# TESORO HIGH PLAINS PIPELINE COMPANY LLC — Notice of Probable Violation

**Citation:** CPF 520045033  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2004-12-09

CLOSED notice of probable violation citing 195.452(b)(3), 195.452(e), 195.452(f)(1), 195.452(f)(4), 195.452(f)(7), 195.452(f)(8), 195.452(i)(1), 195.452(j)(3), 195.452(j)(4)(ii), 195.452(l)(ii).

## Document text

Notice of Probable Violation involving TESORO HIGH PLAINS PIPELINE COMPANY LLC. PHMSA's enforcement data identifies the cited regulations as 195,  195.452(b)(3),  195.452(e),  195.452(f)(1),  195.452(f)(4),  195.452(f)(7),  195.452(f)(8),  195.452(i)(1),  195.452(j)(3),  195.452(j)(4)(ii),  195.452(l)(ii). The case was opened on 2004-12-09 and is reported as closed as of 2010-01-08. Proposed civil penalty: $20,000. Assessed civil penalty: $10,000. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520045033_FinalOrder_07092009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520045033/520045033_FinalOrder_07092009.pdf

520045033_FinalOrder_07092009_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520045033/520045033_FinalOrder_07092009_text.pdf

520045033_FinalOrder_07092009_text.pdf

JUL 09 2009
Mr. John W. Moore
Vice-President, Pipelines and Terminals
Tesoro Refining and Marketing Company
1225 17th Street, Suite 1800
Denver, CO 80202
Re: CPF No. 5-2004-5033
Dear Mr. Moore:
Enclosed is the Final Order issued in the above-referenced case. It makes findings of violation,
withdraws one allegation of violation and part of another, and assesses a reduced civil penalty of
$10,000. The Final Order also specifies actions that need to be taken by Tesoro to comply with
the pipeline safety regulations and to revise its Integrity Management Program procedures. The
penalty payment terms are set forth in the Final Order.
When the civil penalty has been paid, the terms of the compliance order completed, and the
procedures satisfactorily amended, as determined by the Director, Western Region, this
enforcement action will be closed. Your receipt of the Final Order constitutes service of that
document under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Chris Hoidal, Director, Western Region, PHMSA
CERTIFIED MAIL – RETURN RECEIPT REQUESTED [ 7005 0390 0005 6162 5036]



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
________________________________
)
In the Matter of )
)
Tesoro Refining and Marketing Co., ) CPF No. 5-2004-5033
)
Respondent. )
________________________________)
FINAL ORDER
From November 4-6, 2003, pursuant to 49 U.S.C. § 60117, a representative of the Pipeline and
conducted an on-site pipeline safety inspection of the written Integrity Management Program
(IMP) of Tesoro Refining and Marketing Company (Tesoro or Respondent) at the company’s
the United States, including ones in Alaska, Hawaii, Utah, and North Dakota. At the time of the
Hazardous Materials Safety Administration (PHMSA)1 , Office of Pipeline Safety (OPS),
offices in Denver, Colorado. Tesoro’s IMP covers all of its DOT-regulated pipeline systems in
inspection, Tesoro operated approximately 335 miles of regulated hazardous liquid pipelines.
As a result of the inspection, the Director, Western Region, OPS (Director), issued to
Respondent, by letter dated December 9, 2004, a Notice of Probable Violation, Proposed Civil
Penalty, Proposed Compliance Order, and Notice of Amendment (Notice). In accordance with
49 C.F.R. § 190.207, the Notice proposed finding that Respondent had committed various
violations of 49 C.F.R. § 195.452, assessing a civil penalty of $20,000 for the said violations,
and ordering Respondent to take certain measures to correct said violations. The Notice also
proposed, in accordance with 49 C.F.R. § 190.237, that Tesoro amend its IMP procedures.
Respondent responded to the Notice by letter dated January 7, 2005 (Response). Tesoro
contested certain allegations and submitted copies of its revised IMP procedures. Respondent
did not request a hearing and therefore has waived its right to one. The following Final Order
discusses each of the allegations set forth in the Notice and the issues raised by Respondent. The
discussion is divided into six sections: Findings of Violation; Assessment of Penalty;
Compliance Order; Amendment of Procedures; Order Directing Amendment; and Warning
Items.
1 Effective February 20, 2005, the Pipeline and Hazardous Materials Safety Administration (PHMSA) succeeded the
Research and Special Programs Administration as the agency responsible for regulating safety in pipeline
transportation and hazardous materials transportation. See, section 108 of the Norman Y. Mineta Research and
Special Programs Improvement Act (Public Law 108-426, 118 Stat. 2423-2429 (November 30, 2004)). See also, 70
Fed. Reg. 8299 (February 18, 2005) redelegating the pipeline safety authorities and functions to the PHMSA
Administrator.



