# BREA CANON OIL COMPANY — Notice of Probable Violation

**Citation:** CPF 520040005  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2004-03-18

CLOSED notice of probable violation citing 192.463(a), 192.465(a), 192.467(d), 192.706(a), 192.731.

## Document text

Notice of Probable Violation involving BREA CANON OIL COMPANY. PHMSA's enforcement data identifies the cited regulations as 192.463(a),  192.465(a),  192.467(d),  192.706(a),  192.731. The case was opened on 2004-03-18 and is reported as closed as of 2006-10-02. Proposed civil penalty: $28,000. Assessed civil penalty: $4,000. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520040005_final order_09132006.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520040005/520040005_final%20order_09132006.pdf

CPF_NO_5-2004-0005.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520040005/CPF_NO_5-2004-0005.pdf

520040005_final order_09132006.pdf

400 Seventh Street, S.W
U.S. Department Washington, D.C. 20590
of Transportation
Pipeline and Hazardous
Materials Safety Administration
SEP 1 3 2006
Mr. Rey Javier
Vice President
Brea Canyon Oil Company, Inc.
23903 South Normandie
Harbor City, California 907 10
Re: CPF No. 5-2004-0005
Dear Mr. Javier:
Enclosed is the Final Order issued by the Acting Associate Administrator for Pipeline Safety
in the above-referenced case. It withdraws two of the allegations of violation, makes a finding of
violation, and assesses a civil penalty of $4,000.00. It hrther finds that you have completed the
actions specified in the Notice required to comply with the pipeline safety regulations with
respect to the remaining violation. The penalty payment terms are set forth in the Final Order.
When the civil penalty is paid, this enforcement action will be closed. Your receipt of the Final
Order constitutes service under 49 C.F.R. 5 190.5.
Sincerely,
James Reynolds
Pipeline Compliance Registry
PHMSA-Office of Pipeline Safety
Enclosure
cc: Mr. Chris Hoidal, P.E., Director, Western Region, PHMSA
Mr. Timothy Burch, Environmental & Construction Technician, Brea Canyon Oil Company,
Inc.
CERTIFIED MAIL -RETURN RECEIPT REQUESTED



DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTFUTION
OFFICE OF PIPELINE SAFETY
WASHINGTON, DC 20590
In the Matter of
Brea Canyon Oil Company, Inc, 1 CPF NO. 5-2004-0005
1
1
Respondent 1
FINAL ORDER
On November 4 and 5,2002, pursuant to 49 U.S.C. $601 17, a representative of the Pipeline and
Hazardous Materials Safety Administration's (PHMSA'S)' Office of Pipeline Safety conducted
an on-site pipeline safety inspection of Respondent's pipeline facilities, manuals, and records in
Los Angeles, California. As a result of the inspection, the Director, Western Region, issued to
Respondent, by letter dated March 18,2004, a Notice of Probable Violation, Proposed Civil
Penalty, Proposed Compliance Order, (Notice). In accordance with 49 C.F.R. § 190.207, the
Notice proposed finding that Respondent had violated 49 C.F.R. Part 192, proposed assessing a
civil penalty of $28,000 for the alleged violations, and proposed ordering Respondent to take
certain measures to correct the alleged violations. The Notice also warned Respondent to take
appropriate corrective action on other cited items.
Respondent responded to the Notice by letter dated April 7,2004 (Response). Respondent
contested many of the allegations, offered information to explain the allegations, and requested
that the proposed civil penalty be reduced. Respondent did not request a hearing, and therefore
has waived its right to one.
FINDING OF VIOLATION
(Contested)
Item 1 in the Notice alleged Respondent violated 49 C.F.R. $ 192.463(a) by failing to have each
cathodic protection system required by Subpart I, "Requirements for Corrosion Control," provide
' Effective February 20,2005, the Pipeline and Hazardous Materials Safety Administration (PHMSA) succeeded
Research and Special Programs Administration as the agency responsible for regulating safety in pipeline
transportation and hazardous materials h-ansportation. See, section 108 of the Norman Y. Mineta Research and
Special Programs Improvement Act (Public Law 108-426, 118 Stat. 2423-2429 (November 30,2004)). See also, 70
Fed. Reg. 8299 (February 18,2005) redelegating the pipeline safety authorities and functions to the PHMSA
Administrator.



