order_05212024_(20-190995)_text.pdf

42022032NOPV_Florida Gas Transmission v PHMSA Petition for Review of an Order_05202026_(20-190995).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_Florida%20Gas%20Transmission%20v%20PHMSA%20Petition%20for%20Review%20of%20an%20Order_05202026_(20-190995).pdf

42022032NOPV_Operator Post-Hearing Submission_04212023_(20-190995).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_Operator%20Post-Hearing%20Submission_04212023_(20-190995).pdf

42022032NOPV_Operator Pre-Hearing Submission_03142023_(20-190995).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_Operator%20Pre-Hearing%20Submission_03142023_(20-190995).pdf

42022032NOPV_Operator RfH and Statement of Issues_09302022_(20-190995).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_Operator%20RfH%20and%20Statement%20of%20Issues_09302022_(20-190995).pdf

42022032NOPV_Operator RtN and Statement of Issues_09302022_(20-190995).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_Operator%20RtN%20and%20Statement%20of%20Issues_09302022_(20-190995).pdf

42022032NOPV_Operator to PHC - External Petition for Review_08162024_(20-190995).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_Operator%20to%20PHC%20-%20External%20Petition%20for%20Review_08162024_(20-190995).pdf

42022032NOPV_PCP_07222022_(20-190995).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_PCP_07222022_(20-190995).pdf

42022032NOPV_PCP_07222022_(20-190995)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_PCP_07222022_(20-190995)_text.pdf

42022032NOPV_PHC Hearing Scheduled_11012022_(20-190995).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_PHC%20Hearing%20Scheduled_11012022_(20-190995).pdf

42022032NOPV_PHC Hearing Scheduled_11012022_(20-190995)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_PHC%20Hearing%20Scheduled_11012022_(20-190995)_text.pdf

42022032NOPV_PHC Hearing Scheduled_11012022_(20-190995)_text.pdf

November 1, 2022
VIA ELECTRONIC MAIL TO: vince.murchison@pipelinelegal.com and
bryan.lethcoe@dot.gov
Mr. Vince Murchison, Esq.
Counsel for Florida Gas Transmission Company
Murchison Law Firm, PLLC
325 North St. Paul Street, Suite 2700
Dallas, Texas 75201
Mr. Bryan Lethcoe
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
8701 South Gessner Road, Suite 630
Houston, Texas 77074
Re: Notice of Hearing, Florida Gas Transmission Company
CPF No. 4-2022-032-NOPV
Dear Mr. Murchison and Mr. Lethcoe:
In accordance with 49 C.F.R. § 190.211, an informal hearing will be held regarding the Notice of
Probable Violation and Proposed Civil Penalty issued by the Pipeline and Hazardous Materials
Safety Administration in the above-referenced case. The hearing will take place on March 22,
2023, beginning at 8:30 a.m. Central Time.
The hearing will take place at the PHMSA Southwest Region office, 8701 South Gessner Road,
Suite 630, Houston, TX 77074. Upon arrival at the building, attendees will be required to present
photo identification to security personnel. A contact phone number for the day of the hearing is
(713) 272-2859.
At least 10 calendar days prior to the hearing (or by March 13, 2023), both parties must submit and
exchange any additional written materials they intend to present at the hearing and the name and
email address of each attendee. This information should be provided electronically. Materials not
submitted by this date may be excluded.



If you have any questions, please do not hesitate to contact me.
Sincerely,
Larry White
Presiding Official
cc: Mr. Eric Amundsen, Senior Vice President, Operations, Florida Gas Transmission Co.,
eric.amundsen@energytransfer.com
Ms. Heidi Slinkard, Counsel, Florida Gas Transmission Co.,
heidi.slinkard@energytransfer.com
Mr. Ian Curry, Esq., Counsel, Southwest Region, Office of Pipeline Safety,
ian.curry@dot.gov

42022032NOPV_Final Order_05212024_(20-190995)_text.pdf

May 21, 2024
VIA ELECTRONIC MAIL TO: tom.long@energytransfer.com
Thomas E. Long
Chief Executive Officer
Energy Transfer LP
1300 Main Street
Houston, Texas 77002
Re: CPF No. 4-2022-032-NOPV
Dear Mr. Long:
Enclosed please find the Final Order issued in the above-referenced case to Florida Gas
Transmission Company, LLC, a subsidiary of Energy Transfer LP. It withdraws one of the
allegations of violation, makes other findings of violation, and assesses a civil penalty of
$409,400. The penalty payment terms are set forth in the Final Order. This enforcement action
closes automatically upon receipt of payment. Service of the Final Order by e-mail is effective
upon the date of transmission and acknowledgement of receipt as provided under 49 C.F.R.
§ 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Bryan Lethcoe, Director, Southwest Region, Office of Pipeline Safety, PHMSA
Mr. Greg McIlwain, Executive Vice President of Operations, Energy Transfer LP,
gregory.mcilwain@energytransfer.com



Mr. Eric Amundsen, Senior Vice President of Operations, Energy Transfer LP,
eric.amundsen@energytransfer.com
Mr. Todd Stamm, Senior Vice President of Operations, Energy Transfer LP,
todd.stamm@energytransfer.com
Ms. Jennifer Street, Senior Vice President of Operations Services, Energy Transfer LP,
jennifer.street@energytransfer.com
Ms. Heidi Murchison, Chief Counsel, Energy Transfer LP,
heidi.murchison@energytransfer.com
Mr. Leif Jensen, Vice President of Tech Services, Energy Transfer LP,
leif.jensen@energytransfer.com
Mr. Todd Nardozzi, Director of Regulatory Compliance, Energy Transfer LP,
todd.nardozzi@energytransfer.com
Ms. Susie Sjulin, Director of Regulatory Compliance, Energy Transfer LP,
susie.sjulin@energytransfer.com
Mr. Vince Murchison, Esq., Outside Counsel for Florida Gas Transmission Co.,
Murchison Law Firm, PLLC, vince.murchison@pipelinelegal.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
______________________________________
In the Matter of )
Florida Gas Transmission Company, LLC, ) CPF No. 4-2022-032-NOPV
a subsidiary of Energy Transfer LP, )
)
)
)
Respondent. )
______________________________________)
FINAL ORDER
From September 13, 2020 through September 23, 2021, pursuant to 49 U.S.C. § 60117, a
representative of the Pipeline and Hazardous Materials Safety Administration (PHMSA), Office
of Pipeline Safety (OPS), conducted an on-site pipeline safety inspection and investigation of the
facilities and records of Florida Gas Transmission Company, LLC’s (FGT or Respondent) 12-
inch diameter Sanford Lateral natural gas transmission pipeline following a rupture of the
Sanford Lateral that occurred on September 10, 2020, in Sanford, Florida.1
The escaping natural gas ignited and burned an area measuring approximately 515 by 100 feet.
The burn also damaged and knocked down three overhead powerlines owned by Duke Energy
and about 32 homes and 93 businesses had to be evacuated. There were no reported injuries or
fatalities. On September 18, 2020, PHMSA issued a Corrective Action Order (CAO) to FGT
(CPF 4-2020-008-CAO) that required a shutdown of the pipeline segment and required a records
review and verification, a review of prior inline inspection results, a metallurgical laboratory
examination of the ruptured pipe, a root cause failure analysis, a pressure restriction upon restart,
and a remedial work plan. With PHMSA’s Southwest Region oversight, FGT repaired the pipe
at the rupture site and returned the Sanford Lateral to service on December 7, 2020, under the
terms of the CAO.
As a result of the inspection and investigation, the Director, Southwest Region, OPS (Director),
issued to Respondent, by letter dated July 22, 2022, a Notice of Probable Violation and Proposed
Civil Penalty (Notice). In accordance with 49 C.F.R. § 190.207, the Notice proposed finding
that FGT committed three violations of 49 C.F.R. Part 192 and proposed assessing a total civil
penalty of $834,400 for the alleged violations.
1 FGT is a large interstate natural gas pipeline company that operates approximately 5,300 miles of gas transmission
lines that originate in Galveston Bay and extend through various states including Florida. FGT is owned by Citrus
Corporation, a joint venture between Energy Transfer LP and Kinder Morgan, Inc. Energy Transfer LP website,
Natural Gas, available online at https://www.energytransfer.com/natural-gas (last accessed Jan. 30, 2024).



