# ISLAND ENERGY — Notice of Probable Violation

**Citation:** CPF 520060001  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2006-02-13

CLOSED notice of probable violation citing 192.809(d).

## Document text

Notice of Probable Violation involving ISLAND ENERGY. PHMSA's enforcement data identifies the cited regulation as 192.809(d). The case was opened on 2006-02-13 and is reported as closed as of 2010-10-08. Proposed civil penalty: $5,000. Assessed civil penalty: $0. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520060001_Final Order_10082010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520060001/520060001_Final%20Order_10082010.pdf

520060001_Final Order_10082010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520060001/520060001_Final%20Order_10082010_text.pdf

520060001_Final Order_10082010_text.pdf

OCT 8 2010
Dr. Dean R. Tibbs
Mare Island Operating Company, Inc.
c/o Advanced Energy Strategies
1800 Sutter St., Suite 870
Concord, CA 94520
Mr. David Elder
General Manager, Mare Island
Island Energy
440 Walnut Avenue
Vallejo, CA 94592
Re: CPF No. 5-2006-0001
Dear Dr. Tibbs and Mr. Elder:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation, determines that Mare Island Operating Company, Inc., and Island Energy have
completed the actions specified in the Notice to comply with the pipeline safety regulations, and
withdraws the proposed civil penalty. Therefore, this case is now closed. Service of the Final
Order by certified mail is deemed effective upon the date of mailing, or as otherwise provided
under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Chris Hoidal, Director, Western Region, PHMSA
Mr. Garrett Evans, General Manager
Pittsburg Power Company
City of Pittsburg
65 Civic Avenue
Pittsburg, CA 94565
CERTIFIED MAIL – RETURN RECEIPT REQUESTED [7009 1410 0000 2472 2940]



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
__________________________________________
In the Matter of )
)
)
Mare Island Operating Company, Inc., )
Respondent, )
and )
)
)
)
Pittsburg Power Company, )
d/b/a Island Energy, )
a division of the City of Pittsburg, California, )
a municipal corporation. )
__________________________________________)
) CPF No. 5-2006-0001
FINAL ORDER
On November 16, 2005, pursuant to 49 U.S.C. § 60117, a representative of the Pipeline and
Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS),
conducted an on-site pipeline safety inspection of the facilities and records of a municipal gas
system operated by Mare Island Operating Company, Inc. (MIOC or Respondent), in Vallejo,
California. At the time, MIOC operated the facility pursuant to an agreement with the facility’s
owner, Pittsburg Power Company (PPC), doing business as Island Energy, a public utility owned
by the City of Pittsburg, California, and providing retail electric and natural gas services to Mare
Island, California.
1
As a result of the inspection, the Director, Western Region, OPS (Director), issued to MIOC, by
letter dated February 13, 2006, a Notice of Probable Violation, Proposed Civil Penalty, and
Proposed Compliance Order (Notice). In accordance with 49 C.F.R. § 190.207, the Notice
proposed finding that MIOC had violated 49 C.F.R. § 192.809 and proposed assessing a civil
penalty of $5,000 for the alleged violation. The Notice also proposed ordering MIOC to take
certain measures to correct the alleged violation.
MIOC responded to the Notice by letters dated March 28, 2006, and June 30, 2006 (collectively,
Response). MIOC did not contest the allegation but objected to the civil penalty. The company
agreed to satisfy the terms of the proposed compliance order and described the steps it planned to
take to do so. MIOC did not request a hearing and therefore waived its right to one.
1 Specifically, PPC is a “joint powers authority,” a public entity permitted under California law, and owned by the
City of Pittsburg and the Redevelopment Authority of the City of Pittsburg. See http://www.pittsburgpowerco.com;
http://www.islandenergy.com (last accessed Sept. 1, 2010).



