# ALYESKA PIPELINE SERVICE CO — Notice of Amendment

**Citation:** CPF 520045011M  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2004-04-01

CLOSED notice of amendment citing 195.452(l)(2).

## Document text

Notice of Amendment involving ALYESKA PIPELINE SERVICE CO. PHMSA's enforcement data identifies the cited regulation as 195.452(l)(2). The case was opened on 2004-04-01 and is reported as closed as of 2007-11-15. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520045011M_order directing amendment_06192006.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520045011M/520045011M_order%20directing%20amendment_06192006.pdf

520045011m_order directing amendment_06192006_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520045011M/520045011m_order%20directing%20amendment_06192006_text.pdf

520045011m_order directing amendment_06192006_text.pdf

U. S. Department
of Transportation
Pipeline and
Hazardous Materials Satety
Administration JUN 19 2006
400 Seventh Street, S. W
Washington, D C 20590
B Federal Ex ress and Facsimile: 907-450-5415
Mr. Rob Shoaf
Vice President- Regulatory Affairs
Alyeska Pipeline Service Company
P, O. Box 196660
Anchorage, AK 99519-6660
Re: CPF No. 5-2004-5011M
Dear Mr. Shoaf:
Enclosed is the Order Directing Amendment issued by the Associate Administrator for
Pipeline Safety in the above-referenced case. It makes a finding of inadequate procedures
with respect to Items 1c and 1d of the Notice of Amendment and requires that you amend
your integrity management program procedures. For the remaining items listed in the Notice
of Amendment, the Order finds that with respect to the Notice, no further revisions of your
procedures are required. When the terms of the Order are completed, as determined by the
Director, Western Region, OPS, this enforcement action will be closed. Your receipt of the
Order Directing Amendment constitutes service of that document under 49 C. F. R. $ 190. 5.
Sincerely,
James Reynolds
Pipeline Compliance Registry
Office of Pipeline Safety
cc: Chris Hoidal P. E.
, Regional Director
Western Region, OPS
Shelia Doody-Bishop, Legal Counsel
Alyeska Pipeline Service Company
Enclosure



DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, DC 20590
)
In the Matter of )
)
Alyeska Pipeline Service Company, )
)
Respondent )
CPF No. 5-2004-5011M
ORDER DIRECTING AMENDMENT
Between May 6 and 9, 2003, pursuant to 49 U. S. C. $ 60117, representatives of the Pipeline
and Hazardous Materials Safety Administration, Office of Pipeline Safety (OPS), inspected
Respondent's integrity management program (IMP) for the Trans Alaska Pipeline System
(TAPS). As a result of the inspection, the Director, Western Region, OPS, issued to
Respondent, by letter dated April 1, 2004, a Notice of Amendment (NOA). The NOA alleged
inadequacies in Respondent's IMP and proposed to require amendment of Respondent's
procedures to comply with the requirements of 49 C. F. R. g 195. 452.
Respondent requested a 60-day extension by letter dated May 6, 2004. OPS granted the
request by letter dated May 6, 2004. Respondent requested an additional extension by letter
dated June 9, 2004. In a letter dated August 16, 2004, Respondent answered the NOA by
requesting a hearing and providing a statement of issues it wished to raise. On November 16,
2004, Respondent presented its plans for compliance with the NOA. In a letter dated
December 7, 2004, OPS found that this presentation did not fulfill the requirement of the
NOA. In a letter dated July 15, 2005, Respondent submitted updated IMP procedures. In an
August 9, 2005 letter, OPS confirmed a telephone conversation between OPS and Respondent
regarding a hearing. A hearing was held on September 21, 2005. Respondent submitted post-
hearing comments in a letter dated November 18, 2005.
Findings
NOA Item 1c alleged that Respondent improperly used its segment-specific risk assessment
(SSRA) to deselect "could affect" pipeline segments from its IMP. In response, Respondent
submitted revised procedures for assessing risks to High Consequence Areas (HCA). '
Respondent stated that its revised risk ranking procedure would be used to identify the need
for additional preventive and mitigative measures and to determine if pipeline segments could
' Respondent's September 21, 2005 Hearing Presentation, Determining Risk Rank, pp. 16-24.