FGT responded to the Notice by letter dated September 30, 2022 (Response), as supplemented
by material submitted on March 13, 2023 (Pre-hearing Submission). FGT contested the
allegations and requested an informal hearing. A hearing was subsequently held on March 22,
2023, in Houston, Texas, before a Presiding Official from the Office of Chief Counsel, PHMSA.
At the hearing, Respondent was represented by counsel. After the hearing, Respondent provided
additional written material for the record by letter dated April 21, 2023 (Post-hearing
submission). The Director provided a recommendation on May 22, 2023 (Recommendation) and
FGT submitted a reply to the Recommendation on June 12, 2023 (Reply).
FINDINGS OF VIOLATION
The Notice alleged that Respondent violated 49 C.F.R. Part 192, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 192.619(a)(3), which states:
§ 192.619 Maximum allowable operating pressure: Steel or plastic
pipelines.
(a) No person may operate a segment of steel or plastic pipeline at a
pressure that exceeds a maximum allowable operating pressure (MAOP)
determined under paragraph (c), (d), or (e) of this section, or the lowest of
the following:
(1) …
(3) The highest actual operating pressure to which the segment was
subjected during the 5 years preceding the applicable date in the second
column. This pressure restriction applies unless the segment was tested
according to the requirements in paragraph (a)(2) of this section after the
applicable date in the third column or the segment was uprated according to
the requirements in subpart K of this part:
Pipeline segment Pressure date Test date
(i) Onshore regulated
gathering pipeline (Type A
or Type B under § 192.9(d))
that first became subject to
this part (other than
§192.612) after April 13,
2006
March 15, 2006, or
date pipeline
becomes subject to
this part, whichever
is later
5 years preceding
applicable date in
second column.
(ii) Onshore regulated
gathering pipeline (Type C
under § 192.9(d)) that first
became subject to this part
(other than § 192.612) on or
after May 16, 2022
May 16, 2023, or
date pipeline
becomes subject to
this part, whichever
is later
5 years preceding
applicable date in
second column.



(iii) Onshore transmission
pipeline that was a
gathering pipeline not
subject to this part before
March 15, 2006
March 15, 2006, or
date pipeline
becomes subject to
this part, whichever
is later
5 years preceding
applicable date in
second column.
(iv) Offshore gathering
pipelines
July 1, 1976 July 1, 1971.
(v) All other pipelines July 1, 1970 July 1, 1965.
The Notice alleged that Respondent violated 49 C.F.R. § 192.619(a)(3) by failing to establish a
maximum allowable operating pressure (MAOP) for its Sanford Lateral in accordance with
§ 192.619(a)(3). Specifically, the Notice alleged that FGT did not have records to substantiate
the highest actual operating pressure that the segment was subjected to during the five years prior
to MAOP establishment.
In its Response and at the hearing, FGT contested the allegation and provided information
concerning the history of the pipeline going back to 1959 indicating that former owners and
operators of the pipeline considered the MAOP in 1970 to be 713 psig. Respondent explained
that it maintained a one-page historical record from 1989 referred to by FGT as the “Gold Sheet”
that in its view substantiated the current MAOP for the Sanford Lateral,
2 and argued that the
regulations did not require it to have records to substantiate the MAOP indicated on the Gold
Sheet or otherwise substantiate the highest actual operating pressure that the segment was
subjected to during the five years prior to MAOP establishment. FGT further argued that the
Notice should have alleged a violation under the MAOP Reconfirmation section in § 192.624
which was added to Part 192 in 2019, and not establishment of MAOP under § 192.619.
At the hearing, OPS maintained that it was unable to verify or substantiate, based on FGT
records, that the Sanford Lateral was subjected to 713 psig during the five-year period prior to
July 1, 1970. FGT argued that “[n]o indication exists that Sanford Lateral was not subjected to a
highest pressure of 713 psig between 1965 and 1970.”3 OPS stated that Respondent did not
provide any records that would substantiate the establishment of an MAOP of 713 psig and that
the first pressure records provided to substantiate the MAOP were from the 2020 hydrostatic test
conducted pursuant to the CAO.
To demonstrate compliance with § 192.619(a)(3), operators are required to have records that
enable PHMSA to “verify that the entire pipeline was subjected to that pressure sometime during
the five-year period prior to July 1, 1970.”4 Consistent with this requirement, PHMSA issued
enforcement guidance in 2017 reminding operators that a probable violation may be found if an
2 PHMSA Violation Report, Exhibit A.
3 Post-hearing Submission, at 18.
4 West Texas Gas, Final Order, CPF No. 4-2004-1007, at 6 (Sept. 13, 2006).



