# TESORO REFINING & MARKETING COMPANY, LLC — Notice of Amendment

**Citation:** CPF 520090001M  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2009-01-06

CLOSED notice of amendment citing 192.227(a), 192.241(c), 192.243(a), 192.609, 192.611(a), 192.705(a), 192.706(a).

## Document text

Notice of Amendment involving TESORO REFINING & MARKETING COMPANY, LLC. PHMSA's enforcement data identifies the cited regulations as 192.227(a),  192.241(c),  192.243(a),  192.609,  192.611(a),  192.705(a),  192.706(a). The case was opened on 2009-01-06 and is reported as closed as of 2010-03-09. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520090001M_Notice of Amendment_01062009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520090001M/520090001M_Notice%20of%20Amendment_01062009.pdf

520090001M_Notice of Amendment_01062009_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520090001M/520090001M_Notice%20of%20Amendment_01062009_text.pdf

520090001M_operator response_02032009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520090001M/520090001M_operator%20response_02032009.pdf

520090001M_operator response_12302009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520090001M/520090001M_operator%20response_12302009.pdf

520090001M_Notice of Amendment_01062009_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
January 6, 2009
Mr. Michael McCann
Vice President of Pipeline and Terminals
Tesoro Refining and Marketing Company
300 Concord Plaza Drive
San Antonio, TX 78216-6999
CPF 5-2009-0001M
Dear Mr. McCann:
On September 9-11, 2008, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected Tesoro
Refining and Marketing Company’s (TRMC) procedures for Operations and Maintenance
Procedural Manuals in Wilmington, California.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
TRMC’s plans or procedures, as described below:
1. §192.227 Welders: Qualification of welders.
(a) Except as provided in paragraph (b) of this section, each welder must be
qualified in accordance with section 6 of API 1104 (incorporated by reference, see
§ 192.7) or section IX of the ASME Boiler and Pressure Vessel Code (incorporated
by reference, see § 192.7). However, a welder qualified under an earlier edition
than listed in § 192.7 of this part may weld but may not requalify under that earlier
edition.



Tesoro Refining and Marketing Company does not specify in its Operation and
Maintenance (O&M) manuals what section and edition of API 1104 need to be used to
qualify its Welder. TRMC’s Operations and Maintenance Manuals only require its
welders to be qualified according to API 1104. TRMC’s O&M manual do not explicitly
reference the appropriate industry standard to be used to qualify its welders.
2. §192.241 Inspection and test of welds
(c) The acceptability of a weld that is nondestructively tested or visually inspected
is determined according to the standards in Section 9 of API Standard 1104
(incorporated by reference, see §192.7). However, if a girth weld is unacceptable
under those standards for a reason other than a crack, and if Appendix A to API
1104 applies to the weld, the acceptability of the weld may be further determined
under that appendix.
Tesoro Refining and Marketing Company does not specify in its O&M manuals what
section and edition of API 1104 need to be used to inspect its welds. TRMC’s
Operations and Maintenance states, “NDT testing shall conform to API 1104.” TRMC’s
O&M manual do not explicitly reference the industry standard to be used to inspect and
accept their welds.
3. §192.243 Nondestructive testing
(a) Nondestructive testing of welds must be performed by any process, other than
trepanning, that will clearly indicate defects that may affect the integrity of the
weld.
(b) Nondestructive testing of welds must be performed:
(1) In accordance with written procedures; and
(2) By persons who have been trained and qualified in the established procedures
and with the equipment employed in testing.
(c) Procedures must be established for the proper interpretation of each
nondestructive test of a weld to ensure the acceptability of the weld under
§192.241(c).
(d) When nondestructive testing is required under §192.241(b), the following
percentages of each day's field butt welds, selected at random by the operator, must
be nondestructively tested over their entire circumference;
(1) In Class 1 locations, except offshore, at least 10 percent.
(2) In Class 2 locations, at least 15 percent.
(3) In Class 3 and Class 4 locations, at crossings of major or navigable rivers,
offshore, and within railroad or public highway rights-of-way, including tunnels,
bridges, and overhead road crossings, 100 percent unless impracticable, in which
case at least 90 percent. Nondestructive testing must be impracticable for each
girth weld not tested.
(4) At pipeline tie-ins, including tie-ins of replacement sections, 100 percent.
2