2
FINDINGS OF VIOLATION
Contested Items
The Notice alleged that Respondent violated 49 C.F.R. Part 195, as follows:
Item 1(a): The Notice alleged that Respondent violated 49 C.F.R. § 195.452(f)(1), which states,
in relevant part:
§ 195.452 Pipeline integrity management in high consequence
areas.
(a) ….
(f) What are the elements of an integrity management program? An
integrity management program begins with the initial framework. An
operator must continually change the program to reflect operating
experience, conclusions drawn from results of the integrity assessments,
and other maintenance and surveillance data, and evaluation of
consequences of a failure on the high consequence area. An operator must
include, at minimum, each of the following elements in its written
integrity management program:
(1) A process for identifying which pipeline segments could affect a
high consequence area; . . .
(3) An analysis that integrates all available information about the
integrity of the entire pipeline and the consequences of a failure (see
paragraph (g) of this section);
(4) Criteria for remedial actions to address integrity issues raised by
the assessment methods and information analysis (see paragraph (h) of this
section); . . .
(7) Methods to measure the program’s effectiveness (see paragraph
(k) of this section);
(8) A process for review of integrity assessment results and
information analysis by a person qualified to evaluate the results and
information (see paragraph (h)(2) of this section).
The Notice alleged that Respondent violated § 195.452(f)(1) by failing to identify all of the
pipeline segments in its system that “could affect” a High Consequence Area (HCA).2
Specifically, the Notice alleged that Tesoro’s “could affect” segment maps were neither
consistent with Appendix C of its own IMP manual nor the maps in the National Pipeline
Mapping System (NPMS). For example, the company’s maps did not include “could affect”
segments of the Great Plains Pipeline that were located close to Other Populated Area (OPA)
3
HCAs.
2 An HCA is defined as: (1) A commercially navigable waterway, which means a waterway where a substantial
likelihood of commercial navigation exists; (2) A high population area, which means an urbanized area, as defined
and delineated by the Census Bureau, that contains 50,000 or more people and has a population density of at least
1,000 people per square mile; (3) An other populated area, which means a place, as defined and delineated by the
Census Bureau, that contains a concentrated population, such as an incorporated or unincorporated city, town,
village, or other designated residential or commercial area; (4) An unusually sensitive area. See 49 C.F.R. § 195.6.
3 Id.