operator cannot provide records to “substantiate the established MAOP.”5
With regard to the 1989 Gold Sheet, FGT acknowledged that it did not have pressure logs or
other such records of pressure readings associated with it, but suggested that Enron, the former
operator of the Sanford Lateral, must have reviewed such records when creating the Gold Sheet.
That assertion, however, does not take the place of records necessary to verify MAOP.6
Respondent also provided a declaration from a current FGT employee who had recently
reviewed the specifications of various valves and other components of the pipeline.7 The
declaration stated that “no component on the pipeline at the time of the September 10, 2020
incident had, and no component on the pipeline currently has, a design pressure that is less than
713 psig which is the established MAOP of the pipeline. However, this affidavit is insufficient
to satisfy § 192.619(c) because it failed to include any operating pressure readings from July 1,
1965 – July 1, 1970. In addition, OPS has advised operators that affidavits on their own are not
verifiable records sufficient to meet the requirement to establish MAOP.8 Without actual
pressure logs or similar records demonstrating actual pressures experienced during this five-year
time period, OPS cannot verify that the MAOP was properly established.
At the hearing, FGT also contended that even though the Gold Sheet does not reflect any actual
historical operating pressure readings, it is in some sense a record of the overall “limiting factor”
on the Sanford Lateral.9 Thus, it appears FGT accepts that 713 psig is not a reflection of the
actual operating pressure from 1965 to 1970, but instead reflects MAOP established under
§ 192.619(a)(1). The Gold Sheet, however, cannot be both. FGT also acknowledged that the
Gold Sheet may itself be inaccurate. FGT stated that “[i]t would not be unreasonable to
conclude” that the MAOP Authorization Sheet “inadvertently chose ‘619(c).”10 Because FGT
failed to substantiate its MAOP with § 192.619(c), it cannot rely on § 192.619(c) as a defense to
the alleged violation of § 192.619(a)(3). For the same reasons that the records fail to
demonstrate compliance with § 192.619(c), FGT failed to provide records to substantiate its
establishment of MAOP in accordance with § 192.619(a)(3).11 If the Gold Sheet does in fact
5 PHMSA, Operations & Maintenance Enforcement Guidance Part 192 Subparts L and M, at 81 (July 21, 2017),
available online at https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/regulatory-
compliance/pipeline/enforcement/5776/o-m-enforcement-guidance-part-192-7-21-2017.pdf.
6 PHMSA’s enabling statute requires operators to “make” and “maintain records” to demonstrate compliance with
the pipeline safety laws and regulations. See 49 U.S.C. § 60117(c). The failure to maintain records, by itself, can be
a violation of the pipeline safety regulations. See 49 C.F.R. § 192.619(f).
7 Post-hearing Submission, Exhibit 3.
8 Pipeline Safety: Verification of Records: ADB-2012-06, 77 Fed. Reg. 26,822, 26,823 (May 7, 2012) (“In general,
the only acceptable use of an affidavit would be as a complementary document, prepared and signed at the time of
the test or inspection by an individual who would have reason to be familiar with the test or inspection.”).
9 Post-hearing Submission, at 17.
10 Post-hearing Submission, at 18.
11 FGT suggested it established MAOP under other provisions of § 192.619(a) and that it is PHMSA’s burden to
demonstrate § 192.619(a)(3) is the lowest of the options in subparagraph (a). However, the absence of any one
calculation under § 192.619(a)(1)-(4) renders the whole analysis unsubstantiated. If the MAOP “established” under
§ 192.619(a)(3) cannot be verified or substantiated it cannot form the basis for a valid MAOP.



reflect uncertainty about whether it was intended to apply for purposes of subsection (a) or
subsection (c), that only reinforces the conclusion that it does not substantiate the establishment
of MAOP.
With respect to the consistency of this case with PHMSA’s position in prior proceedings, in the
above-referenced West Texas Gas proceeding the agency found that, “PHMSA must be able to
verify” that a pipeline was subjected to the pressure if MAOP was established under
§ 192.619(c). In West Texas Gas, the Acting Associate Administrator found that two single
documents, each with different MAOPs, were insufficient to establish MAOP because neither
number could be corroborated with other records.12 Similarly in the present case, FGT has failed
to provide any corroborating records (i.e., operating pressure records) that support the selection
of 713 psig on the MAOP Authorization Sheet. In fact, FGT suggested that 713 psig was
selected based on the design pressure, and not historical operating pressure.13 This uncertainty
supports finding this violation as PHMSA cannot verify how MAOP was established. This point
is further emphasized by FGT’s efforts spent speculating on what the prior operator may or may
not have reviewed in creating the MAOP Authorization Sheet.14
Similarly, in the El Paso Natural Gas Company, LLC proceeding, OPS alleged that the operator
failed to establish MAOP in accordance with § 192.619(a)(3). In the final order, the Associate
Administrator for Pipeline Safety found the operator in violation of 192.619(a)(3) for failing to
have records in support of its (pre-1970) MAOP establishment. Thus, the final order found the
operator in violation of § 192.619(a)(3) under the same charge as alleged here in this
proceeding.15 In both the West Texas Gas and El Paso proceedings cases, the operators had
established an MAOP using historical operating pressure, but could not provide any operating
pressure records to support that number. Thus, OPS is correct that its position in this case is
consistent with the outcome of both prior proceedings.
Finally, FGT argued that any allegation of non-compliance should have cited the MAOP
reconfirmation requirements in § 192.624 because it was a newer regulation and “obviated” the
provisions in § 192.619(c).16 FGT cited the above referenced El Paso proceeding as support for
its position that MAOP reconfirmation obviated section 192.619.17 Section 192.624 was
promulgated, in part, to address a congressional mandate in Section 23 of the 2011 Pipeline
Safety Act that “requires the verification of records for pipe in Class 3 and Class 4 locations, and
high consequence areas in Class 1 and Class 2 locations, to ensure they accurately reflect the
physical and operational characteristics of the pipelines and confirm the established MAOP of
12 West Texas Gas, Final Order, CPF No. 4-2004-1007, at 6 (Sept. 13, 2006).
13 Post-hearing Submission, at 18.
14 Id., at 17-18.
15 El Paso Natural Gas Company, LLC, Notice of Probable Violation, CPF No. 4-2019-1010, at 2 (Oct. 1, 2019).
16 Post-hearing Submission at 25; see Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP
Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments, 84 Fed. Reg. 52,180
(Oct. 1, 2019).
17 See El Paso Natural Gas Company, LLC, Final Order, CPF No. 4-2019-1010 (July 22, 2020).



the pipelines.”18 Section 192.624, however, is complementary to, but does not replace,
§ 192.619. MAOP reconfirmation instead reiterated the importance of verifiable documentation
to support MAOP establishment. Operators are required to establish MAOP under § 192.619
and then, if the criteria in § 192.624(a) are met, operators must reconfirm MAOP according to
that section. Nothing in the MAOP reconfirmation regulatory record suggests that this regulation
replaced the MAOP Establishment requirements.
19
Accordingly, after considering all of the evidence, I find that Respondent violated 49 C.F.R.
§ 192.619 by failing to establish a MAOP for its Sanford Lateral in accordance with
§ 192.619(a)(3).
Item 2: The Notice alleged that Respondent violated 49 C.F.R. § 192.917(a)(1), which states:
§ 192.917 How does an operator identify potential threats to pipeline
integrity and use the threat identification in its integrity program?
(a) Threat identification. An operator must identify and evaluate all
potential threats to each covered pipeline segment. Potential threats that an
operator must consider include, but are not limited to, the threats listed in
ASME/ANSI B31.8S (incorporated by reference, see § 192.7), section 2,
which are grouped under the following four categories:
(1) Time dependent threats such as internal corrosion, external
corrosion, and stress corrosion cracking;
The Notice alleged that Respondent violated 49 C.F.R. § 192.917(a)(1) by failing to identify and
evaluate all potential threats to each covered pipeline segment in its natural gas pipeline systems
in accordance with § 192.917(a)(1). Specifically, the Notice alleged that FGT failed to include
the Sanford Lateral as part of its stress corrosion cracking (SCC) program prior to the September
10, 2020 incident.
In its Response and at the hearing, FGT contested the allegation and explained that while it was
generally aware of the potential of SCC to be an integrity threat, after appropriate application of
the relevant factors it had insufficient reason to include the Sanford Lateral in its SCC program.
Respondent stated that the only indication of SCC on Sanford Lateral came after the September
10, 2020 incident when the post-incident metallurgical report was received.
20
As the basis for its allegation that the Sanford Lateral was required to have been included in
FGT’s SCC program, OPS stated that Respondent has 30 pipelines and 13 laterals in its SCC
program with pipe specifications it believed were similar to the Sanford Lateral, and that SCC
had been found on pipelines in the vicinity. Respondent strongly disagreed. Respondent’s
Director of Pipeline Integrity testified that the 30 pipelines and 13 laterals OPS mentioned are
not in fact the same as Sanford Lateral and that they have different seam type and coating,
18 84 Fed. Reg., at 52,234.
19 The MAOP Reconfirmation Rule made conforming changes to § 192.619 and revised the test pressure factors but
otherwise retained each provision. See id. Thus, FGT’s assertions that MAOP Reconfirmation replaced MAOP
Establishment is unsupported by the regulatory record.
20 Id., at 29-30.



