# GAS TRANSMISSION NORTHWEST LLC — Notice of Amendment

**Citation:** CPF 520081003M  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2008-01-09

CLOSED notice of amendment citing 192.227, 192.479, 192.745(a).

## Document text

Notice of Amendment involving GAS TRANSMISSION NORTHWEST LLC. PHMSA's enforcement data identifies the cited regulations as 192.227,  192.479,  192.745(a). The case was opened on 2008-01-09 and is reported as closed as of 2008-03-03. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520081003M_notice of amendment_01092008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520081003M/520081003M_notice%20of%20amendment_01092008.pdf

520081003m_notice of amendment_01092008_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520081003M/520081003m_notice%20of%20amendment_01092008_text.pdf

520081003M_operator_response_01182008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520081003M/520081003M_operator_response_01182008.pdf

520081003m_notice of amendment_01092008_text.pdf

&EXT T t CGVi'
Hardcopy t i» Lt 1 i n t«i
iioiC:op;e~ t. I&, S (~7
12300 W Dakota Ave, Suite 110
Lakewood, CO 80228
U. S. Depariment
of Transportation
Pipeline and
Hazardous Naterlals Safety
Administration
NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT RK UESTED
January 9, 2008
Ross Parker
Regional Director
TransCanada — Gas Transmission Northwest
1400 SW 5th Avenue
Suite 900
Portland, OR 97201
CPF 5-200S-1003M
Dear Mr. Parker:
On June 25 to 29, 2007, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected
TransCanada procedures for operations and maintenance in Spokane, Washington,
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
TransCanada plans or procedures, as described below:
$192. 605 Procedural manual for operations, maintenance, and emergencies
Each operator shall include the following in its operating and maintenance plan:
(b) Maintenance and normal operations. The manual required by paragraph (a)
of this section must include procedures for the following, if applicable, to provide
safety during maintenance and operations.
(1) Operating, maintaining, and repairing the pipeline in accordance with each of
the requirements of this subpart and Subpart M of this part.
And



$192. 713 Transmission lines: Permanent field repair of imperfections and
damages.
(a) Each imperfection or damage that impairs the serviceability of pipe in a steel
transmission line operating at or above 40 percent of SMYS must be-
(1) Removed by cutting out and replacing a cylindrical piece of pipe; or
(2) Repaired by a method that reliable engineering tests and analyses show can
permanently restore the serviceability of the pipe.
(b) Operating pressure must be at a safe level during repair operations.
The following procedure was found to be inadequate for qualifying welders.
$192. 227 Qualification of welders.
(a) Except as provided in paragraph (b) of this section, each welder must be
qualified in accordance with section 6 of API 1104 (incorporated by reference, see g
192. 7) or section IX of the ASME Boiler and Pressure Vessel Code (incorporated by
reference, see g 192. 7). However, a welder qualified under an earlier edition than
listed in g 192. 7 of this part may weld but may not requalify under that earlier
edition.
(b) A welder may qualify to perform welding on pipe to be operated at a pressure
that produces a hoop stress of less than 20 percent of SMYS by performing an
acceptable test weld, for the process to be used, under the test set forth in section I
of Appendix C of this part. Each welder who is to make a welded service line
connection to a main must also first perform an acceptable test weld under section
II of Appendix C of this part as a requirement of the qualifying test.
TransCanada's welder qualification procedure shown on Drawing Number 61-E-W-4
does reference those sections of API 1104 that provide guidance for welder qualification.
Instead this procedure references CFR 49 Part 192 Appendix A for the current edition of
API 1104.
49 CFR 192 can not be used as a reference for procedures required by 49 CFR 192.
Instead an operator's procedure must provide reference to the applicable industry
standard that has been incorporated by reference into 49 CFR 192.
$192. 479 Atmospheric corrosion control; General.
(a) Each operator must clean and coat each pipeline or portion of pipeline that is
exposed to the atmosphere, except pipelines under paragraph (c) of this section.
(b) Coating material must be suitable for the prevention of atmospheric corrosion.
(c) Except portions of pipelines in offshore splash zones or soil-to-air interfaces, the
operator need not protect from atmospheric corrosion any pipeline for which the
operator demonstrates by test, investigation, or experience appropriate to the
environment of the pipeline that corrosion will—
(1) Only be a light surface oxide; or
(2) Not affect the safe operation of the pipeline before the next scheduled
inspection.