(e) Except for a welder whose work is isolated from the principal welding activity,
a sample of each welder's work for each day must be nondestructively tested, when
nondestructive testing is required under §192.241(b).
(f) When nondestructive testing is required under §192.241(b), each operator must
retain, for the life of the pipeline, a record showing by milepost, engineering station,
or by geographic feature, the number of girth welds made, the number
nondestructively tested, the number rejected, and the disposition of the rejects.
Tesoro Refining and Marketing Company does not have adequate O&M procedures for
nondestructive testing. If TRMC has a separate welding manual, and if that manual
addresses nondestructive testing, then it should be included or referenced in its O&M
manuals.
4. 192.609 Change in class location: Required study.
Whenever an increase in population density indicates a change in class location for
a segment of an existing steel pipeline operating at a hoop stress that is more than
40 percent of SMYS, or indicates that the hoop stress corresponding to the
established maximum allowable operating pressure for a segment of existing
pipeline is not commensurate with the present class location, the operator shall
immediately make a study to determine;
(a) The present class location for the segment involved.
(b) The design, construction, and testing procedures followed in the original
construction, and a comparison of these procedures with those required for the
present class location by the applicable provisions of this part.
(c) The physical condition of the segment to the extent it can be ascertained from
available records;
(d) The operating and maintenance history of the segment;
(e) The maximum actual operating pressure and the corresponding operating hoop
stress, taking pressure gradient into account, for the segment of pipeline involved;
and,
(f) The actual area affected by the population density increase, and physical
barriers or other factors which may limit further expansion of the more densely
populated area.
Tesoro Refining and Marketing Company does not have adequate procedures to
periodically determine changes in class location. TRMC previously identified its
pipeline to be in class 1 location. A recent class location study conducted by an outside
contractor identified the pipeline to be located in a class 2 & 3, however, procedures to
determine future class changes are not in the TRMC O&M manual.
5. 192.611 Change in class location: Confirmation or revision of maximum allowable
operating pressure.
(a) If the hoop stress corresponding to the established maximum allowable
3



operating pressure of a segment of pipeline is not commensurate with the present
class location, and the segment is in satisfactory physical condition, the maximum
allowable operating pressure of that segment of pipeline must be confirmed or
revised according to one of the following requirements:
(1) If the segment involved has been previously tested in place for a period of not
less than 8 hours, the maximum allowable operating pressure is 0.8 times the test
pressure in Class 2 locations, 0.667 times the test pressure in Class 3 locations, or
0.555 times the test pressure in Class 4 locations. The corresponding hoop stress
may not exceed 72 percent of the SMYS of the pipe in Class 2 locations, 60 percent
of SMYS in Class 3 locations, or 50 percent of SMYS in Class 4 locations.
(2) The maximum allowable operating pressure of the segment involved must be
reduced so that the corresponding hoop stress is not more than that allowed by this
part for new segments of pipelines in the existing class location.
(3) The segment involved must be tested in accordance with the applicable
requirements of Subpart J of this part, and its maximum allowable operating
pressure must then be established according to the following criteria:
(i) The maximum allowable operating pressure after the requalification test is 0.8
times the test pressure for Class 2 locations, 0.667 times the test pressure for Class 3
locations, and 0.555 times the test pressure for Class 4 locations.
(ii) The corresponding hoop stress may not exceed 72 percent of the SMYS of the
pipe in Class 2 locations, 60 percent of SMYS in Class 3 locations, or 50 percent of
SMYS in Class 4 locations.
(b) The maximum allowable operating pressure confirmed or revised in
accordance with this section, may not exceed the maximum allowable operating
pressure established before the confirmation or revision.
(c) Confirmation or revision of the maximum allowable operating pressure of a
segment of pipeline in accordance with this section does not preclude the
application of §§192.553 and 192.555.
(d) Confirmation or revision of the maximum allowable operating pressure that is
required as a result of a study under §192.609 must be completed within 24 months
of the change in class location. Pressure reduction under paragraph (a) (1) or (2) of
this section within the 24-month period does not preclude establishing a maximum
allowable operating pressure under paragraph (a)(3) of this section at a later date.
Tesoro Refining and Marketing Company does not have adequate procedures to
establish MAOP limits that are commensurate with changes in class location. TRMC
changed its pipeline location from class 1 to class 2 & 3 without confirming if the
existing MAOP meets the new class locations.
6. §192.705 Transmission lines: Patrolling
(a) Each operator shall have a patrol program to observe surface conditions on
and adjacent to the transmission line right-of-way for indications of leaks,
construction activity, and other factors affecting safety and operation.
(b) The frequency of patrols is determined by the size of the line, the operating
4