different grade steel, different vintage (age), different manufacturer, and different wall thickness
and diameter. FGT correctly noted that just because one pipeline may have some of the same
characteristics as another does not automatically mean that all of them will be susceptible to
SCC. FGT argued that PHMSA’s inference that all of those pipelines are in the vicinity of the
Sanford Lateral was also incorrect and explained that some were hundreds of miles distant.21
With regard to OPS’ contention that, prior to the incident, the Sanford Lateral should have been
included in Respondent’s SCC program, FGT argued that the Sanford Lateral simply did not
meet the applicable criteria to be subjected to the program. Respondent’s Director of Pipeline
Integrity testified that its pipelines are evaluated for SCC all the time, and, had SCC been found
or had Sanford Lateral been determined to be susceptible to SCC, it would have been added to
the program, as occurred after the 2020 incident.22
Respondent noted that section 192.917(a), Threat Identification, directs operators to identify and
evaluate all potential threats to each covered pipeline segment, including but not limited to those
identified in ASME/ANSI B31.8S-2004 (B31.8S), section 2. Of the four categories established
in Section 192.917(a)(1)-(4), OPS alleged a violation of only subsection (1), “time dependent
threats such as internal corrosion, external corrosion, and stress corrosion cracking.”23 Section
2.3.3 of B31.8S, Risk Assessment, refers the reader to a prescriptive approach presented in
Appendix A. Section A3.3 of Appendix A provides that each segment should be assessed for
risk for the possible threat of SCC if all of the following criteria are present:
ASME B31.8S-2004 - SCC Threat Susceptibility Review
(a) Operating stress > 60% SMYS
(b) Operating temperature > 100o Fahrenheit
(c) Distance from compressor station ≤ 20 miles
(d) Age ≥ 10 years
(e) All corrosion coating systems other than fusion-bonded
epoxy (FBE).24
Respondent explained that the Sanford Lateral fails to meet three of those five criteria. The only
two criteria met are (d) age ≥ 10 years given that Sanford Lateral was constructed in 1959, and
(e) all corrosion coating systems other than fusion-bonded epoxy given that the greater
proportion of Sanford Lateral is coated with Polyken tape coating.25 With regard to the first of
21 Post-hearing Submission, at 30-31.
22 Id., at 31.
23 Id., at 27.
24 Case File Exhibit 5, PSVR Ex. C, ASME B31.8S, at 43 (PDF p. 176).



the three criteria that the Sanford Lateral does not meet, criterion (a) operating stress > 60%
SMYS, Respondent presented information showing that the Sanford Lateral operates at a
maximum stress level of 49% SMYS. Second, regarding criterion (b) operating temperature >
100o Fahrenheit, Respondent’s Vice President of Operations for the Southeast Division testified
that Sanford Lateral over the last six years has operated between 61 and 84 degrees Fahrenheit
and that this temperature range is typical for operating conditions on the Sanford Lateral.
Regarding criterion (c) distance from compressor station ≤ 20 miles, Respondent presented
information showing that the beginning of Sanford Lateral at the takeoff is approximately 39
miles from the upstream compressor station.26 Respondent is correct that B31.8S indicates that
only if “all” criteria of Section A3.3 of Appendix A are met is a segment “to be assessed for risk
of the possible threat of SCC” but only two were met27
While they are not mandatory criteria, B31.8S contains additional factors that an operator must
consider for determining whether a segment of pipeline is susceptible to the SCC threat. Those
are: (a) one or more service incidents was caused by either high pH SCC or near neutral pH
SCC; and (b) one or more hydrostatic test breaks or leaks was caused by one of the two types of
SCC. Respondent’s witnesses testified that no service incident was caused by either type of SCC
prior to the 2020 incident, and no hydrostatic test leaks or breaks were experienced on the
Sanford Lateral.28 B31.8S also requires an operator to consider previous SCC history.
Respondent showed that the only indication of SCC on Sanford Lateral came after the incident,
when the post-incident metallurgical report was received.29
Unlike a component widely known to have manufacturing defects that can be identified by an
operator in various ways, SCC is an issue that can take decades to develop and typically needs to
be confirmed by metallurgical analysis. As FGT correctly noted, many pipelines never
experience SCC at all. While OPS is correct that a pipeline operator is obligated to address the
potential for SCC on its pipelines, the issue to be determined here is whether a violation of the
code as it currently exists has been proven. Under circumstances in which a pipeline segment
has no history of SCC ever being identified and does not have substantially the same material
and operating characteristics as pipe that has been deemed susceptible to SCC,
30 OPS has the
burden of establishing that such a segment should have been treated as a SCC segment in a given
operator’s SCC program.
31 In this instance, the evidence presented by OPS fell short of meeting
25 Post-hearing Submission, at 28.
26 Id.
27 Id., at 29.
28 Id.
29 Id., at 29-30.
30 Respondent’s Director of Pipeline Integrity testified that the 30 pipelines and 13 laterals OPS mentioned are not
in fact the same as Sanford Lateral and that they have different seam type and coating, different grade steel, different
vintage (age), different manufacturer, and different wall thickness and diameter.
31 Of course, now that near-neutral pH SCC has been identified in connection with FGT’s analysis of the September
10, 2020 incident, Respondent is not disputing the need to include the Sanford Lateral in its SCC program going
forward.



