## Document text

Warning Letter involving VENOCO, INC. PHMSA's enforcement data identifies the cited regulations as 192.911,  192.935(b). The case was opened on 2008-09-10 and is reported as closed as of 2008-09-10. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520081006W_warning letter_09102008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520081006W/520081006W_warning%20letter_09102008.pdf

520081006w_warning letter_09102008_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520081006W/520081006w_warning%20letter_09102008_text.pdf

520081006w_warning letter_09102008_text.pdf

U. S. Department
of Transportation
Plpellilne and
Hazardous Maferlialls Safety
Admilnilsfirafiion
12300 W Dakota Ave, Suite 110
Lakewood, CO 80228
WA~IXG KKTTKR
September 10, 2008
Mr Keith Wenal
Manager
Venoco Incorporated
6267 Carpinteria Ave.
,
Carpinteria, CA 93103
4100
CPF 5-2008-1006W
Dear Mr. Wenal
On July 23 to 27, 2007, representatives of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 Unites States Code, inspected Venoco
Incorporated's (Venoco) Integrity Management Program (IMP) in Carpinteria, California
As a result of the inspection, it appears that you have committed probable violations of the
Pipehne Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and the
probable violations are:
$ 192. 911 What are the elements of an integrity management programs
An operator's initial integrity management program begins with a framework (see
$192. 907) and evolves into a more detailed and comprehensive integrity
management, program, as information ils gained and inco~po~ated into the p~ogram.
An operator must make continual improvements to its program. The ilniltial
program framework andi subsequent program must, at minimum, contain the



Venoco's lMP plan failed to verify that data elements were brought together and
analyzed in their context such that integrated data can provide improved confidence
with respect to determining the relevance of specific threats and can support an improved
analysis of overall risk.
g 192. 935 What additional preventive and mitigative measures must an operatoi
takeT
(1) Third party damage. An operator must enhance its damage prevention
program, as required ~nder )192. 614 of this part, with respect to a cove~ed segment
to prevent and minimize the consequences of a release due to third party damage.
Enhanced measures to an existing damage prevention program include, at a
(iv) Monitoring of excavations conducted on covered pipehne segments by pipeHne
personneL If an operator finds physical evidence of encroachment invollving
excavation that the operator did not monitor near a covered segment, an operator
must eithei excavate the area near the encroachment or conduct an above ground
survey using methods defined in NACK RP — 0502 — 2002 (incorporated by reference,
see $192. 7). An operator must excavate, and remediate, in accordance with
ANSI/ASMK 831. 8S and $192. 933 any indication of coating hohdays or
discontinuity warranting direct examination.
Venoco's lMP plan failed to address preventive and mitigative requirements regarding
threats due to third-party damage such as the implementation of enhancements to the
required Damage Prevention Program with respect to covered segments to prevent and
minimize the consequences of a release



Under 49 United States Code, ( 60122, you are subject to a civil penalty not to exceed $100, 00
for each violation for each day the violation persists up to a maximum of $1, 000, 000 for any
related series of violations. We have reviewed the circumstances and supporting documents
involved in this case, and have decided not to conduct additional enforcement action or penalty
assessment proceedings at this time. We advise you to correct the item identified in this letter.
Failure to do so will result Venoco Incorporated being subject to additional enforcement action
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 5-ZOO8-]I OO6W. Be advised that all material you submit in response to this enforcement
action is subject to being made pubhcly available. If you beheve that any portion of your
responsive material qualifies for confidential treatment under 5 U. S. C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you beheve quahfy for confidential treatment redacted and an explanation of why you beheve
the redacted inforination quahfies for confidential treatment under 5 U. S C 552(b)
Sincerely,
( Chris Hoidal
Director, Western Region
Pipelme and Hazardous Materials Safety Administration
cc: PHP-60 Comphance Registry
PHP-500 P Nguyen (0119231)

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520081006W>
- Source ID: `phmsa-enforcement`
- SHA-256: `66e84e4f386a97740884cf1b4b2871c4849674f10e1fea146de15955076462b6`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T22:23:58.500Z
- Document slug: `phmsa-enforcement-520081006w`

### Source metadata

```json
{
  "cpf": "520081006W",
  "operator": "VENOCO, INC",
  "region": "Western",
  "pipelineType": "GAS INTERSTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.911",
    "192.935(b)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 2,
  "attachments": [
    {
      "name": "520081006W_warning letter_09102008.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520081006W/520081006W_warning%20letter_09102008.pdf",
      "bytes": 219151,
      "category": "agency_document"
    },
    {
      "name": "520081006w_warning letter_09102008_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520081006W/520081006w_warning%20letter_09102008_text.pdf",
      "bytes": 202627,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "VENOCO, INC"
}
```