3
In its Response, Tesoro contested this allegation yet acknowledged that it had left two OPA
reflect that its pipeline could affect these OPA HCAs. Respondent argued, however, that the
HCAs out of its IMP.4 Tesoro further noted that it had revised its IMP after the inspection to
omission of these OPAs had “minimal” impact on its program because they were low-risk
segments in Tesoro’s overall risk ranking system.
I find Respondent’s arguments unpersuasive. One of the principal goals of the segment
identification process is for operators to ensure that they identify, and include in their IMPs, all
pipeline segments that “could affect” an HCA. It is irrelevant whether the segments Tesoro
failed to include were either low-risk or high-risk. Respondent was required to identify all
“could affect” segments yet failed to do so. After considering all the evidence, I find that
Respondent violated § 195.452(f)(1) by failing to identify all pipeline segments that “could
affect” HCAs.
The Notice also alleged that Tesoro could not ensure that all of its pipelines were accurately
reflected in the NPMS. However, in its Response, Tesoro presented information demonstrating
that it had timely submitted NPMS data on June 16, 2003, and had thereafter submitted revised
information as it became available. Therefore, I withdraw this portion of the allegation of
violation.
Item 1(b): The Notice alleged that Respondent violated 49 C.F.R. § 195.452(f)(1), as quoted
above, by failing to have an adequate process for identifying which pipeline segments “could
affect” an HCA. Specifically, the Notice alleged that the process was inadequate because Tesoro
had not performed segment identification on one of its pipeline systems known as the Golden
Eagle Pipeline. Subsequent to the inspection, OPS learned that the Golden Eagle Pipeline is an
intrastate pipeline currently regulated by the California State Fire Marshal and not by OPS.
Accordingly, I withdraw this allegation of violation.
Uncontested Items
In its Response, Respondent did not contest the following allegations in the Notice that it
violated 49 C.F.R. Part 195:
Item 1(c): The Notice alleged that Respondent violated 49 C.F.R. § 195.452(f)(3), as quoted
above, by failing to include in its IMP an analysis that integrated all available information about
the integrity of its entire pipeline system and the consequences of a failure. Specifically, the
Notice alleged that Tesoro failed to consider potential release volumes from its entire pipeline
system, including tanks. Tesoro did not contest this allegation. Accordingly, I find that
Respondent violated 49 C.F.R. § 195.452(f)(3) by failing to include in its IMP an analysis that
integrated all available information about the integrity of its entire pipeline system and the
consequences of a failure.
Item 3(a): The Notice alleged that Respondent violated 49 C.F.R. § 195.452(f)(8), as quoted
above, by failing to include in its IMP a process for the review of integrity assessment results and
a means for revision control. Tesoro did not contest this allegation. Accordingly, I find that
4 Response at 2. While the two HCAs appeared on Tesoro’s “HCA analysis maps,” these areas were omitted from
the tabular list of HCAs in Appendix C.



4
Respondent violated 49 C.F.R. § 195.452(f)(8) by failing to include in its IMP a process for the
review of integrity assessment results and a means for revision control.
Item 3(b): The Notice alleged that Respondent violated 49 C.F.R. § 195.452(f)(8), as quoted
above, by failing to include in its IMP a process for ensuring that personnel reviewing integrity
assessment results are qualified to perform such reviews. Tesoro did not contest this allegation.
Accordingly, I find that Respondent violated 49 C.F.R. § 195.452(f)(8) by failing to include in its
IMP a process for ensuring that personnel reviewing integrity assessment results are qualified to
perform such reviews.
Item 4: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(f)(4), as quoted
above, by failing to have sufficiently detailed criteria for taking remedial action to address
integrity issues raised by the assessment methods and information analysis used in its IMP.
Tesoro did not contest this allegation. Accordingly, I find that Respondent violated
§ 195.452(f)(4) by failing to have sufficiently detailed criteria for taking remedial action to
address integrity issues raised by the assessment methods and information analysis in its IMP.
Item 5(a): The Notice alleged that Respondent violated 49 C.F.R. § 195.452(e)(1), which states,
in relevant part:
§ 195.452 Pipeline integrity management in high consequence areas.
(a) ….
(e) What are the risk factors for establishing an assessment schedule
(for both the baseline and continual integrity assessments)?
(1) An operator must establish an integrity assessment schedule that
prioritizes pipeline segments for assessment (see paragraphs (d)(1) and
(j)(3) of this section). An operator must base the assessment schedule on
all risk factors that reflect the risk conditions on the pipeline segment. The
factors an operator must consider, but are not limited to: ….
The Notice alleged that Respondent violated § 195.452(e)(1) by failing to set an integrity
assessment schedule based upon all risk factors that reflect the risk conditions on each pipeline
segment. Specifically, the Notice alleged that Tesoro’s risk analysis lacked definitions for
variables, variable weights, the basis for risk factors, and a process for populating, maintaining,
and updating the input database. Tesoro did not contest this allegation. Accordingly, I find that
Respondent violated § 195.452(e)(1) by failing to set an integrity assessment schedule based
upon all risk factors that reflect the risk conditions on each pipeline segment.
Item 5(b): The Notice alleged that Respondent violated 49 C.F.R. § 195.452(e)(1), as quoted
above, by failing to include breakout tanks in the risk analysis it performed for determining an
integrity assessment schedule. More fundamentally, the Notice alleged that Tesoro did not
include breakout tanks in its IMP. Tesoro did not contest this allegation. Accordingly, I find
that Respondent violated 49 C.F.R. § 195.452(e)(1), by failing to include breakout tanks in the
risk analysis it performed for determining an integrity assessment schedule or to include such
tanks at all in its IMP.
Item 6: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(i)(1), which states:



