# ALYESKA PIPELINE SERVICE CO — Notice of Amendment

**Citation:** CPF 520100011M  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2010-03-23

CLOSED notice of amendment citing 192.481(a).

## Document text

Notice of Amendment involving ALYESKA PIPELINE SERVICE CO. PHMSA's enforcement data identifies the cited regulation as 192.481(a). The case was opened on 2010-03-23 and is reported as closed as of 2010-07-27. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520100011M_closure letter_07272010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520100011M/520100011M_closure%20letter_07272010.pdf

520100011M_closure letter_07272010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520100011M/520100011M_closure%20letter_07272010_text.pdf

520100011M_notice of amendment_03232010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520100011M/520100011M_notice%20of%20amendment_03232010.pdf

520100011M_notice of amendment_03232010_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520100011M/520100011M_notice%20of%20amendment_03232010_text.pdf

520100011M_operator response_04222010.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520100011M/520100011M_operator%20response_04222010.pdf

520100011M_operator response_070910.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520100011M/520100011M_operator%20response_070910.pdf

520100011M_notice of amendment_03232010_text.pdf

NOTICE OF AMENDMENT
VIA FEDERAL EXPRESS (FEDEX) – 8726 2779 5540
March 23, 2010
Mr. Mike Joynor
Vice President
Alyeska Pipeline Service Company
900 E. Benson Blvd.
P.O. Box 196660
Anchorage, AK 99519
CPF 5-2010-0011M
Dear Mr. Joynor:
On July 6-9, 2009, July 21, 2009, and August 12, 2009, representatives of the Pipeline and
Hazardous Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United
States Code, inspected Alyeska Pipeline Service Company’s (Alyeska) procedures for operations
and maintenance of the Alyeska Fuel Gas Line in Fairbanks and Anchorage, Alaska.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
Alyeska’s plans and procedures, as described below:
1. 192.481 Atmospheric corrosion control: Monitoring.
(a) Each operator must inspect each pipeline or portion of pipeline that is exposed
to the atmosphere for evidence of atmospheric corrosion, as follows:



If the pipeline is lo-
cated:
Then the frequency of inspection is:
Onshore ..................... Offshore .................... At least once every 3 calendar years,
but with intervals not exceeding 39
months
At least once each calendar year, but
with intervals not exceeding 15
months
Alyeska’s procedures for atmospheric corrosion control are inadequate because they do not: (a)
specify all the locations which require atmospheric corrosion inspections; and (b) the
atmospheric corrosion inspection frequency is not consistent with §192.481.
During the inspection, Alyeska presented the following documents as their atmospheric
corrosion control procedures: (1) FG-79, Operating, Maintenance & Emergency Plans for the
Fuel Gas Pipeline, Edition 4, Revision 8, dated August 28, 2008; (2) MP-166-3.03, Facility
Corrosion Integrity Monitoring, Revision 9, dated April 25, 2008; and (3) MP-166-3.03-01,
Facility Corrosion Integrity Monitoring Engineering and Implementation, Revision 1, dated
April 29, 2008.
(a) Alyeska’s procedures specifically list the gas mainline valve bypass piping as being covered
by the procedures. However, the procedures remain silent as to the other locations on the Fuel
Gas Line which must also be inspected for atmospheric corrosion.
(b) Alyeska’s procedures do not require atmospheric corrosion inspection frequency of at least
once every 3 calendar years, but with interval not exceeding 39 months.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies for
confidential treatment under 5 U.S.C. 552(b), along with the complete original document you
must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted information
qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not respond within 30 days
of receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue a Final Order.
2



If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in
this Notice, you may be ordered to amend your plans or procedures to correct the inadequacies
(49 C.F.R. § 190.237). If you are not contesting this Notice, we propose that you submit your
amended procedures to my office within 45 days of receipt of this Notice. This period may be
extended by written request for good cause. Once the inadequacies identified herein have been
addressed in your amended procedures, this enforcement action will be closed.
In correspondence concerning this matter, please refer to CPF 5-2010-0011M and, for each
document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Dennis Hinnah
Deputy Director, Western Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
cc: PHP-60 Compliance Registry
PHP-500 T. Johnson (#123870)
3

520100011M_closure letter_07272010_text.pdf

CERTIFIED MAIL – RETURN RECEIPT REQUESTED[7007 2560 0000 7825 9396]
July 27, 2010
Mr. Mike Joynor
Vice President
Alyeska Pipeline Service Company
900 E. Benson Blvd.
P.O. Box 196660
Anchorage, AK 99519
CPF 5-2010-0011M
Dear Mr. Joynor:
On July 6-9, 2009, July 21, 2009, and August 12, 2009, representatives from the Pipeline and
Hazardous Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United
States Code, conducted an on-site pipeline safety inspection of Alyeska Pipeline Service
Company’s (Alyeska) procedures for the Alyeska Fuel Gas Line in Fairbanks and
Anchorage, Alaska. As a result of the inspection, Alyeska was issued a Notice of
Amendment on March 23, 2010, which proposed amendment of your procedures.
Alyeska submitted its amended procedures on April 22, 2010 and July 9, 2010. My staff has
reviewed the amended procedures, and it appears that the inadequacies outlined in the Notice
of Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank
you for your cooperation.
Sincerely,
Dennis W. Hinnah
Deputy Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 T. Johnson (#123870)

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520100011M>
- Source ID: `phmsa-enforcement`
- SHA-256: `efe9454eee7b708886ec22fba84355e3e029f92d5f1bbea04dd0640f9fd46bf2`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T12:19:51.213Z
- Document slug: `phmsa-enforcement-520100011m`

### Source metadata

```json
{
  "cpf": "520100011M",
  "operator": "ALYESKA PIPELINE SERVICE CO",
  "region": "Western",
  "pipelineType": "GAS INTRASTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.481(a)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 6,
  "attachments": [
    {
      "name": "520100011M_closure letter_07272010.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520100011M/520100011M_closure%20letter_07272010.pdf",
      "bytes": 28471,
      "category": "agency_document"
    },
    {
      "name": "520100011M_closure letter_07272010_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520100011M/520100011M_closure%20letter_07272010_text.pdf",
      "bytes": 9828,
      "category": "agency_document"
    },
    {
      "name": "520100011M_notice of amendment_03232010.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520100011M/520100011M_notice%20of%20amendment_03232010.pdf",
      "bytes": 99130,
      "category": "agency_document"
    },
    {
      "name": "520100011M_notice of amendment_03232010_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520100011M/520100011M_notice%20of%20amendment_03232010_text.pdf",
      "bytes": 17370,
      "category": "agency_document"
    },
    {
      "name": "520100011M_operator response_04222010.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520100011M/520100011M_operator%20response_04222010.pdf",
      "bytes": 1483228,
      "category": "party_submission"
    },
    {
      "name": "520100011M_operator response_070910.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520100011M/520100011M_operator%20response_070910.pdf",
      "bytes": 1527146,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "ALYESKA PIPELINE SERVICE CO"
}
```
