# PHILLIPS 66 PIPELINE LLC — Notice of Probable Violation

**Citation:** CPF 520095015  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2009-03-17

CLOSED notice of probable violation citing 195.452(h)(3).

## Document text

Notice of Probable Violation involving PHILLIPS 66 PIPELINE LLC. PHMSA's enforcement data identifies the cited regulation as 195.452(h)(3). The case was opened on 2009-03-17 and is reported as closed as of 2011-08-19. Proposed civil penalty: $30,000. Assessed civil penalty: $30,000. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520095015_Final Order_07222011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520095015/520095015_Final%20Order_07222011.pdf

520095015_Final Order_07222011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520095015/520095015_Final%20Order_07222011_text.pdf

520095015_NOPV PCP_03172009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520095015/520095015_NOPV%20PCP_03172009.pdf

520095015_NOPV PCP_03172009_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520095015/520095015_NOPV%20PCP_03172009_text.pdf

520095015_operator response_04162009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520095015/520095015_operator%20response_04162009.pdf

520095015_Final Order_07222011_text.pdf

JUL 22 2011
Mr. Dennis Smith
President
ConocoPhillips Pipeline Company
600 North Dairy Ashford
P.O. Box 2197
Houston, Texas 77252-2197
Re: CPF No. 5-2009-5015
Dear Mr. Smith:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and assesses a civil penalty of $30,000. The penalty payment terms are set forth in the
Final Order. This enforcement action closes automatically upon receipt of payment. Service of
the Final Order by certified mail is deemed effective upon the date of mailing, or as otherwise
provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Alan Mayberry, Deputy Associate Administrator for Field Operations, Pipeline Safety
Mr. Chris Hoidal, Director, Western Region, PHMSA
Mr. Todd Tullio, Manager, Regulatory Compliance, ConocoPhillips Pipeline Company
Mr. Van P. Williams, Esq., Senior Counsel, ConocoPhillips
CERTIFIED MAIL - RETURN RECEIPT REQUESTED [7005 1160 0001 0075 9602]



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
ConocoPhillips Pipeline Company, ) CPF No. 5-2009-5015
)
Respondent. )
____________________________________)
FINAL ORDER
On October 31, 2008, pursuant to 49 U.S.C. § 60117, a representative of the Pipeline and
Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), met
with ConocoPhillips Pipeline Company (CPPL or Respondent) to discuss repairs on its Denver-
Chase Pipeline System. CPPL is a wholly-owned subsidiary of ConocoPhillips. CPPL operates
more than 11,000 miles of pipelines and more than 60 storage terminals in the United States.1
After this meeting, the Director, Western Region, OPS (Director), issued to Respondent, by letter
dated March 17, 2009, a Notice of Probable Violation and Proposed Civil Penalty (Notice). In
accordance with 49 C.F.R. § 190.207, the Notice proposed finding that CPPL had committed a
violation of 49 C.F.R. § 195.452(h)(3) and proposed assessing a civil penalty of $30,000 for the
alleged violation.
CPPL responded to the Notice by letters dated April 16, 2009 and July 17, 2009 (collectively,
Response). Respondent contested the allegations and requested a hearing which was
subsequently held on July 29, 2009 in Washington, D.C., with an attorney from the Office of
Chief Counsel, PHMSA, presiding. CPPL was represented by counsel at the hearing. CPPL
elected not to submit a post-hearing brief.
FINDING OF VIOLATION
The Notice alleged that Respondent violated 49 C.F.R. Part 195, as follows:
Item 1: The Notice alleged that Respondent violated 49 C.F.R. § 195.452(h)(3), which states in
relevant part:
1 http://www.conocophillipspipeline.com/EN/Pages/index.aspx (last accessed April 21, 2011).