that burden.
Accordingly, after considering all of the evidence, I find that OPS did not establish that
Respondent was out of compliance with the cited regulation. Based upon the foregoing, I hereby
order that Item 2 be withdrawn.
Item 3: The Notice alleged that Respondent violated 49 C.F.R. § 192.937(c)(1), which states:
§ 192.937 What is a continual process of evaluation and assessment to
maintain a pipeline’s integrity?
(a) …
(c) Assessment methods. In conducting the integrity reassessment, an
operator must assess the integrity of the line pipe in the covered segment by
any of the following methods as appropriate for the threats to which the
covered segment is susceptible (see § 192.917), or by confirmatory direct
assessment under the conditions specified in § 192.931.
(1) Internal inspection tool or tools capable of detecting corrosion, and
any other threats to which the covered segment is susceptible. An operator
must follow ASME/ANSI B31.8S (ibr, see § 192.7), section 6.2 in selecting
the appropriate internal inspection tools for the covered segment.32
The Notice alleged that Respondent violated 49 C.F.R. § 192.937(c)(1) by failing to follow
B31.8S, section 6.2 in selecting the appropriate internal inspection tools for each covered
segment. Specifically, the Notice alleged that although the Sanford Lateral consisted largely of
low-frequency electric-resistance welded (LF-ERW) pipe manufactured by Youngstown Sheet &
Tube of 1959 vintage known to be susceptible to axial seam defects, FGT used an in-line
inspection (ILI) tool for its ILI runs in 2014 and 2019 that was designed primarily to evaluate
circumferential defects rather than axial defects.
In its Response and at the hearing, FGT contested the allegation and argued that although the
Sanford Lateral largely did consist of LF-ERW pipe, no assessment for this threat was prompted
by 49 C.F.R. § 192.937(c)(1).
33 FGT argued that the cited regulation should be read together
with § 192.917(e)(4).
34 This provision states that if a covered pipeline segment contains LF-
ERW pipe, lap welded pipe, or other conditions specified in B31.8S, Appendices A4.3 and A4.4,
any covered or noncovered segment in the pipeline system with such pipe must have experienced
a pressure increase over MAOP or a seam integrity failure during the preceding five years in
32 Section 192.937(c) and (d) were amended on October 1, 2019, after FGT conducted its 2014 and 2019 ILIs.
33 Post-hearing Submission, at 37-38.
34 OPS disagreed, noting that § 192.917(a) outlines the process operators must follow to determine which threats
their pipelines are susceptible to. However, section 192.917(e)(4) sets forth specific actions an operator must take to
address known issues with ERW pipe. Section 192.917(e)(4) does not prescribe an exclusive list of criteria for use
in determining appropriate assessment tools. OPS maintained that the Notice alleged that FGT failed to use
appropriate assessment methods, it did not allege that FGT failed to take one of the specific actions listed in
§ 192.917(e)(4).



order for an operator to be required to select an assessment technology capable of detecting and
measuring longitudinal seam defects.
35 Respondent argued that the Sanford Lateral had not
experienced such a pressure increase or a seam integrity failure prior to the 2019 tool run and as
a result, its LF-ERW pipe was not considered susceptible to failure and use of an ILI tool with
axial capability in 2019 was not required. OPS disagreed and stated that there was a history of
seam integrity failures on Respondent’s system including an actionable axial seam defect
identified in 2014 on the Sanford Lateral.
The axial seam failure threat posed by older LF-ERW pipe, has been a safety issue in the natural
gas and hazardous liquid pipeline industry for decades due to the known occurrence of
manufacturing defects or inclusions in the weld seam. A widely-referenced report on the
integrity threat presented by LF-ERW pipe discusses the types of inclusions in older LF-ERW
pipe that make the material susceptible and states that “The likely causes of seam failures that
could necessitate a seam-integrity assessment are pressure cycle-induced fatigue and selective
(grooving) corrosion of the bondline region of the seam.36 OPS has consistently identified LF-
ERW pipe as being subject to failures in the longitudinal seam because of manufacturing defects.
Pipeline accidents involving seam failures can be much more serious than failures involving
smaller leaks because a failed seam can propagate longitudinally for some distance along the
pipe and blow-out a large rupture of the pipeline resulting in a large volume of flammable
product being released. OPS issued Alert Notices on January 28, 1988, and again on March 8,
1989, to inform pipeline operators of the problem. Failures of the longitudinal seam of the pipe
have been caused by the growth over time of manufacturing defects in the LF-ERW seams. As
summarized in the CAO:
PHMSA has issued Advisory Bulletins on the safety risks of Low-
Frequency Welded ERW and Flash-welded Pipe manufactured prior to
1970. It also issued Alert Notice, ALN-88-01, in January 1988, advising
owners and operators of natural gas and hazardous liquids pipelines to
consider the threat from ERW pipe manufactured prior to 1970. The
operators were advised to determine whether their pipelines were
susceptible to ERW seam failures and address the potential impact on
pipeline integrity.37
35 Section 192.917(e)(4) states, in relevant part, “Electric Resistance Welded (ERW) pipe. If a covered pipeline
segment contains low frequency ERW pipe, lap welded pipe, pipe with longitudinal joint factor less than 1.0 as
defined in § 192.113, or other pipe that satisfies the conditions specified in ASME/ANSI B31.8S, Appendices A4.3
and A4.4, and any covered or non-covered segment in the pipeline system with such pipe has experienced seam
failure (including seam cracking and selective seam weld corrosion), or operating pressure on the covered segment
has increased over the maximum operating pressure experienced during the preceding 5 years (including abnormal
operation as defined in § 192.605(c)), or MAOP has been increased, an operator must select an assessment
technology or technologies with a proven application capable of assessing seam integrity and seam corrosion
anomalies.”
36 See PHMSA, Low Frequency ERW and Lap Welded Longitudinal Seam Evaluation (Apr. 2004), available online
at https://www.phmsa.dot.gov/pipeline/gas-transmission-integrity-management/low-frequency-erw-and-lap-welded-
longitudinal-seam-evaluation, at page 1; Post-Hearing Brief, at 60.
37 Florida Gas Transmission Company, Amended Corrective Action Order, CPF No. 4-2020-008-CAO, at 4 (Oct. 1,
2020).



In determining susceptible threats, an operator is required to consider its prior history and
internal inspection records.38 Prior to the 2019 tool run, FGT has experienced axial seam issues
on the 15.9-mile length of the Sanford Lateral as well as on the larger 654-mile FGT pipeline
unit of which the Sanford Lateral is a part. With respect to the Sanford Lateral, FGT’s 2014 ILI
run identified an anomaly that was found to be selective seam weld corrosion, a type of axial
defect.39 As stated in the CAO:
The operator reported that it performed ILI runs of the Sanford Lateral
in 2014 and 2019. ILI correlation data from these runs show corrosion
growth rates as high as 17 thousandths of an inch per year. The 2019 ILI
run had a large amount of corrosion indications in the vicinity of rupture,
many over forty percent (40%).
Most of the pipeline ROW appears to be located in swamp areas with
heavy vegetation along its borders, making the 12-inch line more
susceptible to active external corrosion than other locations.40
Moreover, FGT remediated such defects in 2015.41 According to the Root Cause Failure
Analysis (RCFA):
2015: Integrity digs are performed in response to the 2014 ILI run, none
of these digs were within the Black Bear Wilderness Area. One as-found
anomaly is classified as selective seam weld corrosion (SSWC), however
contrary to an understood practice at that time (but not procedurally or best-
practice documented), no hydrostatic test was performed on the line. Instead
this anomaly was remediated with a Class B sleeve. (105, 109, interviews)
There were three anomaly digs in total with repairs made on all three.42
The 2014 ILI results and the 2015 sleeve installation to repair the identified failure of axial seam
integrity occurred within the five-year period preceding the 2019 ILI tool run and was sufficient
to trigger the requirement to change the 2019 tool selection to one that reliably detects axial
defects such as selective seam corrosion. However, FGT did not change the tool selection.
Instead, in 2019 FGT used a tool that, according to section 6.2 of B31.8S, is “not reliable” for
detecting the types of axial defects identified and addressed in 2014-2015.43
With regard to the larger 654-mile FGT pipeline unit of which the Sanford Lateral is a part, FGT
38 49 C.F.R. § 192.917(b) (Apr. 6, 2004).
39 Root Cause Failure Analysis (RCFA), at 13; PHMSA Violation Report, Exhibit B, at page 32.
40 Florida Gas Transmission Company, Amended Corrective Action Order, CPF No. 4-2020-008-CAO, at 3 (Oct. 1,
2020).
41 RCFA, at 13; PHMSA Violation Report, Exhibit B, at page 32.
42 Id.
43 Recommendation, at 13.



