# CENEX PIPELINE LLC — Notice of Probable Violation

**Citation:** CPF 520035012  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2003-06-03

CLOSED notice of probable violation citing 195.401(a), 195.404(a), 195.410(a)(1), 195.420(a), 195.422(b), 195.428(a), 195.442(a), 195.567(b)(1), 195.571.

## Document text

Notice of Probable Violation involving CENEX PIPELINE LLC. PHMSA's enforcement data identifies the cited regulations as 195,  195.401(a),  195.404(a),  195.410(a)(1),  195.420(a),  195.422(b),  195.428(a),  195.442(a),  195.567(b)(1),  195.571. The case was opened on 2003-06-03 and is reported as closed as of 2005-06-21. Proposed civil penalty: $25,000. Assessed civil penalty: $25,000. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520035012_final order_06212005.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520035012/520035012_final%20order_06212005.pdf

CENEX HARVEST (520035012).pdf: https://primis.phmsa.dot.gov/enforcement-documents/520035012/CENEX%20HARVEST%20(520035012).pdf

520035012_final order_06212005.pdf

u.s. Deportment
of Transportation
Plpelln. and
HazardOus Mm.rtall safety
Admlnlltratton
400 ~-;:; s.w.
;.~.. D.c. ~
JUN 2 1 ax1J
Dan Knepper
Vice President, Energy
Operations
Cmex Harvest
803 Highway 212 South
Laure ~ MT 5 9044
Rc: CPF No. S.2003.SO12
Dear Mr.
Knepper:
Enclosed is the Final Order issued by the Associate Administrator for Pipeline Safety in the
above-referenced case. It makes findings of violation and L.~ a civil penalty for those
violations. I Kknowledge your wire transfer dated February 17, 2004, for $25,000 as payment in
full of the civil penalty u.~~ in the Final Order. The Final Order acknowledges your completion
of the proposed compliance order items to comply with the pipeline ~afety regulations and }'Our
submission of amended procedures addressing the inadequacies cited in the Notice.
This case is now clolcd.
under 49 C.F.R. § 190.5.
Your receipt of the F ina1 Order consti tu tea service 0 f that document
Sincerely,
/Lt
Compliance
Pipeline Safety
Enclosure



DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIAlS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, DC 20590
In the Matter 0 f
CenexHarvest,
Respondent
}
)
)
)
CPF No. S-2003-SO12
FINAL ORDER
On J\U1e 3t 2003t the Directort Western Regio~ Office of Pipeline Safetyt issued Respondent a
Notice of Probable Vio1atio~ Proposed Compliance Order, Proposed Civil Penalty and Notice of
Amendment (Notice) in Kcordance with 49 C.F.R. § 190.207. The Notice pro posed assessing a civil
penattyof$25tOOO for the alleged violation of 49 C.F.R. 195.401(a) and proposed specific actions
that Respondent take to comply with the requirements of Part 195. The Notice also proposed that
Respondent amend its operating and maintenance procedW'CS.
Respondent submitted a request by letter dated June 30. 2003. for a 6O-day extension to respond to
the Notice. which the Di~tor, Western Region. OPS granted. Respondent responded to the Notice
by letter dated August 29, 2003. and did not contest the allegations. the amount of the proposed civil
pcoalty, the proposed compliance order, or the notice of inadequate procedures. Respondent
submitted a wire transfer in the amount of the proposed civil penalty (525.000), waiving further right
to respond. and authorizing the entry of this Final Order.
FINDINGS OF VIOLA nON
Pursuant to § 190.2O9(aXl) and 49 U.S.C. § 60122, I find that Respondent violated the following
sections of 49 C.F.R. Part 195 as described more completely in the Notice:
195.401(a) (Item 1) - failing to properly locate an active product pipeline during a
replacement project in Glendive, Montana, resulting in the striking and rupture of that
pipeline by Respondmt's contractor during horizontal directional drilling;
195 .4 28( a) (Item 6) - failing to collect testing and calibration records for overpressure safety
devices on the Front Range Pipeline from the Canadian border to the Santa Rita pump
station;and



