# FAIRBANKS NATURAL GAS — Notice of Amendment

**Citation:** CPF 520080011M  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2008-05-02

CLOSED notice of amendment citing 192.453, 192.465(a), 192.605(a).

## Document text

Notice of Amendment involving FAIRBANKS NATURAL GAS. PHMSA's enforcement data identifies the cited regulations as 192.453,  192.465(a),  192.605(a). The case was opened on 2008-05-02 and is reported as closed as of 2009-04-29. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520080011M_notice of amendment_05022008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520080011M/520080011M_notice%20of%20amendment_05022008.pdf

520080011m_notice of amendment_05022008_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520080011M/520080011m_notice%20of%20amendment_05022008_text.pdf

520080011M_operator response_05162008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520080011M/520080011M_operator%20response_05162008.pdf

520080011M_operator response_10012008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520080011M/520080011M_operator%20response_10012008.pdf

520080011m_notice of amendment_05022008_text.pdf

O
U. S. Department
of Transportation
Pipeline and
Hazardous Materials Safety
Administration
12300 W Dakota Ave, Suite 110
Lakewood, CO 80228
NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT RE UESTED
May 2, 2008
Mr. Dan Britton
President
Fairbanks Natural Gas
3408 International Way
Fairbanks, AK 99701-9701
CPF 5-200S-0011M
Dear Mr. Britton:
On August 24 and November 14-15, 2007, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code,
inspected the Fairbanks Natural Gas procedures for Operations and Maintenance (OAM) near
Big Lake, Alaska.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
Fairbanks Natural Gas's plans or procedures, as described below:
$192. 605 Procedural manual for operations, maintenance, and emergencies
Each operator shall include the following in its operating and maintenance
plan:
(a) General. Each operator shall prepare and follow for each pipeline, a
manual of written procedures for conducting operations and maintenance
activities and for emergency response. For transmission lines, the manual must
also include procedures for handling abnormal operations. This manual must
be reviewed and updated by the operator at intervals not exceeding 15 months,
but at least one each calendar year. This manual must be prepared before
operations of a pipeline system commence. Appropriate parts of the manual
must be kept at locations where operations and maintenance activities are
conducted.



(c) Abnormal operation. For transmission lines, the manual required by
paragraph (a) of this section must include procedures for the following to provide
safety when operating design limits have been exceeded:
(1) Responding to, investigating, and correcting the cause of:
(i) Unintended closure of valves or shutdowns;
At the time of the inspection, Fairbanks Natural Gas's O&M Manual did not have an adequate
abnormal operating procedure to demonstrate that they must respond to, investigate, and correct
the cause of unintended valve closures or shut downs.
2. $192. 605 Procedural manual for operations, maintenance, and emergencies
Each operator shall include the following in its operating and maintenance plan:
(b) Maintenance and normal operations. The manual required by paragraph (a)
of this section must include procedures for the following, if applicable, to provide
safety during maintenance and operations.
(1) Operating, maintaining, and repairing the pipeline in accordance with
each of the requirements of this subpart and Subpart M of this part.
$192. 453 General. (Requirements for Corrosion Control)
The corrosion control procedures required by $192. 605(b)(2), including those for
the design, installation, operation, and maintenance of cathodic protection systems,
must be carried out by, or under the direction of, a person qualified in pipeline
corrosion control methods.
At the time of the inspection, Fairbanks Natural Gas's O&M Manual for Corrosion Control did
not have an adequate procedure to demonstrate that the design, installation, operation, and
maintenance of the cathodic protection system must be carried out by, or under the direction of,
a person qualified in pipeline corrosion control methods.
3. $192. 465 External corrosion control: Monitoring.
(a) Each pipeline that is under cathodic protection must be tested at least once each
calendar year, but with intervals not exceeding 15 months, to determine whether
the cathodic protection meets the requirements of $192. 463. However, if tests at
those intervals are impractical for separately protected short sections of mains or
transmission line, not in excess of 100 feet (30 meters), or separately protected
service line, these pipelines may be surveyed on a sampling basis. At least 10
percent of these protected structures, distributed over the entire system must be
surveyed each calendar year, with a different 10 percent checked each subsequent
year, so that the entire system is tested in each 10-year period.
At the time of the inspection, Fairbanks Natural Gas's O&M Manual for Cathodic Protection
did not have an adequate procedure to demonstrate that they must perform annual pipe-to-soil
readings to accurately monitor the effectiveness of the cathodic protection system.



Res onse to this Notice
This Notice is provided pursuant to 49 U. S. C. $ 60108(a) and 49 C. F, R. $ 190. 237. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies
for confidential treatment under 5 U. S. C. 552(b), along with the complete original document
you must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted information
qualifies for confidential treatment under 5 U. S. C. 552(b). If you do not respond within 30 days
of receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in
this Notice, you may be ordered to amend your plans or procedures to correct the inadequacies
(49 C. F. R, $ 190. 237). If you are not contesting this Notice, we propose that you submit your
amended procedures to my office within 30 days of receipt of this Notice. This period may be
extended by written request for good cause. Once the inadequacies identified herein have been
addressed in your amended procedures, this enforcement action will be closed.
In correspondence concerning this matter, please refer to CPF 5-200S-0011M and, for each
document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
i
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 B. Brown (4118827)
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520080011M>
- Source ID: `phmsa-enforcement`
- SHA-256: `ea314dc2bebf35d64c39c57d5908281fd945d51af3760caf5ff1f879254fedeb`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T22:34:32.950Z
- Document slug: `phmsa-enforcement-520080011m`

### Source metadata

```json
{
  "cpf": "520080011M",
  "operator": "FAIRBANKS NATURAL GAS",
  "region": "Western",
  "pipelineType": "GAS INTRASTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.453",
    "192.465(a)",
    "192.605(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 4,
  "attachments": [
    {
      "name": "520080011M_notice of amendment_05022008.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520080011M/520080011M_notice%20of%20amendment_05022008.pdf",
      "bytes": 156530,
      "category": "agency_document"
    },
    {
      "name": "520080011m_notice of amendment_05022008_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520080011M/520080011m_notice%20of%20amendment_05022008_text.pdf",
      "bytes": 167972,
      "category": "agency_document"
    },
    {
      "name": "520080011M_operator response_05162008.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520080011M/520080011M_operator%20response_05162008.pdf",
      "bytes": 40567,
      "category": "party_submission"
    },
    {
      "name": "520080011M_operator response_10012008.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520080011M/520080011M_operator%20response_10012008.pdf",
      "bytes": 283226,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "FAIRBANKS NATURAL GAS"
}
```