a level of cathodic protection that complies with one or more of the applicable criteria contained
in Appendix D of Part 192. At the time of inspection, Respondent failed to provide an adequate
level of cathodic protection on its pipelines for years 1999,2000, and 200 1. Respondent uses the
criteria for cathodic protection of Appendix D, section I (A)(l). The locations, as charted in the
Notice, did not have at least a negative cathodic pipe-to-soil potential of 850 mV and some were
not adequate for two or more inspection cycles. The Response acknowledges the problem and
cites its replacement and other upgrading efforts.
Accordingly, I find that Respondent violated 49 C.F.R. 5 192.463(a) as alleged in the Notice.
This finding of violation will be considered a prior offense in any subsequent action taken
against Respondent.
WITHDRAWAL OF ALLEGATIONS
Item 4, as more fully described in the Notice, alleged that Respondent had violated 49 C.F.R.
5 192.706(a), by failing to conduct leakage surveys of transmission lines at the prescribed
intervals. The subject jurisdictional gas gathering pipelines are transferring un-odorized gas
from production sites to a dehydration plant. 49 C.F.R. 5 192.706(a) requires Respondent to leak
survey its pipeline twice a year. However, this system is under negative (suction) pressure and,
therefore, a hole in the pipe would allow air in as opposed to allowing gas out. In this instance,
the performance of a leak survey would be moot. Based on the information at hand, I am
withdrawing this allegation of violation.
Item 5, as more fully described in the Notice, alleged that Respondent had violated 49 C.F.R.
5 192.731 by failing to properly inspect and test its compressor station pressure relief valve
(PRV) in accordance with 49 C.F.R. 5 5 192.739 and 192.743 at the time. Respondent has one
pressure relief device (PRV) downstream from a compressor in its dehydration plant. Based on
information from Respondent and senior engineers in the Western Region, it was determined that
the compressor and the PRV are within the Respondent's plant property and not regulated by
DOT. Therefore, I am withdrawing this allegation of violation based on the information at hand.
ASSESSMENT OF PENALTY
Under 49 U.S.C. 5 60122, Respondent is subject to a civil penalty not to exceed $25,000 per
violation for each day of the violation up to a maximum of $500,000 for any related series of
violation^.^
49 U.S.C. 5 601 22 and 49 C.F.R. 5 190.225 require that, in determining the amount of the civil
penalty, I consider the following criteria: nature, circumstances, and gravity of the violation,
degree of Respondent's culpability, history of Respondent's prior offenses, Respondent's ability
to pay the penalty, good faith by Respondent in attempting to achieve compliance, the effect on
Respondent's ability to continue in business, and such other matters as justice may require.
The Pipeline Safety Improvement Act of 2002, Pub. L. No. 107-355, § 8(b)(l), 116 Stat. 2992, increased the civil
penalty liability for violating a pipeline safety standard to $100,000 per violation for each day of the violation up to
a maximum of $1,000,000 for any related series of violations.



The Notice proposed a total civil penalty of $28,000.00 for three of the violations.
Item 1 of the Notice proposed a civil penalty of $9000.00 for violation of 49 C.F.R.
5 192.463(a). Respondent violated 49 C.F.R. 192.463(a) by failing to provide the applicable
level of cathodic protection. Although Respondent failed to provide an adequate level of
cathodic protection for the three years on its pipelines, Respondent appears to have expressed its
willingness to achieve compliance with applicable regulations. Respondent has aggressively
tried to and fixed its external corrosion problem. Respondent acknowledged the problem and
requested that the proposed civil penalty be lowered. Based on the amount of effort and expense
Respondent has incurred to remediate this deficiency, the penalty is reduced and I assess
respondent a civil penalty of $4,000.00 for violation of 49 C.F.R. 5 192.463(a).
Item 4 of the Notice proposed a civil penalty of $5,000.00. Since I have withdrawn the
allegation of violation of 49 C.F.R. 5 192.706(a) regarding leak surveys, I withdraw the
associated penalty of $5,000.00.
Item 5 of the Notice proposed a civil penalty of $14,000.00. Since I have withdrawn the
allegation of violation 49 C.F.R. 5 192.73 1 for failing to inspect and test in accordance with
49 C.F.R. 5 5 192.739 and 192.743 at the time, I withdraw the associated penalty of $14,000.00.
Accordingly, having reviewed the record and considered the assessment criteria, I assess
Respondent a total civil penalty of $4,000.00 for violation of 49 C.F.R. 5 192.463(a).
Respondent has the ability to pay this penalty without adversely affecting its ability to continue
in business.
Payment of the civil penalty must be made within 20 days of service. Payment may be made by
sending a certified check or money order (containing the CPF Number for this case) payable to
"U.S. Department of Transportation" to the Federal Aviation Administration, Mike Monroney
Aeronautical Center, Financial Operations Division (AMZ-300), P.O. Box 25082, Oklahoma
City, OK 73 125.
Federal regulations (49 C.F.R. 5 89.21(b)(3)) also permit this payment to be made by wire
transfer, through the Federal Reserve Communications System (Fedwire), to the account of the
U.S. Treasury. Detailed instructions are contained in the enclosure. Questions concerning wire
transfers should be directed to: Financial Operations Division (AMZ-300), Federal Aviation
Administration, Mike Monroney Aeronautical Center, P.O. Box 25082, Oklahoma City, OK
73 125; (405) 954-8893.
Failure to pay the $4,000.00 civil penalty will result in accrual of interest at the current annual
rate in accordance with 3 1 U.S.C. 5 371 7,3 1 C.F.R. 5 901.9 and 49 C.F.R. 5 89.23. Pursuant to
those same authorities, a late penalty charge of six percent (6%) per annum will be charged if
payment is not made within 1 10 days of service. Furthermore, failure to pay the civil penalty
may result in referral of the matter to the Attorney General for appropriate action in a United
States District Court.