5
195.452 Pipeline integrity management in high consequence
areas.
(a) ….
(i) What preventive and mitigative measures must an operator take to
protect the high consequence area?
(1) General requirements. An operator must take measures to prevent
and mitigate the consequences of a pipeline failure that could affect a high
consequence area. These measures include conducting a risk analysis of
the pipeline segment to identify additional actions to enhance public safety
or environmental protection. Such actions may include, but are not
limited to, implementing damage prevention best practices, better
monitoring of cathodic protection where corrosion is a concern,
establishing shorter inspection intervals, installing EFRDs on the pipeline
segment, modifying the systems that monitor pressure and detect leaks,
providing additional training to personnel on response procedures,
conducting drills with local emergency responders and adopting other
management controls.
The Notice alleged that Respondent violated § 195.452(i)(1) by failing to have an adequate
process for selecting and implementing measures to prevent and mitigate the consequences of a
pipeline failure that could affect an HCA. Specifically, the Notice alleged that Tesoro’s IMP
lacked a detailed process for assessing risks, selecting candidate preventive and mitigative
measures, and deciding whether to implement them. Tesoro did not contest this allegation.
Accordingly, I find that Respondent violated § 195.452(i)(1) by failing to have an adequate
process for selecting and implementing measures to prevent and mitigate the consequences of a
pipeline failure that could affect an HCA.
Item 7: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(f)(7), as quoted
above, by failing to include adequate methods to measure the effectiveness of its IMP.
Specifically, the Notice alleged that Tesoro had neither a clearly defined process for applying
performance metrics to evaluate the effectiveness of its IMP nor a process for distribution and
review of its evaluation results. Tesoro did not contest this allegation. Accordingly, I find that
Respondent violated § 195.452(f)(4) by failing to include adequate methods to measure the
effectiveness of its IMP.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$100,000 per violation for each day of the violation, up to a maximum of $1,000,000 for any
related series of violations.
49 U.S.C. § 60122 and 49 C.F.R. § 190.225 require that, in determining the amount of a civil
penalty, I consider the following criteria: the nature, circumstances, and gravity of the violation,
including adverse impact on the environment; the degree of Respondent’s culpability; the history
of Respondent’s prior offenses; the Respondent’s ability to pay the penalty and any effect that
the penalty may have on its ability to continue doing business; and the good faith of Respondent
in attempting to comply with the pipeline safety regulations. In addition, I may consider the
economic benefit gained from the violation without any reduction because of subsequent



6
damages, and such other matters as justice may require. The Notice proposed a total civil
penalty of $20,000 for two violations of § 195.452(f)(1).
Notice Item 1(a) proposed a civil penalty of $10,000 for violation of 49 C.F.R. § 195.452(f)(1),
for Respondent’s alleged failure to identify all of its pipeline segments that “could affect” an
HCA. Tesoro contested this allegation yet acknowledged that it had left two OPA HCAs out of
its IMP. Tesoro argued, however, that when it subsequently added the two OPAs to its IMP, the
risks to the OPAs were found to be relatively low in the overall risk ranking. As discussed
above, Tesoro is responsible for identifying and including in its IMP all “could affect” segments,
regardless of risk ranking. Tesoro has submitted no evidence that would warrant the reduction or
elimination of the civil penalty for this Item. Accordingly, having reviewed the record and
considered the assessment criteria, I assess Respondent a civil penalty of $10,000 for violating
49 C.F.R. § 195.452(f)(1).
Notice Item 1(b) proposed a civil penalty of $10,000 for violation of 49 C.F.R. § 195.452(f)(1),
for Respondent’s alleged failure to have an adequate process for identifying which pipeline
segments could affect an HCA. This allegation of violation has been withdrawn. Accordingly, I
withdraw the proposed penalty for this Item.
Payment of the civil penalty must be made within 20 days of service. Payment may be made by
sending a certified check or money order (containing the CPF Number for this case) payable to
“U.S. Department of Transportation” to the Federal Aviation Administration, Mike Monroney
Aeronautical Center, Financial Operations Division (AMZ-341), P.O. Box 269039, Oklahoma
City, OK 73125.
Federal regulations (49 C.F.R. § 89.21(b)(3)) also permit this payment to be made by wire
transfer, through the Federal Reserve Communications System (Fedwire), to the account of the
U.S. Treasury. Detailed instructions are contained in the enclosure. Questions concerning wire
transfers should be directed to: Financial Operations Division (AMZ-341), Federal Aviation
Administration, Mike Monroney Aeronautical Center, P.O. Box 269039, Oklahoma City, OK
73125; (405) 954-8893.
Failure to pay the $10,000 civil penalty will result in accrual of interest at the current annual rate
in accordance with 31 U.S.C. § 3717, 31 C.F.R. § 901.9 and 49 C.F.R. § 89.23. Pursuant to
those same authorities, a late penalty charge of six percent (6%) per annum will be charged if
payment is not made within 110 days of service. Furthermore, failure to pay the civil penalty
may result in referral of the matter to the Attorney General for appropriate action in a United
States District Court.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Items 1(a-c), 3(a-b), 4, 5(a-b), 6 and 7
in the Notice for violations of 49 C.F.R. § 195.452.
The Final Order withdraws a portion of the allegation in Item 1(a) and the full allegation of
violation in Item 1(b) of the Notice. Therefore, Respondent need not take any action regarding
those Items. Regarding the proposed compliance order related to Items 3(a-b), 4, 6 and 7 of the
Notice, the Director has indicated that Respondent has taken the following actions to address the
cited violations:



