CLOSED notice of probable violation citing 193.2637.

## Document text

Notice of Probable Violation involving EAGLE LNG PARTNERS JACKSONVILLE II LLC. PHMSA's enforcement data identifies the cited regulation as 193.2637. The case was opened on 2024-08-29 and is reported as closed as of 2025-05-15. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

42024042NOPV_Closure Letter_05152025_(23-267234).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42024042NOPV/42024042NOPV_Closure%20Letter_05152025_(23-267234).pdf

42024042NOPV_Closure Letter_05152025_(23-267234)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42024042NOPV/42024042NOPV_Closure%20Letter_05152025_(23-267234)_text.pdf

42024042NOPV_Final Order_11132024_(23-267234).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42024042NOPV/42024042NOPV_Final%20Order_11132024_(23-267234).pdf

42024042NOPV_Final Order_11132024_(23-267234)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42024042NOPV/42024042NOPV_Final%20Order_11132024_(23-267234)_text.pdf

42024042NOPV_Operator Response to Notice_09292024_(23-267234).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42024042NOPV/42024042NOPV_Operator%20Response%20to%20Notice_09292024_(23-267234).pdf

42024042NOPV_PCO_08292024_(23-267234).pdf: https://primis.phmsa.dot.gov/enforcement-documents/42024042NOPV/42024042NOPV_PCO_08292024_(23-267234).pdf

42024042NOPV_PCO_08292024_(23-267234)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/42024042NOPV/42024042NOPV_PCO_08292024_(23-267234)_text.pdf

42024042NOPV_Closure Letter_05152025_(23-267234)_text.pdf

VIA ELECTRONIC MAIL TO: seanlalani@eaglelng.com
May 15, 2025
Mr. Sean Lalani
President
Eagle LNG Partners, LLC
Research Forest Lakeside No. 4
2445 Technology Forest Blvd, Suite 500,
The Woodlands, TX 77381
RE: CPF 4-2024-042-NOPV
Dear Mr. Lalani:
On November 13, 2024, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued Eagle LNG Partners, LLC (Eagle LNG), a Final Order in the above-referenced case. This
Order included a Compliance Order. Based on our review of the documentation you provided, it
has been determined that Eagle LNG has complied with the terms of this Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Bryan Lethcoe
Director, Southwest Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Tim Robertson, Director, Operations, Eagle LNG Partners, LLC,
timrobertson@eaglelng.com

42024042NOPV_Final Order_11132024_(23-267234)_text.pdf

November 13, 2024
VIA ELECTRONIC MAIL TO: seanlalani@eaglelng.com
Mr. Sean Lalani
President
Eagle LNG Partners LLC
Research Forest Lakeside No. 4
2445 Technology Forest Blvd., Suite 500
The Woodlands, Texas 77381
Re: CPF No. 4-2024-042-NOPV
Dear Mr. Lalani:
Enclosed please find the Final Order issued in the above-referenced case to Eagle LNG Partners
LLC. It makes a finding of violation and specifies actions that need to be taken to comply with
the pipeline safety regulations. When the terms of the compliance order are completed, as
determined by the Director, Southwest Region, this enforcement action will be closed. Service of
the Final Order by e-mail is effective upon the date of transmission and acknowledgement of
receipt as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Bryan Lethcoe, Director, Southwest Region, Office of Pipeline Safety, PHMSA
Mr. Tim Robertson, Director of Operations, Eagle LNG Partners LLC,
timrobertson@eaglelng.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Eagle LNG Partners LLC, ) CPF No. 4-2024-042-NOPV
)
)
)
Respondent. )
___________________________________ )
FINAL ORDER
On August 29, 2024, pursuant to 49 C.F.R. § 190.207, the Director, Southwest Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation and Proposed Compliance Order
(Notice) to Eagle LNG Partners LLC (Respondent).1 The Notice proposed finding that
Respondent had violated the pipeline safety regulations in 49 C.F.R. Part 193. The Notice also
proposed certain measures to correct the violations. Respondent did not contest the allegations
of violation or corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 193.2637 (Item 1) ─ Respondent failed to take prompt corrective or
remedial action whenever an operator learns by inspection or otherwise that
atmospheric, external, or internal corrosion is not controlled as required by this
Part 193, Subpart G.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
Compliance Actions
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violation. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
1 The pipeline inspected is operated by Eagle LNG Partners Jacksonville II, LLC, a subsidiary of Eagle LNG
Partners, LLC, https://www.energy.gov/sites/default/files/2023-
01/Eagle%20LNG%20DOE%20Application%20Final.pdf.



of the ordered actions, Respondent may request that the Director close the case. Failure to
comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223
or in referral to the Attorney General for appropriate relief in a district court of the United States.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
November 13, 2024
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/42024042NOPV>
- Source ID: `phmsa-enforcement`
- SHA-256: `8b81f4b5c22c6b3e021e187af5e57af9d72dc2daa089aa8f5df44ab7ddf3509a`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-24T16:31:12.231Z
- Document slug: `phmsa-enforcement-42024042nopv`

### Source metadata

```json
{
  "cpf": "42024042NOPV",
  "operator": "EAGLE LNG PARTNERS JACKSONVILLE II LLC",
  "region": "Southwest",
  "pipelineType": "INTRASTATE LNG",
  "caseStatus": "CLOSED",
  "citedSections": [
    "193.2637"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 7,
  "attachments": [
    {
      "name": "42024042NOPV_Closure Letter_05152025_(23-267234).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42024042NOPV/42024042NOPV_Closure%20Letter_05152025_(23-267234).pdf",
      "bytes": 233978,
      "category": "agency_document"
    },
    {
      "name": "42024042NOPV_Closure Letter_05152025_(23-267234)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42024042NOPV/42024042NOPV_Closure%20Letter_05152025_(23-267234)_text.pdf",
      "bytes": 84334,
      "category": "agency_document"
    },
    {
      "name": "42024042NOPV_Final Order_11132024_(23-267234).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42024042NOPV/42024042NOPV_Final%20Order_11132024_(23-267234).pdf",
      "bytes": 279659,
      "category": "agency_document"
    },
    {
      "name": "42024042NOPV_Final Order_11132024_(23-267234)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42024042NOPV/42024042NOPV_Final%20Order_11132024_(23-267234)_text.pdf",
      "bytes": 128917,
      "category": "agency_document"
    },
    {
      "name": "42024042NOPV_Operator Response to Notice_09292024_(23-267234).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42024042NOPV/42024042NOPV_Operator%20Response%20to%20Notice_09292024_(23-267234).pdf",
      "bytes": 177156,
      "category": "party_submission"
    },
    {
      "name": "42024042NOPV_PCO_08292024_(23-267234).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42024042NOPV/42024042NOPV_PCO_08292024_(23-267234).pdf",
      "bytes": 297444,
      "category": "case_document"
    },
    {
      "name": "42024042NOPV_PCO_08292024_(23-267234)_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/42024042NOPV/42024042NOPV_PCO_08292024_(23-267234)_text.pdf",
      "bytes": 139726,
      "category": "case_document"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "EAGLE LNG PARTNERS JACKSONVILLE II LLC"
}
```