2
The proposed compliance order required MIOC to develop and submit certain written materials
and records to PHMSA, but the company failed to do so. By letter dated December 8, 2009, PPC
explained that the City of Pittsburg had taken over operations of the Mare Island facility and
stated that it had come to the company’s attention that MIOC had never submitted the written
materials and records required by the proposed compliance order. PPC stated that MIOC had
finished developing these materials in May 2007 and attached a copy of the materials with the
letter.
FINDING OF VIOLATION
In its Response, MIOC did not contest the allegation in the Notice that it violated 49 C.F.R. Part
192, as follows:
Item 1: The Notice alleged that MIOC violated 49 C.F.R. § 192.809, which states:
§ 192.809 General.
(a) Operators must have a written qualification program by April 27,
2001. The program must be available for review by the Administrator or
by a state agency participating under 49 U.S.C. Chapter 601 if the
program is under the authority of that state agency.
(b) Operators must complete the qualification of individuals
performing covered tasks by October 28, 2002.
(c) Work performance history review may be used as a sole evaluation
method for individuals who were performing a covered task prior to
October 26, 1999.
(d) After October 28, 2002, work performance history may not be
used as a sole evaluation method.
(e) After December 16, 2004, observation of on-the-job performance
may not be used as the sole method of evaluation.
The Notice alleged that Respondent violated 49 C.F.R. § 192.809 by failing to have a written
qualification program in place as of the date of the OPS inspection. MIOC did not contest this
allegation of violation. Accordingly, based upon a review of all of the evidence, I find that
Respondent violated 49 C.F.R. § 192.809 by failing to have a written qualification program in
place as of the date of the OPS inspection.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against MIOC.
COMPLIANCE ORDER
The Notice proposed a compliance order with respect to Item 1 of the Notice for violation of 49
C.F.R. § 192.809. Under 49 U.S.C. § 60118(a), each person who engages in the transportation
of gas or who owns or operates a pipeline facility is required to comply with the applicable
safety standards established under chapter 601. The Director indicates that MIOC and PPC have
taken the following actions specified in the proposed compliance order:



3
With respect to the violation of § 192.809 (Item 1), MIOC developed, and PPC
submitted, a written qualification program that, upon review, satisfies the
requirements of the regulation.
Accordingly, I find that compliance has been achieved with respect to this violation. Therefore,
the compliance terms proposed in the Notice are not included in this Order.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$100,000 per violation for each day of the violation, up to a maximum of $1,000,000 for any
related series of violations. In determining the amount of a civil penalty under 49 U.S.C.
§ 60122 and 49 C.F.R. § 190.225, I must consider the following criteria: the nature,
circumstances, and gravity of the violation, including adverse impact on the environment; the
degree of Respondent’s culpability; the history of Respondent’s prior offenses; the Respondent’s
ability to pay the penalty and any effect that the penalty may have on its ability to continue doing
business; and the good faith of Respondent in attempting to comply with the pipeline safety
regulations. In addition, I may consider the economic benefit gained from the violation without
any reduction because of subsequent damages, and such other matters as justice may require.
The Notice proposed a total civil penalty of $5,000 for the violation cited above.
Item 1: The Notice proposed a civil penalty of $5,000 for Respondent’s violation of 49 C.F.R.
§ 192.809, for failing to have a written qualification program in place as of the date of the OPS
inspection. Island Energy contends that the proposed penalty should be waived, as this was the
first OPS inspection of its facilities since the company began operations on Mare Island in April
1997. Respondent further states that the anticipated cost of the compliance order, $30,000,
already constitutes a significant investment of its scarce resources.
This case presents unusual circumstances. On the one hand, a small public utility such as Island
Energy, like any other pipeline operator, is subject to potential civil penalties for violating the
Pipeline Safety Laws and Regulations. It is critical that municipal gas systems, like private
utilities, comply with these safety regulations in order to protect their own personnel and the
public from the risk of pipeline accidents. On the other hand, it appears in this case that MIOC is
no longer doing business as a pipeline operator and that PPC was not served with the Notice and
notified that it could face the possible imposition of a civil penalty. Accordingly, I find that
these circumstances constitute “such other matters as justice may require,” and that they
necessitate the withdrawal of the proposed penalty of $5,000.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520060001>
- Source ID: `phmsa-enforcement`
- SHA-256: `f23245c3a26b07614c26b3e11f0770bd30cfe5f7637e82433feadbacfbe039b6`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T23:18:31.519Z
- Document slug: `phmsa-enforcement-520060001`

### Source metadata

```json
{
  "cpf": "520060001",
  "operator": "ISLAND ENERGY",
  "region": "Western",
  "pipelineType": "GAS INTRASTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.809(d)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "520060001_Final Order_10082010.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520060001/520060001_Final%20Order_10082010.pdf",
      "bytes": 188712,
      "category": "agency_document"
    },
    {
      "name": "520060001_Final Order_10082010_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520060001/520060001_Final%20Order_10082010_text.pdf",
      "bytes": 26275,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "ISLAND ENERGY"
}
```