7
1. With respect to Item 3(a), concerning Tesoro’s violation of 49 C.F.R. § 195.452(f)(8),
Section IM007 of the company’s revised procedures now includes a process and means
for revision control, for performing reviews of integrity assessment results.
2. With respect to Item 3(b), concerning Tesoro’s violation of 49 C.F.R. § 195.452(f)(8),
Section IM007 of the company’s revised procedures now includes a process to ensure
that personnel performing reviews of integrity assessment results are qualified.
3. With respect to Item 4, concerning Tesoro’s violation of 49 C.F.R. § 195.452(f)(4),
Section IM010 of the company’s revised procedures now includes additional detail in the
process for determining what pipeline repairs are necessary.
4. With respect to Item 6, concerning Tesoro’s violation of 49 C.F.R. § 195.452(i)(1),
Section IM011 of the company’s revised procedures now includes a detailed
methodology for evaluating the effectiveness of preventive and mitigative measures.
5. With respect to Item 7, concerning Tesoro’s violation of 49 C.F.R. § 195452(f)(7),
section FM015-02 of the company’s revised procedures now includes improved methods
to measure IMP effectiveness.
Accordingly, since compliance has been achieved with respect to these violations, the
compliance terms are not included in this Order.
A compliance order remains necessary however, to address the violations described in Items 1(c)
and 5(a-b). In its Response, Tesoro indicated that it planned to update its processes and
procedures in response to Notice Items 1(c) and 5(b). Regarding Item 5(a), Tesoro submitted
revised procedures. However, these procedures remain inadequate because the company has not
modified its risk model to incorporate all threats that may be applicable to its operations. For
example, Tesoro has pipelines in areas where conditions that may promote stress corrosion
cracking (SCC) are known to exist but the company has not incorporated SCC threats into its risk
model.
Under 49 U.S.C. § 60118(a), each person who engages in the transportation of hazardous liquids
or who owns or operates a pipeline facility is required to comply with the applicable safety
standards established under chapter 601. Pursuant to the authority of 49 U.S.C. § 60118(b) and
49 C.F.R. § 190.217, Respondent is ordered to take the following actions to ensure compliance
with the pipeline safety regulations applicable to its operations. Respondent shall:
1. Regarding Item 1(c), pertaining to Tesoro’s violation of § 195.452(f)(3) for its failure to
conduct an analysis that integrates certain information about the integrity of its pipelines
and the consequence of a failure, identify and include in its IMP all pipeline facilities that
could affect an HCA.
2. Regarding Item 5(a), pertaining to Tesoro’s violation of § 195.452(e)(1) for its failure to
sufficiently document a process for risk analysis in support of its assessment schedule,
modify its risk model and procedures to include all threats that may be applicable to its
operations, including, but not limited to, SCC threats.
3. Regarding Item 5(b), pertaining to Tesoro’s violation of § 195.452(e)(1) for its failure to
include breakout tanks in the risk analysis supporting its integrity assessment schedule
and in its IMP, include breakout tanks in its IMP and add them to the risk analysis.