2
§ 195.452 Pipeline integrity management in high consequence areas.
(h) What actions must an operator take to address integrity issues?
(3) Schedule for evaluation and remediation. An operator must
complete remediation of a condition according to a schedule prioritizing
the conditions for evaluation and remediation. If an operator cannot meet
the schedule for any condition, the operator must explain the reasons why
it cannot meet the schedule and how the changed schedule will not
jeopardize public safety or environmental protection.
OPS alleged in the Notice that Respondent violated 49 C.F.R. § 195.452(h)(3) by failing to
remediate a condition on the Denver-Chase pipeline system according to a prioritized schedule
meeting certain deadlines specified in the regulations and failing to explain the reasons why it
could not meet this schedule. Specifically, ConocoPhillips was required under § 195.452(h)(3)
to explain how its modified schedule for the repairs on the Denver-Chase line would not
jeopardize public safety or environmental protection.
Specifically, the Notice alleged that ConocoPhillips had received the MFL Caliper Combo tool
assessment report on November 27, 2007 for the Denver-Chase line which revealed seven
anomalies, some of which met the criteria for immediate action. Although the operator initially
planned a temporary pressure deration of 80% of the maximum operating pressure (MOP),
Respondent modified this plan and instead reduced the pressure to less than 20% SMYS while
the anomalies were repaired. At the October 31, 2008 meeting, CPPL divulged that a
notification had not been submitted to the PHMSA Integrity Management Database in November
2007 informing OPS of the modified schedule for repairs on the line. OPS argued that pursuant
to § 195.452(h)(3), ConocoPhilips should have notified OPS of the reasons why it could not
meet the original repair deadlines and more importantly explain how the modified schedule
would not jeopardize public or environmental safety.2 At the hearing, Respondent
acknowledged that the explanation was never filed but stated that a clerical error was the reason
why it was never sent to OPS.
ConocoPhillips had an obligation under the pipeline safety regulations to submit a notice to
PHMSA explaining the reasons why the repair schedule was modified and how this change
would not jeopardize the safety of the environment and the public. I have reviewed the evidence
presented in this case and find that ConocoPhillips failed to comply with this regulation.
Accordingly, after considering all of the evidence, I find that Respondent violated 49 C.F.R.
§ 195.452(h)(3) by failing to explain the reasons why it could not meet the schedule for
remediating the repair on the Denver-Chase line and how the modified schedule would not
jeopardize the safety of the public or the environment.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
2 The process for filing IMP notifications with PHMSA is summarized in 49 C.F.R. § 195.452(m).



3
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$100,000 per violation for each day of the violation, up to a maximum of $1,000,000 for any
related series of violations. In determining the amount of a civil penalty under 49 U.S.C.
§ 60122 and 49 C.F.R. § 190.225, I must consider the following criteria: the nature,
circumstances, and gravity of the violation, including adverse impact on the environment; the
degree of Respondent’s culpability; the history of Respondent’s prior offenses; the Respondent’s
ability to pay the penalty and any effect that the penalty may have on its ability to continue doing
business; and the good faith of Respondent in attempting to comply with the pipeline safety
regulations. In addition, I may consider the economic benefit gained from the violation without
any reduction because of subsequent damages, and such other matters as justice may require.
The Notice proposed a total civil penalty of $30,000 for the violation cited above.
Item 1: The Notice proposed a civil penalty of $30,000 for Respondent’s violation of 49 C.F.R.
§ 195.452(h)(3), for failing to provide OPS with an explanation of why it could not meet the
schedule for remediation of an immediate repair condition on the Denver-Chase pipeline. At the
hearing, Respondent argued that the civil penalty should be reduced since the failure to notify
was not intentional, the line was a low pressure line and therefore low risk, and the company
took conservative measures by decreasing the pressure to less than 20% of SMYS.
ConocoPhillips also argued that the safety of the public and the environment were never in
jeopardy due to the pressure decrease to less than 20% SMYS. In addition, Respondent noted
that it enhanced its IMP program to prevent future omissions by creating a formal
communication log to track complex derations and status of notifications.
The civil penalty is supported, in particular, by the gravity of the violation. The Denver-Chase
pipeline is located in a high consequence area and one of the anomalies was in a designated
wetland area. Although OPS did not argue that the failure to submit the notification was
intentional, OPS viewed the omission as a significant risk to public safety. It prohibited OPS
from evaluating Respondent’s remedial measures at the time of implementation and limited
further discussion if additional safety considerations were required. This pressure deration
occurred in a high consequence area and therefore it is particularly important that OPS have the
opportunity to elevate alternative safety measures while the anomalies are undergoing repairs.
OPS was not informed of the schedule modification until a year after the pressure reduction was
instituted. OPS should have been included in the collaborative process to develop an alternative
measure.
In its Response and at the hearing, ConocoPhillips argued that the pressure reduction ensured
that the modified schedule did not compromise the safety of the public or the environment and
therefore a civil penalty reduction is appropriate. The fact that this modified schedule did not
impact the safety of the public or the environment does not cure the violation. Respondent was
required to explain how the modified schedule would not create a safety issue and failed to do so.
In addition, Respondent is culpable since it was aware of the required notification process and
yet failed to use it. Having reviewed the civil penalty factors, including but not limited to the
nature, circumstances and gravity of the violation and the operator’s culpability, I find that the
proposed civil penalty amount is appropriate. Accordingly, having reviewed the record and