has experienced LF-ERW seam failures as well. For example, on May 4, 2009, Respondent’s
18-inch line also composed of LF-ERW pipe of the same vintage and manufacture as the Sanford
Lateral pipe experienced an axial seam rupture along the Florida Turnpike near a high school
resulting in the ejection of a 113-foot long section of pipe.44 On December 26, 2012,
Respondent’s 20-inch line also composed of LF-ERW pipe of the same vintage and manufacture
as the Sanford Lateral pipe experienced an axial seam rupture near Melbourne, Florida resulted
in the ejection of an approximately 20-foot long section of pipe.
45 While there is no allegation
that these failures involved regulatory violations, and these failures did not occur on the 12-inch
portion of the 15.9 mile Sanford Lateral, operators generally apply their system-wide experience
with LF-ERW in making decisions about ILI tools. Integrity management is intended to address
systemic risk and prevent failures before they occur. In the absence of a systemic approach,
unfortunately an operator may wait for the LF-ERW seam to fail on each individual pipe section
putting the public at risk which would be inconsistent with the nature and purpose of the integrity
management regulations. In other words, it goes without saying that an operator would treat LF-
ERW pipeline as susceptible to failure after a seam failure. Saying that available means to detect
a known manufacturing defect need not be used until after a seam failure occurs would render
the regulations pointless. At a minimum, the system’s LF-ERW history should have been data
points that, together with the 2014 ILI results and the 2015 sleeve installation, informed FGT
when it made its decision not to change ILI tools when it conducted its 2019 tool run.
FGT then argued that even if it had used a tool designed to detect axial defects such as the MFL-
C, it was not a certainty that the defect associated with the September 10, 2020 incident would
have been identified. Under section 192.937(c)(1), FGT is required to use an “appropriate
internal inspection tool” that is “capable of detecting corrosion, and any other threats to which
the covered segment is susceptible.” In selecting this tool, “operator[s] must follow
ASME/ANSI B31.8S (ibr, see § 192.7), section 6.2.” Section 6.2.1(e) of B31.8S states that
MFL-C “is more sensitive to axially aligned metal-loss defects.” Conversely, section 6.2.1(a)
states that MFL-A is “not reliable for detection or sizing of axially aligned metal-loss defects.”
Thus, the MFL-C tool should have been selected for its increased sensitivity and likelihood of
detecting axial defects despite the fact that there are no absolute guarantees that any individual
defect will be identified.
Based on the preponderance of the evidence that the results of the 2014 ILI results led to the
2015 sleeve installation to repair a failure of axial seam integrity, I find, in accordance with
B31.8S, that MFL-C was the appropriate and more reliable tool to detect axial defects in future
ILI runs on the covered segments of the Sanford Lateral. Therefore, I find that FGT should have
selected and used the MFL-C or other ILI tool with similar axial capability for the 2019 ILI tool
run.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 C.F.R.
§ 192.937(c)(1) by failing to follow ASME/ANSI B31.8S, section 6.2 in selecting the
44 Florida Gas Transmission Company, Corrective Action Order, CPF No. 2-2009-1002H (May 7, 2009).
45 Florida Gas Transmission Company, Corrective Action Order, CPF No. 2-2012-1005H (Dec. 28, 2012). FGT
apparently experienced another LF-ERW rupture in 2014 in Port St. John, Florida.



appropriate internal inspection tools for the 2019 tool run.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$200,000 per violation for each day of the violation, up to a maximum of $2,000,000 for any
related series of violations.46
In determining the amount of a civil penalty under 49 U.S.C. § 60122 and 49 C.F.R. § 190.225, I
must consider the following criteria: the nature, circumstances, and gravity of the violation,
including adverse impact on the environment; the degree of Respondent’s culpability; the history
of Respondent’s prior offenses; any effect that the penalty may have on its ability to continue
doing business; the good faith of Respondent in attempting to comply with the pipeline safety
regulations; and self-disclosure or actions to correct a violation prior to discovery by PHMSA.
In addition, I may consider the economic benefit gained from the violation without any reduction
because of subsequent damages, and such other matters as justice may require. The Notice
proposed a total civil penalty of $834,400 for the violations cited above.
Item 1: The Notice proposed a civil penalty of $46,600 for Respondent’s violation of 49 C.F.R.
§ 192.619(a)(3), for failing to establish a MAOP for its Sanford Lateral in accordance with
§ 192.619(a)(3).
Respondent argued that the proposed civil penalty amount in the Notice for Item 1 should be
reduced or eliminated. With respect to the nature, circumstances, and gravity of this violation,
ensuring the MAOP of a gas pipeline was properly established and supported by traceable and
verifiable records is a key part of safe operations because MAOP has direct impact on pipeline
stresses. OPS’ experiences with pipeline accidents nationwide has shown the importance of
MAOP verification to an operator’s ability to safely operate a pipeline. With respect to
culpability, the proposed penalty amount in the Notice was at the low end of the range and did
not reflect any heightened level of egregiousness or deliberate decision not to comply. As to
good faith, Respondent presented no circumstances beyond its control that would have prevented
it from complying. Therefore, there is no justification for a good faith or other matters as justice
may require credit.
With respect to the statute of limitations, the calculation of the civil penalty did not violate the
statute of limitations because the Notice alleged a violation of § 192.619(a)(3) that was not cured
until late 2020 when a hydrostatic test was conducted. Therefore, the violation last occurred in
2020, well within the five-year period preceding issuance of the Notice and commencement of
the case.
While PHMSA’s statute and regulations do not constrain it in this way, PHMSA’s practice has
46 These amounts are adjusted annually for inflation. See 49 C.F.R. § 190.223 for adjusted amounts.