8
4. Regarding all Compliance Order requirements listed above, ensure that all revised
procedures and processes are of sufficient detail such that they: (a) clearly articulate the
necessary steps to perform each program element and ensure repeatability; (b) describe
key sources for information inputs; (c) define process outputs, process documentation
(including documentation of the justifications for decisions), and document retention
requirements; and (d) specify organizational responsibilities for each key step in the
process or procedure.
5. Within 60 days of receipt of this Final Order, Tesoro must complete the work required in
paragraphs 1-4 above and submit documentation and revised procedures to the Director,
Western Region, Office of Pipeline Safety, PHMSA, 12300 W. Dakota Avenue, Suite
110, Lakewood, CO 80228.
6. Tesoro must maintain documentation of the costs associated with fulfilling this
compliance order and submit the total to the Director, Western Region.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent demonstrating good cause for an extension.
Failure to comply with this Order may result in administrative assessment of civil penalties not
to exceed $100,000 for each violation for each day the violation continues or in referral to the
Attorney General for appropriate relief in a district court of the United States.
AMENDMENT OF PROCEDURES
Items 1(d), 3(c), 3(d) and 8 in the Notice alleged certain inadequacies in Respondent’s IMP and
proposed to require that the company amend its IMP procedures to comply with the requirements
of 49 C.F.R. § 195.452. In its Response, Tesoro submitted copies of its amended procedures,
which the Director has reviewed. Accordingly, based on the results of this review, I find that
Respondent’s original procedures as described in the Notice were inadequate to ensure safe
operation of its pipeline system, but that Respondent has corrected the identified inadequacies.
Therefore, no need exists to issue an Order Directing Amendment for these Items.
ORDER DIRECTING AMENDMENT
Items 1(e) and 9 in the Notice alleged other inadequacies in Tesoro’s IMP and proposed to
require that Respondent amend its procedures to comply with the requirements of 49 C.F.R. §
195.452.
Item 1(e) in the Notice alleged that Tesoro’s IMP procedures were inadequate because they did
not consider all of the risk factors that reflect the risk conditions on the pipeline. Specifically,
the Notice alleged that Tesoro’s IMP procedures did not include a “sensitivity analysis” that
considered a wide range of pipeline break sizes and response times. The Notice alleged that
without an analysis that considered a variety of break scenarios and the extent to which spills
could spread, Tesoro could not properly determine the potential effects of different size spills or
produce a sufficiently conservative evaluation of their effects on HCAs. In its Response, Tesoro
indicated that it would make changes to its IMP procedure after further analysis.



9
Item 9 in the Notice alleged that Tesoro’s IMP procedures were inadequate because they did not
discuss how data from inspections and tests required under Part 195 (e.g., cathodic protection
survey data) would be used in establishing pipeline reassessment intervals. Although
Respondent submitted amended procedures on January 7, 2005, they still do not address all of
the inadequacies described in the Notice.
Accordingly, I find that Respondent’s IMP procedures are inadequate to assure safe operation of
its pipeline system. Pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237, Respondent is
ordered to make the following changes to its procedures. Respondent must—
1. Regarding Item 1(e), amend its IMP procedures to conduct a sensitivity analysis that
considers a wide range of pipeline break sizes and response times. Use the results to
determine predicted spill volumes and spread extents to ensure that potential spill impacts
are evaluated conservatively enough to provide adequate protection for HCAs.
2. Regarding Item 9, amend its IMP procedures to integrate data from inspections and tests
required under Part 195 into its IMP, such that these data are analyzed along with other
assessment data when establishing assessment intervals.
3. Submit the amended procedures to the Director within 30 days following receipt of this
Order.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent demonstrating good cause for an extension.
Failure to comply with this Order Directing Amendment may result in administrative assessment
of civil penalties not to exceed $100,000 for each violation for each day the violation continues
or in referral to the Attorney General for appropriate relief in a district court of the United States.
WARNING ITEMS
With respect to Items 1(f), 2(a), 2(b), 5(c), and 10, the Notice alleged probable violations of
Part 195 but did not propose a civil penalty or compliance order for these items. Therefore, these
are considered to be warning items. The warnings were for:
49 C.F.R. § 195.452(e)(1)(iv) (Notice Item 1(f)) ─ Respondent’s alleged failure
to conduct an air dispersion analysis for potential impacts on HCAs for most of its
pipelines. In its Response, Respondent indicated that it believed it did not need to
perform such analyses on its pipelines because they were not transporting highly
volatile liquids (HVLs). Respondent is incorrect. Air dispersion can be a
significant transport mechanism for certain components (hydrogen sulfide,
benzene, etc.) of crude and refined products with vapor pressures too high to
qualify as HVLs.5
5 At atmospheric pressure, these components vaporize readily and can be transported at hazardous concentrations
for significant distances. For these commodities, use of a conservative air dispersion analysis technique is important
for determining the segments that could affect a HCA, as well as determining the extent of the consequences in the
event of a release.



