# EXXONMOBIL BILLINGS REFINERY — Notice of Probable Violation

**Citation:** CPF 520055007  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2005-02-11

CLOSED notice of probable violation citing 195.1(c).

## Document text

Notice of Probable Violation involving EXXONMOBIL BILLINGS REFINERY. PHMSA's enforcement data identifies the cited regulation as 195.1(c). The case was opened on 2005-02-11 and is reported as closed as of 2009-07-23. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520055007_Final Order_07232009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520055007/520055007_Final%20Order_07232009.pdf

520055007_Final Order_07232009_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520055007/520055007_Final%20Order_07232009_text.pdf

520055007_Final Order_07232009_text.pdf

JUL 23 2009
Mr. Ian F. Scoble
Director, Refining Americas
ExxonMobil Refining & Supply Company
3225 Gallows Road, Room 6B2112
Fairfax, VA 22037
Re: CPF No. 5-2005-5007
Dear Mr. Scoble:
Enclosed is the Final Order issued in the above-referenced case. It makes a finding of violation
and finds that you have completed the actions specified in the Notice required to comply with the
pipeline safety regulations. This case is now closed. Your receipt of this Final Order constitutes
service of that document under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Chris Hoidal, Director, Western Region, PHMSA
Mr. Ron Kuhler, ExxonMobil Refining & Supply Company
P.O. Box 1163, Billings, Montana 59103
CERTIFIED MAIL – RETURN RECEIPT REQUESTED [7005 0390 0005 6162 5043]



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
______________________________
In the Matter of )
ExxonMobil Refining ) CPF No. 5-2005-5007
& Supply Company, )
)
)
)
Respondent. )
______________________________)
FINAL ORDER
On September 30, 2004, pursuant to 49 U.S.C. § 60117, a representative of the Pipeline and
Hazardous Materials Safety Administration, Office of Pipeline Safety (OPS) conducted an on-
site pipeline safety inspection of the facilities and records of ExxonMobil’s Billings Refinery
breakout tank. As a result of the inspection, the Director, Western Region, OPS (Director),
issued to ExxonMobil Pipeline Company (EMPCo), by letter dated February 11, 2005, a Notice
of Probable Violation and Proposed Compliance Order (Notice). In accordance with
49 C.F.R. § 190.207, the Notice proposed finding that EMPCo had violated 49 C.F.R. Part 195
and proposed ordering Respondent to take certain measures to correct the alleged violation.
EMPCo responded to the Notice by letter dated March 14, 2005, as supplemented by letter dated
March 10, 2006. EMPCo explained that the Billings breakout tank was on the grounds of the
Billings Refinery and informed PHMSA that ExxonMobil Refining & Supply Company was the
appropriate Respondent and would be providing a substantive response to the Notice. On
February 7, 2006, a copy of the Notice was issued to ExxonMobil Refining & Supply Company
(Respondent). By letter dated March 13, 2006, Respondent contested the allegation, offered
information in explanation of the allegations, and requested an informal hearing. A hearing was
held via teleconference on August 9, 2007 at which Respondent was represented by counsel.
Larry L. White from the Office of Chief Counsel, PHMSA, served as Presiding Official. After
the hearing, Respondent provided additional information for the record on September 10, 2007.
FINDING OF VIOLATION
The Notice alleged that Respondent violated 49 C.F.R. Part 195, as follows:



