# CENEX PIPELINE LLC — Notice of Amendment

**Citation:** CPF 520115018M  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2011-07-26

CLOSED notice of amendment citing 195.452(f), 195.452(f)(3), 195.452(f)(5), 195.452(j), 195.452(j)(4)(i).

## Document text

Notice of Amendment involving CENEX PIPELINE LLC. PHMSA's enforcement data identifies the cited regulations as 195.452(f),  195.452(f)(3),  195.452(f)(5),  195.452(j),  195.452(j)(4)(i). The case was opened on 2011-07-26 and is reported as closed as of 2011-11-30. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520115018M_closure letter_11302011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520115018M/520115018M_closure%20letter_11302011.pdf

520115018M_closure letter_11302011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520115018M/520115018M_closure%20letter_11302011_text.pdf

520115018M_notice of amendment_07262011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520115018M/520115018M_notice%20of%20amendment_07262011.pdf

520115018M_notice of amendment_07262011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520115018M/520115018M_notice%20of%20amendment_07262011_text.pdf

520115018M_Operator Response to Notice_09202011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520115018M/520115018M_Operator%20Response%20to%20Notice_09202011.pdf

520115018M_notice of amendment_07262011_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
July 26, 2011
Mr. Daniel Knepper
President and Chief Operating Officer
Cenex Pipeline Company
803 Highway 212 South
Laurel, MT 59044
CPF 5-2011-5018M
Dear Mr. Knepper:
On August 16 through September 03, 2010, representatives of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code,
inspected CHS’s integrity management program procedures to include the Cenex Pipeline
Company (Cenex) in Laurel, Montana.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within
Cenex’s plans or procedures, as described below:
1. §195.452 Pipeline integrity management in high consequence areas
§195.452(f) What are the elements of an integrity management program? An integrity
management program begins with the initial framework. An operator must continually
change the program to reflect operating experience, conclusions drawn from results of
the integrity assessments, and other maintenance and surveillance data, and evaluation
of consequences of a failure on the high consequence area. An operator must include,
at minimum, each of the following elements in its written integrity management
program:



A) §195.452(f)(5) A continual process of assessment and evaluation to maintain a
pipeline's integrity (see paragraph (j) of this section);
CHS’s Integrity Management Program (IMP) pertaining to continual process of assessment
and evaluation refers a CHS Procedure titled "Data Validation and Integration" at the
following locations: Article 4.5 Assessment Planning page 21, Article 6.5 Repair Procedures
page 52, Article 7.9 Evaluating Integrity Assessment Results page 61, and Verification and
Remediation Digs page 182. However, this procedure could not be found within their IMP
Manual. CHS/Cenex must amend their IMP Manual to reference the correct procedures that
CHS/Cenex will be used during the evaluation process and other various pipeline integrity
activities to meet the requirement of Part 195.452(f)(5).
B) §195.452(f)(5) A continual process of assessment and evaluation to maintain a
pipeline's integrity (see paragraph (j) of this section);
(j) What is a continual process of evaluation and assessment to maintain a
pipeline's integrity?
(1) General. After completing the baseline integrity assessment, an operator
must continue to assess the line pipe at specified intervals and periodically
evaluate the integrity of each pipeline segment that could affect a high
consequence area.
CHS’s IMP pertaining to continual process of evaluation and assessment the line pipe at
specified intervals after completing the baseline integrity assessment is inadequate. At the
time of inspection, CHS/Cenex described a process for completing annual evaluation and
assessment reviews of their pipeline that was in disagreement with CHS’s IMP Article 7.1
"Annual Evaluation and Assessment Review. CHS/Cenex must amend their procedures to
accurately describe the process that CHS/Cenex will be used during their annual evaluation
and assessment reviews of their pipeline to meet the requirement of Part 195.452(j)(1).
C) §195.452(f) (5) A continual process of assessment and evaluation to maintain a
pipeline's integrity (see paragraph (j) of this section);
(j) What is a continual process of evaluation and assessment to maintain a
pipeline's integrity?
(4) Variance from the 5-year intervals in limited situations-
(i) Engineering basis. An operator may be able to justify an engineering basis
for a longer assessment interval on a segment of line pipe. The justification
must be supported by a reliable engineering evaluation combined with the use
of other technology, such as external monitoring technology, that provides an
understanding of the condition of the line pipe equivalent to that which can be
obtained from the assessment methods allowed in paragraph (j)(5) of this
section. An operator must notify OPS 270 days before the end of the five-year
(or less) interval of the justification for a longer interval, and propose an
alternative interval. An operator must send the notice to the address specified
in paragraph (m) of this section.
2