2
195 . 567 (b X I) (Item 8) - fai ling to install . cadIOdic protection test lead at die Mi Ie Post
172.1 cuing. in order to have leads at intervals frequent enough to obtain electrical
measurement demonstrating the adequacy of the cathodic protection system.
TbeIe fiM~-!" of violation will be ~deraI prior offmscs in 'Y IUblequeDt enforcement action
tUtn against Respondent. Having reviewed the record aIKi considaQ! the U8C18rDcnt criteria, I
U~S the civil penalty of S2S,OOO for the violation of 49 C.F.R. 19S.401(a), already paid by
Respondent.
COMPUANCEORDER
The Notice pr~oIed a compliance ~ with rapect to ItaDs 6 8M! 8 in die Notice for violationa
of 49 C.F.R. §§ 19S.428(a) aIM! 19S.S67(b)(1). UDder' 49 U.S.C. f 6O118(a), CKh peraiii who
enSI8eI in the transportation of hazardous liquids or who OWDJ or operates a pipeline facility i.
required to comply with die applicable safety stalxlards elt8b1i1hed Imder Cbapta' 601. The
Regioaal Director baa ~CatCCI that J~lMimt has bepa collectiDladcq uate ovei"jil~ device
teIting aIM! cah'brllion records for the C~an )x)rdcr to the Sauta Rita pump ItatiCXlleglDalta of
the Front Range Pipeline and has iDItalJed a felt lc1d at Mile Post 172.1 to comply with tbepl 0IJ08ed
compliance order. Accordingly, since compliance hu been achieved with respect to this violation,
the compliance tennJ are not included in this Order.
AMBNDMENTOFPROCF.D1~
The Notice a1ao alleged that catain ofResporxla It, proceciula wae inadequate (Items 5 n 7).
Respondent submitted amended procedures for the Western Region to review. The Dira:tor,
Western Region, OPS has indicated dJatRespo ndent' I amended procedures address the inadequacies
cited in the Notice. Accordingly, I find that Respondent's original procedures u delCribed in the
Notice wa'e in~U8te to ~ safe opeI~ of its pipeline IyItaD. but that R~OOaIt has
co"a:-~ the identified in.teqUKies.
WARNINGn'EMS
The Notice did not propoee a civil paJalty CX' c:orrective action for failing to update drawings for the
Santa Rita pump ltItion after co nItruc1ion aIKI prior to opa'8bon of the 8-inch Santa Rita to Cutbank
pipeline (Item 2); failing to docummt repairs to previously-noted Item valve deficiencies (Item 3)~
failing to have adequate markers at severallocatiODJ along the pipeline right-of-way (Item 4); and
failing to consider IrMI account for voltage drop at ODe (()Cation when conducting pipe-to-lOil
potential cadM»dic protection monitoring surveys (!tan 9). lberg:.xii, these are conIidcred wmng
items. Respondent is warned that if it 00cs DOt take ..,..-\lfII-iate ICtion to correct these items,
cnfon:ement Ktion will be taken if a subsequent inspection reveal. a violation.



,
The teml
s and conditions of this Final Order are effective on receipt.
This case is now closed.
JUN 21m
Date Issued
&"

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520035012>
- Source ID: `phmsa-enforcement`
- SHA-256: `5d011fb786742c02401c8db2ed229a9ddff856fe1ba55624aedd7b53dada6d56`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T23:12:43.547Z
- Document slug: `phmsa-enforcement-520035012`

### Source metadata

```json
{
  "cpf": "520035012",
  "operator": "CENEX PIPELINE LLC",
  "region": "Western",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.401(a)",
    "195.404(a)",
    "195.410(a)(1)",
    "195.420(a)",
    "195.422(b)",
    "195.428(a)",
    "195.442(a)",
    "195.567(b)(1)",
    "195.571"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "520035012_final order_06212005.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520035012/520035012_final%20order_06212005.pdf",
      "bytes": 411870,
      "category": "agency_document"
    },
    {
      "name": "CENEX HARVEST (520035012).pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520035012/CENEX%20HARVEST%20(520035012).pdf",
      "bytes": 411870,
      "category": "case_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "CENEX PIPELINE LLC"
}
```