been to apply the statutory maximum penalty limits applicable on the most recent date of the
violation, as indicated in Part E5 of the Pipeline Safety Violation Report.47 Thus, the statutory
maximum penalty limit is selected based on “the most recent date listed on the violation report”
and not when the violation started or was discovered. This is a reasonable approach to penalty
calculations. Compliance was restored when FGT ran a hydrotest under the terms of the CAO to
establish its MAOP.
Respondent has presented no information or arguments that would warrant a reduction of the
proposed civil penalty amount in the Notice for this item. I find that the record supports the civil
penalty amount proposed in the Notice. Accordingly, having reviewed the record and considered
the assessment criteria, I assess Respondent a civil penalty of $46,600 for violation of 49 C.F.R.
§ 192.619(a)(3).
Item 2: The Notice proposed a civil penalty of $362,800 for Respondent’s alleged violation of
49 C.F.R. § 192.917(a)(1). Since this alleged violation has been withdrawn, the proposed
penalty is not assessed.
Item 3: The Notice proposed a civil penalty of $425,000 for Respondent’s violation of 49
C.F.R. § 192.937(c)(1), for failing to follow ASME/ANSI B31.8S, section 6.2 in selecting the
appropriate internal inspection tools for each covered segment.
Respondent argued that the proposed civil penalty amount in the Notice for Item 3 should be
reduced or eliminated. With respect to the nature and circumstances of this violation, an
operator with LF-ERW pipe in its system is obligated to make sound risk management program
decisions including decisions about the capability of the ILI tools they select to detect the types
of defects that it has reason to believe may be present. With respect to gravity, FGT argued that
its failure to use an ILI tool with axial capability in 2019 was not a causal factor in the
September 10, 2020 incident. However, I find that Respondent’s failure to use the appropriate
assessment method was a causal factor in the failure because the rupture occurred in the
longitudinal seam and FGT failed to use the appropriate tool in 2019 to address longitudinal
seam failure, an axial defect.48 As discussed above, an MFL-C tool is more sensitive to this type
of defect and therefore more likely to detect it whereas the tool used was unreliable for this
purpose. With respect to culpability, the proposed penalty amount in the Notice did not reflect
any heightened level of egregiousness or deliberate decision not to comply. As to good faith,
Respondent presented no circumstances beyond its control that would have prevented it from
complying. Therefore, there is no justification for a good faith or other matters as justice may
require credit.
Respondent questioned whether the civil penalty amount proposed in the Notice for Item 3 was
consistent with the five-year statute of limitations in 28 U.S.C. 2462 and correctly pointed out
that the Notice alleged that both the 2014-2015 ILI tool run and sleeve repair and the 2019 ILI
tool run failed to comply with the requirement that the tool be capable of detecting axial seam
defects as two instances of violation. With respect to the number of instances of violation for
47 See 49 U.S.C. § 60122(a); 49 C.F.R. § 190.223.
48 RCFA, at 4.



Item 3, I agree with Respondent that only the 2019 ILI run should be considered in the penalty
calculation, not the 2014-2015 ILI tool run and sleeve repair. OPS also ended up acknowledging
that only the 2019 tool run constituted an instance of violation within the five-year period
preceding issuance of the Notice, and the Director agreed that the 2014-1015 events were simply
part of the fact pattern.
Accordingly, having reviewed the record and considered the assessment criteria, based upon the
foregoing, I assess Respondent a reduced civil penalty of $362,800 for one instance of violation
of 49 C.F.R. § 192.937(c)(1).
Constitutional/Due Process Arguments
FGT’s written submissions in this matter go on to make a litany of assertions regarding due
process and the fairness of the PHMSA’s regulations governing its enforcement procedures and
its authority to use informal administrative proceedings to assess civil penalties for violations.
PHMSA agrees Federal governmental agencies must act within the scope of the Constitution in
carrying out their statutory duties, and PHMSA has complied with all applicable Constitutional
requirements in this proceeding. Notably, the U.S. Court of Appeals for the Sixth Circuit
recently issued a decision on June 2, 2023, denying a pipeline operator’s petition for review of a
PHMSA pipeline safety enforcement civil penalty matter.49 In that case, the Court upheld
PHMSA’s assessment of civil penalties in a contested pipeline safety enforcement case, in which
a hearing was also held, under the same procedural statutes and regulations which govern here.50
That decision underscores the archetype that DOT’s safety enforcement agencies, including
PHMSA, have long carried out their statutory duties. PHMSA follows the enforcement regime
set forth by Congress at 49 U.S.C. 60122 and codified at 49 C.F.R. Part 190. These statutory
safety enforcement processes continue in lawful operation today.
With regard to PHMSA’s enforcement procedures generally, FGT argued that the case file
provided by OPS prior to the hearing failed to comply with 49 U.S.C. § 60117(b)(1)(C) and
violates due process. I disagree. Section 60117(b)(1)(C) requires PHMSA to ensure its
enforcement procedures state that the case file “include all agency records pertinent to the
matters of fact and law asserted.” PHMSA not only has compliant enforcement procedures but
also a regulation at § 190.209 that defines the case file to include the notice of probable
violation, violation report (including exhibits), all materials submitted by a respondent, hearing
materials, and the Region Director’s recommendation. PHMSA enforcement procedures define
the case file and affirm that it includes all agency records pertinent to the matters of fact and law
asserted.51 In other words, PHMSA’s regulation and procedures comply with § 60117(B)(1)(C)
and the 2020 PIPES Act, which did not expand the scope of the case file but reaffirmed the
existing scope. Further PHMSA’s authorizing statutes and the corresponding regulations issued
thereunder provide for checks and controls in order to comply with the APA, not the least of
49 See Wolverine Pipe Line Company v. DOT, PHMSA, Case No. 21-3405 (6th Cir., June 2, 2023); available online
at https://www.govinfo.gov/content/pkg/USCOURTS-ca6-21-03405/pdf/USCOURTS-ca6-21-03405-0.pdf.
50 Id.
51 See PHMSA, Pipeline Safety Enforcement Procedures: Section 4, at 19 n.4 (Dec. 9, 2022), available online at
https://www.phmsa.dot.gov/regulatory-compliance/pipeline/enforcement/section-4-administrative-enforcement-
processes.