10
49 C.F.R. § 195.452(c)(1)(i) (Notice Item 2(a)) ─ Respondent’s alleged failure
to specify or justify in its Baseline Assessment Plan (BAP) the choice of
assessment methods to be used for each pipeline section.
49 C.F.R. § 195.452(c)(2) (Notice Item 2(b)) ─ Respondent’s alleged failure to
include a process for revising its BAP.
49 C.F.R. § 195.452(e)(1) (Notice Item 5(c)) ─ Respondent’s alleged failure to
have a process for populating its risk model data fields using available records
and input from Tesoro’s subject matter experts.
49 C.F.R. § 195.452(l)(1)(ii) (Notice Item 10) ─ Respondent’s alleged failure to
identify the documents to be retained from the segment identification process and
their retention period.
Respondent presented information in its Response showing that it had taken certain actions to
address the cited items. Having considered such information, I find, pursuant to 49 C.F.R. §
190.205, that probable violations of 49 C.F.R. §§ 195.452(c)(1)(i) (Notice Item 2(a)), 49 C.F.R.
§ 195.452(c)(2) (Notice Item 2(b)), 195.452(e)(1) (Notice Item 5(c)), and 195.452(l)(1)(ii)
(Notice Item 10) have occurred and Respondent is hereby advised to correct such conditions. In
the event that OPS finds a violation for any of these items in a subsequent inspection,
Respondent may be subject to future enforcement action.
Under 49 C.F.R. § 190.215, Respondent has a right to submit a Petition for Reconsideration of
this Final Order. The petition must be received within 20 days of Respondent’s receipt of this
Final Order and must contain a brief statement of the issue(s). The filing of the petition
automatically stays the payment of any civil penalty assessed. All other terms of the order,
including any required corrective action and amendment of procedures, shall remain in full force
and effect unless the Associate Administrator, upon request, grants a stay. The terms and
conditions of this Final Order shall be effective upon receipt.
____________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520045033>
- Source ID: `phmsa-enforcement`
- SHA-256: `602ec20f5cbd237d47fbe1a8ece65c00b533e747e2618524d7a09126a0b9cc42`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-23T04:13:23.460Z
- Document slug: `phmsa-enforcement-520045033`

### Source metadata

```json
{
  "cpf": "520045033",
  "operator": "TESORO HIGH PLAINS PIPELINE COMPANY LLC",
  "region": "Western",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.452(b)(3)",
    "195.452(e)",
    "195.452(f)(1)",
    "195.452(f)(4)",
    "195.452(f)(7)",
    "195.452(f)(8)",
    "195.452(i)(1)",
    "195.452(j)(3)",
    "195.452(j)(4)(ii)",
    "195.452(l)(ii)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "520045033_FinalOrder_07092009.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520045033/520045033_FinalOrder_07092009.pdf",
      "bytes": 615597,
      "category": "agency_document"
    },
    {
      "name": "520045033_FinalOrder_07092009_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520045033/520045033_FinalOrder_07092009_text.pdf",
      "bytes": 74556,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "TESORO HIGH PLAINS PIPELINE COMPANY LLC"
}
```