# ALYESKA PIPELINE SERVICE CO — Warning Letter

**Citation:** CPF 520085001W  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2008-02-27

CLOSED warning letter citing 195.202, 195.214, 195.228(b).

## Document text

Warning Letter involving ALYESKA PIPELINE SERVICE CO. PHMSA's enforcement data identifies the cited regulations as 195.202,  195.214,  195.228(b). The case was opened on 2008-02-27 and is reported as closed as of 2008-02-27. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520085001W_operator response_03272008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520085001W/520085001W_operator%20response_03272008.pdf

520085001W_region response to operator response_04292008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520085001W/520085001W_region%20response%20to%20operator%20response_04292008.pdf

520085001W_warning letter_02272008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520085001W/520085001W_warning%20letter_02272008.pdf

520085001W_warning letter_02272008.pdf

SENT TO COMPLLANCE REGISTE
Hardcopy-.
# of Copies L/ Date 2/27/08
U.S. Department
12300 W. Dakota Ave., Suite 110
of Transportation
Lakewood, CO 80228
Pipeline and
Administration
Hazardous Materials Safety
WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
February 27, 2008
Mr. Jim Johnson
Vice President
Alyeska Pipeline Company
P.O. Box 196606
Anchorage, AK 99519
:
CPF 5-2008-5001W
Dear Mr. Johnson:
In July 12, 2007, representatives of the Pipeline and Hazardous Materials Satet
dministration (PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected you
Strategic Reconfiguration (SR) piping at Pump Station #3 on the North Slope of Alaska.
PHMSA Alaska staff and our third-party consultant, Oak Ridge National Laboratories,
conducted a review of x-ray film and procedures which concluded on October 31, 2007. While
all welds were eventually determined to be acceptable, our review revealed several
discrepancies in the original recordkeeping, weld procedures, and the standards of weld
acceptability.
As a result of the inspections, it appears that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and the
probable violations are:
1.
§195.202 Compliance with specifications or standards.



Each pipeline system must be constructed in accordance with comprehensive written
specification or standards that are consistent with the requirements of this part.
During 2006, Alyeska Pipeline Service Company constructed the SR piping at Pump
Station #3. Alyeska's construction procedure W-3.7, Visual Welding Inspection, requires
100% visual inspection of 49 CFR 195 girth welds and associated documentation.
Records of visual inspection of pump station girth welds were reviewed but, Alyeska
could not find visual inspection records for nine welds. We did, however, find satisfactory
Non-Destructive Testing (NDT) records for all welds.
2. §195.228 Welds and welding inspection: Standards of acceptability
(b)The acceptability of a weld is determined according to the standards in Section 9
of API 1104. However, if a girth weld is unacceptable under those standards for a
reason other than a crack, and if Appendix A to API 1104 applies to the weld, the
acceptability of the weld may be determined under that appendix.
PHMSA, in conjunction with non-destruction testing specialist from the Oak Ridge
National Laboratory, examined the radiographs of Pump Station #3 welds for compliance
with API 1104 Section 9. Four welds were identified that contained un-repaired defects
that the NDT contractor failed to detect. Additionally, eleven radiographs were found to
contain unacceptable film density or penetrameters. Finally, Alyeska initially failed to
identify these radiographic deficiencies and defective welds. All of the inadequate films
were eventually reshot, and all defects repaired.
3.
$195.214 Welding procedures.
(a) Welding must be performed by a qualified welder in accordance with welding
procedures qualified under Section 5 of API 1104 or Section IX of the ASME Boiler
and Pressure Vessel Code.
PHMSA and experts from the Oak Ridge National Laboratories examined the welding
procedures used to complete the welding at Pump Station #3. There were 24 deficiencies
identified in these procedures. These deficiencies were brought to the attention of
Alyeska's engineers.
Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed $100,000
for each violation for each day the violation persists up to a maximum of $1,000,000 for any
related series of violations. We have reviewed the circumstances and supporting documents
involved in this case, and have decided not to conduct additional enforcement action or penalty
assessment proceedings at this time. We advise you to correct the items identified in this letter.
Failure to do so will result in Alyeska Pipeline Service Company being subject to additional
enforcement action.
2



No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 5-2008-5001 W. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
Sincerely,
A Harde
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
CC:
PHP-60 Compliance Registry
PHP-500 B. Flanders (#118831)
3

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520085001W>
- Source ID: `phmsa-enforcement`
- SHA-256: `61354a7425a74490c812dc100ec2153f072adf02f6ee06c116ddf7b09da8f7ec`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-23T15:17:33.760Z
- Document slug: `phmsa-enforcement-520085001w`

### Source metadata

```json
{
  "cpf": "520085001W",
  "operator": "ALYESKA PIPELINE SERVICE CO",
  "region": "Western",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.202",
    "195.214",
    "195.228(b)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 3,
  "attachments": [
    {
      "name": "520085001W_operator response_03272008.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520085001W/520085001W_operator%20response_03272008.pdf",
      "bytes": 339640,
      "category": "party_submission"
    },
    {
      "name": "520085001W_region response to operator response_04292008.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520085001W/520085001W_region%20response%20to%20operator%20response_04292008.pdf",
      "bytes": 45627,
      "category": "party_submission"
    },
    {
      "name": "520085001W_warning letter_02272008.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520085001W/520085001W_warning%20letter_02272008.pdf",
      "bytes": 152254,
      "category": "agency_document"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "ALYESKA PIPELINE SERVICE CO"
}
```