which is notice and comment on regulations, separation of functions, and the ability to seek
judicial review of various agency actions.
Finally, FGT contended the case file did not comply with § 60117(b)(1)(C) and due process, in
part,52 because PHMSA did not provide upon request the Proposed Civil Penalty Worksheet in
Excel format, even though the Southwest Region provided the Proposed Civil Penalty Worksheet
in PDF form. The PDF worksheet provides a detailed chart with point values applied to each
selected civil penalty assessment factor. These point values correspond to the civil penalty
assessment factors PHMSA is required to consider.53 Those factors are further defined in the
Violation Report, which FGT received a copy of. FGT was also provided the Civil Penalty
Summary document which provides civil penalty ranges for each statutory assessment factor.54
Combined, these documents provide a clear and reasoned basis for PHMSA’s calculation of the
proposed civil penalties. By reading these documents, Respondent knows for example the
culpability level associated with the initially proposed penalty amount and points that were
assigned to each penalty factor and can see how they add up to the total number of points
corresponding to the final proposed penalty amount for each violation. As such, FGT is able to
understand, and in fact has made numerous arguments to mitigate, the proposed civil penalties
under the penalty assessment factors. While FGT claimed that the “per-point values” are
obscured within the Excel spreadsheet, PHMSA notes that FGT has identified and made
arguments concerning the “per-point values” based on the documents in its possession.55
Finally, it is worth noting that because Respondent’s arguments were in fact persuasive to a
significant extent such that Item 2 was withdrawn entirely and Item 3 was reduced from two
instances of violation to one. The final penalty amount ended up being less than half of the total
amount initially proposed in the Notice. This is itself indicative of the fairness of PHMSA’s
enforcement program, Respondent’s ability to present its case during the informal hearing
process, and the degree of transparency in how the civil penalties were assessed. Therefore,
FGT’s arguments that it is denied due process without the Excel version of the Proposed Civil
Penalty Worksheet are without merit.
In summary, having reviewed the record and considered the assessment criteria for each of the
Items cited above, I assess Respondent a total civil penalty of $409,400.
Payment of the civil penalty must be made within 20 days after receipt of this Final Order.
Federal regulations (49 C.F.R. § 89.21(b)(3)) require such payment to be made by wire transfer
through the Federal Reserve Communications System (Fedwire), to the account of the U.S.
Treasury. Detailed instructions are contained in the enclosure. Questions concerning wire
52 With respect to FGT’s discussion of other documents not in the case file, the Southwest Region emphasizes that
the case file includes all necessary evidence to sustain each allegation of violation and complies with 49 C.F.R.
§ 190.209.
53 See 49 U.S.C. § 60122.
54 See PHMSA, Civil Penalty Summary (Jan. 23, 2023), available online at
https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/2023-01/Civil-Penalty-Summary-01-23-2023.pdf.
55 Post-Hearing Brief, at 68.



transfers should be directed to: Financial Operations Division (AMK-325), Federal Aviation
Administration, Mike Monroney Aeronautical Center, 6500 S MacArthur Blvd, Oklahoma City,
Oklahoma 79169. The Financial Operations Division telephone number is (405) 954-8845.
Failure to pay the civil penalty will result in accrual of interest at the current annual rate in
accordance with 31 U.S.C. § 3717, 31 C.F.R. § 901.9 and 49 C.F.R. § 89.23. Pursuant to those
same authorities, a late penalty charge of six percent (6%) per annum will be charged if payment
is not made within 110 days of service. Furthermore, failure to pay the civil penalty may result
in referral of the matter to the Attorney General for appropriate action in a district court of the
United States.
Under 49 C.F.R. § 190.243, Respondent may submit a Petition for Reconsideration of this Final
Order to the Associate Administrator, Office of Pipeline Safety, PHMSA, 1200 New Jersey
Avenue, SE, East Building, 2nd Floor, Washington, DC 20590, with a copy sent to the Office of
Chief Counsel, PHMSA, at the same address. The written petition must be received no later than
20 days after receipt of the Final Order by Respondent. Any petition submitted must contain a
brief statement of the issue(s) and meet all other requirements of 49 C.F.R. § 190.243. The filing
of a petition automatically stays the payment of any civil penalty assessed. The other terms of
the order, including any corrective action, remain in effect unless the Associate Administrator,
upon request, grants a stay. If Respondent submits payment of the civil penalty, the Final Order
becomes the final administrative decision and the right to petition for reconsideration is waived.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
May 21, 2024
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/42022032NOPV>
- Source ID: `phmsa-enforcement`
- SHA-256: `8caf336ab74ad6566ab19473d103f40c8a5e1a1bae7c478d423c14f96bbdad44`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-23T22:03:07.435Z
- Document slug: `phmsa-enforcement-42022032nopv`

### Source metadata

```json
{
  "cpf": "42022032NOPV",
  "operator": "FLORIDA GAS TRANSMISSION CO",
  "region": "Southwest",
  "pipelineType": "INTERSTATE GAS TRANSMISSION",
  "caseStatus": "OPEN",
  "citedSections": [
    "192.619(a)(3)",
    "192.917(a)(1)",
    "192.937(c)(1)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 12,
  "attachments": [
    {
      "name": "42022032NOPV_Final Order_05212024_(20-190995).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_Final%20Order_05212024_(20-190995).pdf",
      "bytes": 350652,
      "category": "agency_document"
    },
    {
      "name": "42022032NOPV_Final Order_05212024_(20-190995)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_Final%20Order_05212024_(20-190995)_text.pdf",
      "bytes": 318890,
      "category": "agency_document"
    },
    {
      "name": "42022032NOPV_Florida Gas Transmission v PHMSA Petition for Review of an Order_05202026_(20-190995).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_Florida%20Gas%20Transmission%20v%20PHMSA%20Petition%20for%20Review%20of%20an%20Order_05202026_(20-190995).pdf",
      "bytes": 258481,
      "category": "party_submission"
    },
    {
      "name": "42022032NOPV_Operator Post-Hearing Submission_04212023_(20-190995).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_Operator%20Post-Hearing%20Submission_04212023_(20-190995).pdf",
      "bytes": 430758,
      "category": "case_document"
    },
    {
      "name": "42022032NOPV_Operator Pre-Hearing Submission_03142023_(20-190995).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_Operator%20Pre-Hearing%20Submission_03142023_(20-190995).pdf",
      "bytes": 702050,
      "category": "case_document"
    },
    {
      "name": "42022032NOPV_Operator RfH and Statement of Issues_09302022_(20-190995).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_Operator%20RfH%20and%20Statement%20of%20Issues_09302022_(20-190995).pdf",
      "bytes": 446121,
      "category": "case_document"
    },
    {
      "name": "42022032NOPV_Operator RtN and Statement of Issues_09302022_(20-190995).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_Operator%20RtN%20and%20Statement%20of%20Issues_09302022_(20-190995).pdf",
      "bytes": 372934,
      "category": "case_document"
    },
    {
      "name": "42022032NOPV_Operator to PHC - External Petition for Review_08162024_(20-190995).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_Operator%20to%20PHC%20-%20External%20Petition%20for%20Review_08162024_(20-190995).pdf",
      "bytes": 405722,
      "category": "party_submission"
    },
    {
      "name": "42022032NOPV_PCP_07222022_(20-190995).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_PCP_07222022_(20-190995).pdf",
      "bytes": 358126,
      "category": "case_document"
    },
    {
      "name": "42022032NOPV_PCP_07222022_(20-190995)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_PCP_07222022_(20-190995)_text.pdf",
      "bytes": 175436,
      "category": "case_document"
    },
    {
      "name": "42022032NOPV_PHC Hearing Scheduled_11012022_(20-190995).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_PHC%20Hearing%20Scheduled_11012022_(20-190995).pdf",
      "bytes": 196459,
      "category": "agency_document"
    },
    {
      "name": "42022032NOPV_PHC Hearing Scheduled_11012022_(20-190995)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42022032NOPV/42022032NOPV_PHC%20Hearing%20Scheduled_11012022_(20-190995)_text.pdf",
      "bytes": 8711,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "FLORIDA GAS TRANSMISSION CO"
}
```