pressures, the class location, terrain, weather, and other relevant factors, but
intervals between patrols may not be longer than prescribed in the following table:
Class
location
of line
Maximum interval between patrols
At highway and
railroad crossings At all other places
1,2 7 1/2 months; but at least
twice each calendar year
15 months; but at least
once each calendar year
3 4 1/2 months; but at least
four times each calendar
year
7 1/2 months; but at least
twice each calendar year
4 4 1/2 months; but at least
four times each calendar
year
4 1/2 months; but at least
four times each calendar year
Tesoro Refining and Marketing Company’s new class location study identified its
pipeline to be located in both class 2 and 3 areas. TRMC’s O&M manuals still require
once-a-year ROW patrolling as if the pipeline were in a class 1 or 2 area. The O&M
manuals need to be revised to meet the requirements of §192.705(b).
7. §192.706 Transmission lines: Leakage surveys
Leakage surveys of a transmission line must be conducted at intervals not
exceeding 15 months, but at least once each calendar year. However, in the case of
a transmission line which transports gas in conformity with §192.625 without an
odor or odorant, leakage surveys using leak detector equipment must be
conducted-
(a) In Class 3 locations, at intervals not exceeding 7 1/2 months, but at least twice
each calendar year; and
(b) In Class 4 locations, at intervals not exceeding 4 1/2 months, but at least four
times each calendar year.
Tesoro Refining and Marketing Company’s new class location study identified its
pipeline to be in a class 2 and 3 area. TRMC, in its O&M manuals, still require once per
year leakage survey. The O&M manuals need to be revised to meet the periodic survey
requirements of §192.706.
5



Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies
for confidential treatment under 5 U.S.C. 552(b), along with the complete original document
you must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted information
qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not respond within 30 days
of receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in
this Notice, you may be ordered to amend your plans or procedures to correct the inadequacies
(49 C.F.R. § 190.237). If you are not contesting this Notice, we propose that you submit your
amended procedures to my office within 60 days of receipt of this Notice. This period may be
extended by written request for good cause. Once the inadequacies identified herein have been
addressed in your amended procedures, this enforcement action will be closed.
In correspondence concerning this matter, please refer to CPF 5-2009-0001M and, for each
document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
6

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520090001M>
- Source ID: `phmsa-enforcement`
- SHA-256: `1c43c07804ab0c425c5d5a66db58f0e11c37add5f5230e4f6526aa887b39cdf9`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T09:50:40.468Z
- Document slug: `phmsa-enforcement-520090001m`

### Source metadata

```json
{
  "cpf": "520090001M",
  "operator": "TESORO REFINING & MARKETING COMPANY, LLC",
  "region": "Western",
  "pipelineType": "GAS INTRASTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.227(a)",
    "192.241(c)",
    "192.243(a)",
    "192.609",
    "192.611(a)",
    "192.705(a)",
    "192.706(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 4,
  "attachments": [
    {
      "name": "520090001M_Notice of Amendment_01062009.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520090001M/520090001M_Notice%20of%20Amendment_01062009.pdf",
      "bytes": 370748,
      "category": "agency_document"
    },
    {
      "name": "520090001M_Notice of Amendment_01062009_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520090001M/520090001M_Notice%20of%20Amendment_01062009_text.pdf",
      "bytes": 31396,
      "category": "agency_document"
    },
    {
      "name": "520090001M_operator response_02032009.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520090001M/520090001M_operator%20response_02032009.pdf",
      "bytes": 138557,
      "category": "party_submission"
    },
    {
      "name": "520090001M_operator response_12302009.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520090001M/520090001M_operator%20response_12302009.pdf",
      "bytes": 746557,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "TESORO REFINING & MARKETING COMPANY, LLC"
}
```