CHS’s IMP did not include the PHMSA address where notifications pertaining to the
variance from the five (5) year assessment intervals are required to meet the requirement of
Part 195.452(j)(4)(i).
D) §195.452(f)(4) Criteria for remedial actions to address integrity issues raised by
the assessment methods and information analysis (see paragraph (h) of this
section);
(h) What actions must an operator take to address integrity issues?
(1) General requirements. An operator must take prompt action to address all
anomalous conditions the operator discovers through the integrity assessment
or information analysis. In addressing all conditions, an operator must
evaluate all anomalous conditions and remediate those that could reduce a
pipeline's integrity. An operator must be able to demonstrate that the
remediation of the condition will ensure the condition is unlikely to pose a
threat to the long-term integrity of the pipeline. An operator must comply with
§ 195.422 when making a repair.
(i) Temporary pressure reduction. An operator must notify PHMSA, in
accordance with paragraph (m) of this section, if the operator cannot meet the
schedule for evaluation and remediation required under paragraph (h)(3) of
this section and cannot provide safety through a temporary reduction in
operating pressure.
(ii) Long-term pressure reduction. When a pressure reduction exceeds 365
days, the operator must notify PHMSA in accordance with paragraph (m) of
this section and explain the reasons for the delay. An operator must also take
further remedial action to ensure the safety of the pipeline.
CHS’s IMP did not include the PHMSA address where a notification must be sent whenever
Cenex cannot adhere to either a 365 day limit on a pressure reduction or repair/remediation
of an anomaly within the required time limits. Article 12.6 from their IMP Manual states, "If
CHS determines that it cannot complete repair/remediation of an anomaly within the time
limits specified in its Repair/Remediation Criteria, CHS will submit such notice to the
address specified in §195.452(m). The notice will provide a complete explanation of the
situation and proposed plan for repair/remediation completion." An operator’s procedure
cannot refer to Part 195 for instructions that its personnel must take to be in compliance with
Part 195.
E) §195.452(f)(4) Criteria for remedial actions to address integrity issues raised by
the assessment methods and information analysis (see paragraph (h) of this
section);
(h) What actions must an operator take to address integrity issues?
(4) Special requirements for scheduling remediation
(i) Immediate repair conditions. An operator's evaluation and remediation
schedule must provide for immediate repair conditions. To maintain safety, an
operator must temporarily reduce operating pressure or shut down the
pipeline until the operator completes the repair of these conditions. An
3



operator must calculate the temporary reduction in operating pressure using
the formula in Section 451.6.2.2 (b) of ANSI/ ASME B31.4 (incorporated by
reference, see § 195.3). An operator must treat the following conditions as
immediate repair conditions:
(A) Metal loss greater than 80% of nominal wall regardless of dimensions.
(B) A calculation of the remaining strength of the pipe shows a predicted
burst pressure less than the established maximum operating pressure at the
location of the anomaly. Suitable remaining strength calculation methods
include, but are not limited to, ASME/ANSI B31G (``Manual for Determining
the Remaining Strength of Corroded Pipelines'' (1991) or AGA Pipeline
Research Committee Project PR-3-805 (``A Modified Criterion for Evaluating
the Remaining Strength of Corroded Pipe'' (December 1989)). These
documents are incorporated by reference and are available at the addresses
listed in Sec. 195.3.
(C) A dent located on the top of the pipeline (above the 4 and 8 o'clock
positions) that has any indication of metal loss, cracking or a stress riser.
(D) A dent located on the top of the pipeline (above the 4 and 8 o'clock
positions) with a depth greater than 6% of the nominal pipe diameter.
(E) An anomaly that in the judgment of the person designated by the operator
to evaluate the assessment results requires immediate action.
CHS’s IMP for responding to immediate repair conditions did not reference their O&M
Manual's Safety-Related Condition Report (SRCR) procedure. A safety-related condition
must be filed if the repair cannot be made within five (5) days of determination or ten (10)
days of discovery. CHS/Cenex must amend their procedures to include a reporting
requirement pertaining to safety-related condition report.
F) §195.452(f)(3) An analysis that integrates all available information about the
integrity of the entire pipeline and the consequences of a failure (see paragraph
(g) of this section);
(g) What is an information analysis? In periodically evaluating the integrity of
each pipeline segment (paragraph (j) of this section), an operator must analyze
all available information about the integrity of the entire pipeline and the
consequences of a failure. This information includes:
(3) Data gathered in conjunction with other inspections, tests, surveillance
and patrols required by this Part, including, corrosion control monitoring and
cathodic protection surveys;
CHS’s IMP pertaining to information analysis did not adequately demonstrate the decision
process to meet the requirement of Part 195.452(g). CHS/Cenex conducted their annual
evaluations by using the CHS risk analysis algorithm as a tool to integrate and analyze
integrity information related to their pipeline. However, the risk analysis algorithm under
“Threats” categories did not include all the factors that may have been discovered since the
last annual evaluation and assessment review. As an example, there were no risk scoring
items for defects found attributable to the third party intervention, corrosion, pipe
manufacturing, poor construction practices, operator error, or natural events. It is important
4