COMPLIANCE ORDER
The Notice proposed a Compliance Order with respect to Item 1 in the Notice for violation of
49 C.F.R. $ 192.463(a). Under 49 U.S.C. $ 601 18(a), each person who engages in the
transportation of gas or who owns or operates a pipeline facility is required to comply with the
applicable safety standards established under Chapter 601. The Director, Western Region,
PHMSA has indicated that Respondent has aggressively tried to and fixed its external corrosion
problem by replacing anode wells and redirecting the different isolation points between its
rectifiers as well as taking other corrective actions. Accordingly, since compliance has been
achieved with respect to this violation, the compliance terms are not included in this Order.
WARNING ITEMS
The Notice did not propose a civil penalty or corrective action for Items 2 and 3 in the Notice but
warned Respondent that it should take appropriate corrective action to correct the items.
Item 2, as more fully described in the Notice, was for failing to take action in compliance with
49 C.F.R. $ 192.465(a) with respect to monitoring external corrosion. In its Response,
Respondent interpreted that it only had to survey 10% of its pipeline per the exception in 49
C.F.R. $ 192.465(a). 49 C.F.R. $ 192.465(a) applies to all regulated lines but it does give an
exception for separately protected short sections of mains or transmission pipelines, not in excess
of 100 feet in length. This exception does not apply to Respondent's pipelines subject to the
Notice. Therefore, this is considered to be a warning item. Respondent is warned that if it does
not take appropriate action to correct the citation, enforcement action will be taken if a
subsequent inspection reveals a violation.
Item 3, as more fully described in the Notice, was a warning with respect to 49 C.F.R. 192.467
(a-d) External corrosion control: Electrical isolation. Respondent presented information in its
Response showing that it has taken action towards addressing the cited item.
Under 49 C.F.R. $ 190.2 15, Respondent has a right to submit a Petition for Reconsideration of
this Final Order. The petition must be received within 20 days of Respondent's receipt of this
Final Order and must contain a brief statement of the issue(s). The filing of the petition
automatically stays the payment of any civil penalty assessed. However, if Respondent submits
payment for the civil penalty, the Final Order becomes the final administrative decision and the
right to petition for reconsideration is waived. The terms and conditions of this Final Order are
effective on receipt.
SEP 1 3 '?oliF,
Date Issued
ctin Associate Administrator
r ipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520040005>
- Source ID: `phmsa-enforcement`
- SHA-256: `3741e25135d394d2a497e4d3137a659787effa9a88d8cd476dc84c9daad4986c`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T06:11:04.540Z
- Document slug: `phmsa-enforcement-520040005`

### Source metadata

```json
{
  "cpf": "520040005",
  "operator": "BREA CANON OIL COMPANY",
  "region": "Western",
  "pipelineType": "GAS INTRASTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.463(a)",
    "192.465(a)",
    "192.467(d)",
    "192.706(a)",
    "192.731"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "520040005_final order_09132006.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520040005/520040005_final%20order_09132006.pdf",
      "bytes": 261131,
      "category": "agency_document"
    },
    {
      "name": "CPF_NO_5-2004-0005.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520040005/CPF_NO_5-2004-0005.pdf",
      "bytes": 258184,
      "category": "case_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "BREA CANON OIL COMPANY"
}
```