4
considered the assessment criteria, I assess Respondent a civil penalty of $30,000 for violating
49 C.F.R. § 195.452(h)(3).
Payment of the civil penalty must be made within 20 days of service. Federal regulations
(49 C.F.R. § 89.21(b)(3)) require such payment to be made by wire transfer through the Federal
Reserve Communications System (Fedwire), to the account of the U.S. Treasury. Detailed
instructions are contained in the enclosure. Questions concerning wire transfers should be
directed to: Financial Operations Division (AMZ-341), Federal Aviation Administration, Mike
Monroney Aeronautical Center, P.O. Box 269039, Oklahoma City, Oklahoma 73125. The
Financial Operations Division telephone number is (405) 954-8893.
Failure to pay the $30,000 civil penalty will result in accrual of interest at the current annual rate
in accordance with 31 U.S.C. § 3717, 31 C.F.R. § 901.9 and 49 C.F.R. § 89.23. Pursuant to
those same authorities, a late penalty charge of six percent (6%) per annum will be charged if
payment is not made within 110 days of service. Furthermore, failure to pay the civil penalty
may result in referral of the matter to the Attorney General for appropriate action in a district
court of the United States.
Under 49 C.F.R. § 190.215, Respondent has the right to submit a Petition for Reconsideration of
this Final Order. The petition must be sent to: Associate Administrator, Office of Pipeline
Safety, PHMSA, 1200 New Jersey Avenue, SE, East Building, 2nd Floor, Washington, DC
20590, with a copy sent to the Office of Chief Counsel, PHMSA, at the same address. PHMSA
will accept petitions received no later than 20 days after receipt of service of the Final Order by
the Respondent, provided they contain a brief statement of the issue(s) and meet all other
requirements of 49 C.F.R. § 190.215. The filing of a petition automatically stays the payment of
any civil penalty assessed but does not stay any other provisions of the Final Order, including
any required corrective actions. If Respondent submits payment of the civil penalty, the Final
Order becomes the final administrative decision and the right to petition for reconsideration is
waived.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520095015>
- Source ID: `phmsa-enforcement`
- SHA-256: `6074f3da83c1d02d90f55e0d520557bddf204e4bdba604144b7ebed2c5acc9fb`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T23:12:36.176Z
- Document slug: `phmsa-enforcement-520095015`

### Source metadata

```json
{
  "cpf": "520095015",
  "operator": "PHILLIPS 66 PIPELINE LLC",
  "region": "Western",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.452(h)(3)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "520095015_Final Order_07222011.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520095015/520095015_Final%20Order_07222011.pdf",
      "bytes": 321560,
      "category": "agency_document"
    },
    {
      "name": "520095015_Final Order_07222011_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520095015/520095015_Final%20Order_07222011_text.pdf",
      "bytes": 31460,
      "category": "agency_document"
    },
    {
      "name": "520095015_NOPV PCP_03172009.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520095015/520095015_NOPV%20PCP_03172009.pdf",
      "bytes": 121198,
      "category": "case_document"
    },
    {
      "name": "520095015_NOPV PCP_03172009_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520095015/520095015_NOPV%20PCP_03172009_text.pdf",
      "bytes": 16249,
      "category": "case_document"
    },
    {
      "name": "520095015_operator response_04162009.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520095015/520095015_operator%20response_04162009.pdf",
      "bytes": 90390,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 1,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "PHILLIPS 66 PIPELINE LLC"
}
```