that the risk assessment is reflected the defects found in the past attributable to various
threats to the pipeline if the risk assessment is used as a tool for information analysis during
evaluations.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b). If you do not respond within 30 days of receipt of this Notice,
this constitutes a waiver of your right to contest the allegations in this Notice and authorizes the
Associate Administrator for Pipeline Safety to find facts as alleged in this Notice without further
notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in this
Notice, you may be ordered to amend your plans or procedures to correct the inadequacies (49
C.F.R. § 190.237). If you are not contesting this Notice, we propose that you submit your
amended procedures to my office within 60 days of receipt of this Notice. This period may be
extended by written request for good cause. Once the inadequacies identified herein have been
addressed in your amended procedures, this enforcement action will be closed.
It is requested (not mandated) that Cenex maintain documentation of the safety improvement costs
associated with fulfilling this Notice of Amendment (preparation/revision of plans, procedures)
and submit the total to Chris Hoidal, Director, Western Region, Pipeline and Hazardous Materials
Safety Administration.
In correspondence concerning this matter, please refer to CPF 5-2011-5018M and, for each
document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
cc: PHP-60 Compliance Registry
PHP-500 G. Davis (#129363)
5

520115018M_closure letter_11302011_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
November 30, 2011
Mr. Daniel Knepper
President and Chief Operating Officer
Cenex Pipeline Company
803 Highway 212 South
Laurel, MT 59044
CPF 5-2011-5018M
Dear Mr. Knepper:
On August 16 through September 3, 2010 a representative from the Pipeline and Hazardous
Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code,
conducted an on-site pipeline safety inspection of Cenex Pipeline Company‘s (Cenex)
integrity management program procedures in Laurel, Montana. As a result of the inspection,
Cenex was issued a Notice of Amendment on July 26, 2011, which proposed amendment of
your integrity management program procedures.
Cenex submitted its amended procedures on September 20, 2011. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of
Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank
you for your cooperation.
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 (G Davis, #129363)

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520115018M>
- Source ID: `phmsa-enforcement`
- SHA-256: `664506bd42f8a7fec827423ea1eaed323c82a31663e876c14c6944ca364aaf79`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-24T21:52:18.694Z
- Document slug: `phmsa-enforcement-520115018m`

### Source metadata

```json
{
  "cpf": "520115018M",
  "operator": "CENEX PIPELINE LLC",
  "region": "Western",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.452(f)",
    "195.452(f)(3)",
    "195.452(f)(5)",
    "195.452(j)",
    "195.452(j)(4)(i)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "520115018M_closure letter_11302011.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520115018M/520115018M_closure%20letter_11302011.pdf",
      "bytes": 55127,
      "category": "agency_document"
    },
    {
      "name": "520115018M_closure letter_11302011_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520115018M/520115018M_closure%20letter_11302011_text.pdf",
      "bytes": 9602,
      "category": "agency_document"
    },
    {
      "name": "520115018M_notice of amendment_07262011.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520115018M/520115018M_notice%20of%20amendment_07262011.pdf",
      "bytes": 518455,
      "category": "agency_document"
    },
    {
      "name": "520115018M_notice of amendment_07262011_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520115018M/520115018M_notice%20of%20amendment_07262011_text.pdf",
      "bytes": 31524,
      "category": "agency_document"
    },
    {
      "name": "520115018M_Operator Response to Notice_09202011.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520115018M/520115018M_Operator%20Response%20to%20Notice_09202011.pdf",
      "bytes": 841664,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "CENEX PIPELINE LLC"
}
```