2
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.1(c), which states:
§ 195.1 Applicability.
(a) . . .
(c) Breakout tanks subject to this part must comply with requirements
that apply specifically to breakout tanks and, to the extent applicable, with
requirements that apply to pipeline systems and pipeline facilities. If a conflict
exists between a requirement that applies specifically to breakout tanks and a
requirement that applies to pipeline systems or pipeline facilities, the
requirement that applies specifically to breakout tanks prevails. Anhydrous
ammonia breakout tanks need not comply with §§195.132(b), 195.205(b),
195.242(c) and (d), 195.264(b) and (e), 195.307, 195.428(c) and (d), and
195.432(b) and (c).
Specifically, the Notice alleged that Respondent failed to inspect and maintain Billings Refinery
Tank #2 in accordance with the Part 195 requirements applicable to breakout tanks.
In its Response and during the hearing, Respondent stated that it did not consider Tank #2 to be a
breakout tank. Respondent contended that the surge relief valves at mainline motor-operated
valve locations outside the Billings facility were adequate to protect the mainline system from
pressure surges, without relief from Tank #2. Respondent argued that these mainline
overpressure protection valves would ensure that pipeline pressures could not exceed 110% of
the maximum operating pressure (MOP) during upset conditions. This included a pressure relief
valve at the meter skid. Respondent provided a surge analysis based on scenarios where the
Yellowstone valve closed while a pump station was injecting crude oil into the pipeline, resulting
in pressures corresponding to approximately 108% of MOP. In addition, Respondent stated at
the hearing that, to the best of its knowledge, the tank had never actually received a surge.
Respondent also provided relevant operating records.
At the hearing, OPS countered that the company’s surge modeling was only accurate to within 4-
5% of what the actual pressure would be and that, as a result, the pressures could potentially be
anywhere between 104% and 112% of MOP. Therefore, the pressure control valve in place
would not actually stop the surge and pressure would be relieved into the breakout tank in these
situations. OPS also noted that the pressure relief valve at the meter skid was designed to protect
only the meter skid itself.
Under 49 C.F.R. § 195.2, a breakout tank is defined as:
“… a tank used to (a) relieve surges in a hazardous liquid pipeline system or (b)
receive and store hazardous liquid transported by a pipeline for reinjection and
continued transportation by pipeline.”



3
That same section defines surge pressure as:
“… pressure produced by a change in velocity of the moving stream that results
from shutting down a pump station or pumping unit, closure of a valve, or any
other blockage of the moving stream.”
The definitions of breakout tank and surge pressure do not require that 110% of MOP be
exceeded. Respondent acknowledged that Tank #2 is not isolated from pipeline pressure. Thus,
the potential for the tank to relieve surges in the pipeline system is clearly present. Therefore,
Tank #2 meets the definition of a breakout tank and is subject to the Part 195 breakout tank
requirements, regardless of whether it has yet to actually receive a surge.
Finally, Respondent argued that the applicability of PHMSA’s regulations to its piping ended at
the fenceline of the Billings facility. This is incorrect. It is well established that the exemptions
in the pipeline safety regulations for production, refining, and terminal facilities do not cover
piping on the grounds of such facilities up to the pressure control device inside the facility (see
e.g., 49 C.F.R. § 195.1(b)(7)-(8)), including piping to a breakout tank when present.
Accordingly, after considering all the evidence arguments presented, I find that Respondent
violated 49 C.F.R. § 190.1(c) by failing to inspect and maintain Billings Refinery Tank #2 in
accordance with the Part 195 requirements applicable to breakout tanks.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
COMPLIANCE ORDER
The Notice proposed a Compliance Order with respect to Item 1 in the Notice. Under
49 U.S.C. § 60118(a), each person who engages in the transportation of hazardous liquids or who
owns or operates a pipeline facility is required to comply with the applicable safety standards
established under chapter 601. In its Response, Respondent informed PHMSA that it began
treating Tank #2 as a breakout tank on November 9, 2005, including establishing operating and
maintenance procedures, API inspections, operator qualification and spill response plans, and the
installation of cathodic protection. Accordingly, since compliance has been achieved with
respect to this violation, it is unnecessary to include compliance terms in this Order.
Under 49 C.F.R. § 190.215, Respondent has a right to submit a petition for reconsideration of
this Final Order. Should Respondent elect to do so, the petition must be received within 20 days
of Respondent’s receipt of this Final Order and must contain a brief statement of the issue(s).
The terms of the order, including any required corrective action, shall remain in full force and



4
effect unless the Associate Administrator, upon request, grants a stay. The terms and conditions
of this Final Order are effective upon receipt.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520055007>
- Source ID: `phmsa-enforcement`
- SHA-256: `3cb75c9fa94604c4008b35f2d9b5ebca09fac29df83d2476d53f617a37b6297b`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T23:13:22.819Z
- Document slug: `phmsa-enforcement-520055007`

### Source metadata

```json
{
  "cpf": "520055007",
  "operator": "EXXONMOBIL BILLINGS REFINERY",
  "region": "Western",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.1(c)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "520055007_Final Order_07232009.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520055007/520055007_Final%20Order_07232009.pdf",
      "bytes": 175114,
      "category": "agency_document"
    },
    {
      "name": "520055007_Final Order_07232009_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520055007/520055007_Final%20Order_07232009_text.pdf",
      "bytes": 21680,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "EXXONMOBIL BILLINGS REFINERY"
}
```