TransCanada's procedure CC-31, Operation and Maintenance Instruction Sheet,
Inspections of Aboveground Gas Piping Atmospheric Corrosion does not specifically
require coating at the air to soil interface if the coating is found deficient This
procedure only states that remedial actions will be taken if corrosion found.
49 CFR 192. 479(c) requires that TransCanada have a procedure that requires coating
suitable to prevent corrosion of soil to air interfaces regardless if corrosion is not
evident.
$192. 745 Valve maintenance: Transmission lines.
(a) Each transmission line valve that might be required during any emergency
must be inspected and partially operated at intervals not exceeding 15 months, but
at least once each calendar year.
TransCanada Operating Procedures (TOP) for Valve and Valve Operator M24
Inspection and Valve and Valve Operator M24 Leak Inspection/Cycle Test only requires
this testing and inspection occur at an interval not to exceed 15 months.
An operator's procedure must provide guidance for testing and inspection of valves once
each calendar year. Additionally an operator must also provide guidance that in addition
to the testing inspection once each calendar year, the period of time between these
inspections cannot exceed 15 months.
Res onse to this Notice
This Notice is provided pursuant to 49 U. S. C. ) 60108(a) and 49 C. F. R. ) 190. 237. Enclosed as
part of this Notice is a document entitled Response Options for Pipehne Operators in
Compliance Proceedings, Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies
for confidential treatment under 5 U, S. C. 552(b), along with the complete original document
you must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you beheve the redacted information
qualifies for confidential treatment under 5 U S. C 552(b) If you do not respond withm 30 days
of receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in
this Notice, you may be ordered to amend your plans or procedures to correct the inadequacies
(49 C. F. R ) 190. 237). If you are not contesting this Notice, we propose that you submit your
amended procedures to my office within 30 days of receipt of this Notice. This period may be
extended by written request for good cause. Once the inadequacies identified herein have been
addressed in your amended procedures, this enforcement action will be closed.



In correspondence concerning this matter, please refer to CPF 5-200S-1003M and, for each
document you submit, please provide a copy in electronic format whenever possible.
Si cerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 G. Davis ¹118881
Enclosure: Response Options for Pipeline Operators tn Compitance Proceedings

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520081003M>
- Source ID: `phmsa-enforcement`
- SHA-256: `6c108cfbc263b2ff8715aa78e2a6e30852013c81eedf458570ddea87c7448ccf`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T11:17:30.055Z
- Document slug: `phmsa-enforcement-520081003m`

### Source metadata

```json
{
  "cpf": "520081003M",
  "operator": "GAS TRANSMISSION NORTHWEST LLC",
  "region": "Western",
  "pipelineType": "GAS INTERSTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.227",
    "192.479",
    "192.745(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 3,
  "attachments": [
    {
      "name": "520081003M_notice of amendment_01092008.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520081003M/520081003M_notice%20of%20amendment_01092008.pdf",
      "bytes": 41552,
      "category": "agency_document"
    },
    {
      "name": "520081003m_notice of amendment_01092008_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520081003M/520081003m_notice%20of%20amendment_01092008_text.pdf",
      "bytes": 179424,
      "category": "agency_document"
    },
    {
      "name": "520081003M_operator_response_01182008.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520081003M/520081003M_operator_response_01182008.pdf",
      "bytes": 19763,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "GAS TRANSMISSION NORTHWEST LLC"
}
```