affect a HCA. Respondent used the revised procedure to create a risk matrix chart that displays
combinations of spill likelihoods and consequences and determines a resulting policy of action.
Respondent erroneously concludes that its risk ranking procedure reveals risks low enough to
justify deselecting some "could affect" pipeline segments from its IMP.
Section 195. 452(a) requires Respondent's IMP to include all pipeline segments that could affect
a HCA. ' Respondent continues to improperly employ its SSRA to deselect pipeline segments
that could impact HCAs. A risk rank classification of minimal risk, while useful in the context
of considering the need for additional preventative and mitigative measures to reduce risk to
HCAs, is an unsound justification for exclusion of pipeline segments from Respondent's IMP.
Respondent's current practice of deselecting pipeline segments where there is possible risk to
HCAs is contrary to the requirements of Section 195. 452(a).
Respondent asserts that when applying the regulation, OPS is only concerned with consequences
to HCAs and does not consider the likelihood of impact. This statement mischaracterizes OPS's
regulatory mandate. When assessing Respondent's compliance with $195. 452(a), OPS applies
the language of that section as it is clearly written. "Could affect" means any effect, from the
smallest likelihood to the greatest certainty. This finding is consistent with past PHMSA
findings that any impact to a HCA requires inclusion of the respective pipeline segment in
Respondent's IMP.
Item 1d alleged that Respondent failed to consider additional preventative and mitigative
measures to reduce risks to HCAs. The NOA found that Respondent's risk analysis lacked the
rigorous level of detail required under the regulations. In response to the NOA, Respondent
amended its procedures for consideration of risk factors when it identifies the need for and nature
of additional preventative and mitigative measures to protect HCAs. At the hearing, Respondent
presented a risk ranking methodology and "Leak Probability Chart. " Respondent's
methodology and chart only considers risks originating from the types of hazards that have
actually occurred, and not those risks that could otherwise be anticipated.
Section 195. 452(i) requires Respondent to identify and add preventative and mitigative measures
to protect HCAs that could be affected by a pipeline segment. To identify the need for and
nature of these measures, Respondent must undertake a SSRA of each "could affect" segment.
Respondent's SSRA must include all relevant risk factors. ' Instead, Respondent!mproperly
excludes a wide range of important risk factors from its SSRA by only listing risks from hazards
Id. at 16.
Id at 20.
' Id. at 20-22. Respondent asserts that risks low enough to fit into Risk Rank 4 do not justify inclusion in its IMP.
Only by demonstration through Risk Assessment that the pipeline could not affect an HCA may that particular
pipeline segment be removed from Respondent's IMP. See 49 C F. R. $195. 452(a). Respondent may not make an
end run around the requirements of $195 452(a) by identifying a "could affect" segment and later deselecting it
because the risk is determined to be low as a result of a $195. 452(i) mandated SRA.
See $192 452(i) Risk assessment is used to "identify additional actions to enhance public safety or environmental
protection "
Respondent's November 18, 2005, Post-hearing letter, p. 3.
In the matter of BP Exploration Alaska, Inc.
,
Order Directing Amendment, p. 2, CPF No. 5-2002-5024M (Apr. 25,
2006) (holding that segments which presented even minimal risk to a HCA must be included in Respondent's IMP);
In the matter of BP Exploration Alaska, Inc.
,
Order Directing Amendment, p. 2, CPF No. 5-2004-5019M (Apr. 25,
2006) (holdmg that absent clear evidence that a HCA is not affected by a given pipeline segment, that segment must
be included in Respondent's segment identification analysis)
" )195. 452(i)(2) provides a non-exclusive list of relevant risk factors.Respondent's September 21, 2005, Hearing Presentation, Linewide Threat Results, p. 11



that have actually occurred in the past. Respondent has failed to consider anticipated risks such
as potential overpressure situations due to an uncommanded valve closure, human error, or a fast
transient pressure spike. Respondent's failure to include anticipated hazards limits the
usefulness of its SSRA and is not protective of pipeline safety. Preventative and mitigative
measures cannot be meaningfully assessed without consideration of a full range of risk factors,
including those Respondent is fortunate enough not to have experienced in the past.
The Director, Western Region, reviewed the revised procedures and the materials presented at
the hearing and afterward. Based on the results of that review, I find that Respondent's original
IMP procedures, as described in the NOA, were inadequate to ensure safe operation of its
pipeline system, but that Respondent has corrected the inadequacies identified in NOA Items 1a
and lb. Respondent need not make any further revisions based on the NOA with respect to these
items. With respect to Items 1c and 1d, I find that Respondent's IMP procedures remain
inadequate to ensure safe operation of its pipeline system. Pursuant to 49 U. S. C. $ 60108(a) and
49 C. F. R. $ 190. 237, Respondent is ordered to make the following revisions to its integrity
management program procedures. Respondent must—
1. Include in its IMP any pipeline segments that could affect an HCA, regardless of the
magnitude of that potential impact and not use an SSRA finding of minimal impact as
justification for deselection of pipeline segments.
2. Include in its SSRA a thorough and careful weighing of risk factors, including all
relevant anticipated and known risks. The amended SSRA must then be used to assess
the need for and nature of mitigative and preventative measures to protect HCAs that
could be affected by a pipeline segment.
3. Submit the amended procedures to the Director, Western Region, OPS within 30 days
following receipt of this Order Directing Amendment. With respect to the submission of
amended procedures, the Director may notify Respondent if any or all of the procedures
have been amended satisfactorily, or, if further modification is necessary, require
respondent to modify the submission to cure deficiencies. If the Director finds
deficiencies and orders further modification, Respondent must proceed to take all action
to correct its procedures to comply with this order. Respondent must correct all
deficiencies within the time specified by the Director, and resubmit the procedures for
review. If a resubmitted item is disapproved in whole or in part, the Director may again
require Respondent to correct the deficiencies in accordance with the foregoing
procedure, or the Director may otherwise proceed to enforce the terms of this Order.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent demonstrating good cause for an extension.



Failure to comply with this Order may result in the assessment of administrative civil penalties
of up to $100, 000 per violation per day, or in the referral of the case for judicial enforcement.
The terms and conditions of this Order Directing Amendment are effective upon receipt.
JUN 19 2006
Date Issued
Sta e
Asso
Ge d
ate Administrator for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520045011M>
- Source ID: `phmsa-enforcement`
- SHA-256: `382c607703f572c735b43efef0562a3d22ab11734fd411649d823aae17712748`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-25T01:30:20.327Z
- Document slug: `phmsa-enforcement-520045011m`

### Source metadata

```json
{
  "cpf": "520045011M",
  "operator": "ALYESKA PIPELINE SERVICE CO",
  "region": "Western",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.452(l)(2)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "520045011M_order directing amendment_06192006.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520045011M/520045011M_order%20directing%20amendment_06192006.pdf",
      "bytes": 559145,
      "category": "agency_document"
    },
    {
      "name": "520045011m_order directing amendment_06192006_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520045011M/520045011m_order%20directing%20amendment_06192006_text.pdf",
      "bytes": 269613,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "ALYESKA PIPELINE SERVICE CO"
}
```