# XTO ENERGY INC — Notice of Amendment

**Citation:** CPF 520126016M  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2012-10-24

CLOSED notice of amendment citing 195.440(b), 195.440(d).

## Document text

Notice of Amendment involving XTO ENERGY INC. PHMSA's enforcement data identifies the cited regulations as 195.440(b),  195.440(d). The case was opened on 2012-10-24 and is reported as closed as of 2013-03-12. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520126016M_closure letter_03122013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520126016M/520126016M_closure%20letter_03122013.pdf

520126016M_closure letter_03122013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520126016M/520126016M_closure%20letter_03122013_text.pdf

520126016M_notice of amendment_10242012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520126016M/520126016M_notice%20of%20amendment_10242012.pdf

520126016M_notice of amendment_10242012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520126016M/520126016M_notice%20of%20amendment_10242012_text.pdf

520126016M_operator response_11162012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520126016M/520126016M_operator%20response_11162012.pdf

520126016M_closure letter_03122013_text.pdf

VIA UPS 2ND DAY AIR: 1Z WR2 588 02 9694 5550
March 12, 2013
Mr. Dale Goleman
DOT Compliance Coordinator
XTO Energy Inc.
810 Houston St.
Fort Worth, Texas 76102-6298
CPF 5-2012-6016M
Dear Mr. Goleman:
On October 1, 2012, a representative from the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an
on-site pipeline safety inspection of XTO Energy Inc.’s procedures in Anchorage, Alaska.
As a result of the inspection, XTO Energy Inc. was issued a Notice of Amendment on
October 24, 2012, which proposed amendment of your procedures.
XTO Energy Inc. submitted its amended procedures on February 13, 2013. My staff has
reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice
of Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank
you for your cooperation.
Sincerely,
Dennis Hinnah
Deputy Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 B. Flanders (#139754)

520126016M_notice of amendment_10242012_text.pdf

NOTICE OF AMENDMENT
VIA UPS 2ND DAY AIR: 1Z WR2 588 02 9652 1472
October 24, 2012
Mr. Timothy Friesenhahn
Vice President of Operations Permian Division
XTO Energy Inc.
810 Houston St.
Fort Worth, Texas 76102
CPF 5-2012-6016M
Dear Mr. Friesenhahn:
On October 1, 2012, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected XTO
Energy Inc.’s (XTO) procedures and records for its Public Awareness Program in
Anchorage, Alaska via teleconference.
On the basis of that inspection, PHMSA has identified the following apparent inadequacies
found within XTO’s plans and procedures, as described below:
1. §195.440 Public Awareness
(b) The operator's program must follow the general program recommendations of
API RP 1162 and assess the unique attributes and characteristics of the operator's
pipeline and facilities.
XTO’s public awareness program does not include the size and number of tanks at XTO’s
Nikiski tank farm or inform stakeholders that the natural gas transported is unodorized.
2. §195.440 Public Awareness
(d) The operator's program must specifically include provisions to educate the
public, appropriate government organizations, and persons engaged in excavation
related activities on:



(1) Use of a one-call notification system prior to excavation and other damage
prevention activities;
(2) Possible hazards associated with unintended releases from a hazardous liquid or
carbon dioxide pipeline facility;
(3) Physical indications that such a release may have occurred;
(4) Steps that should be taken for public safety in the event of a hazardous liquid or
carbon dioxide pipeline release; and
(5) Procedures to report such an event.
The Operator Mailing and handouts need to state the following information:
- Hazards of an unintended release of Natural Gas or Crude oil;
- The physical indications of a release;
- Steps that need to be taken for public safety;
- Procedures to report a release.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed
as part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies
for confidential treatment under 5 U.S.C. 552(b), along with the complete original document
you must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted
information qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not respond
within 30 days of receipt of this Notice, this constitutes a waiver of your right to contest the
allegations in this Notice and authorizes the Associate Administrator for Pipeline Safety to
find facts as alleged in this Notice without further notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged
in this Notice, you may be ordered to amend your plans or procedures to correct the
inadequacies (49 C.F.R. § 190.237). If you are not contesting this Notice, we propose that
you submit your amended procedures to my office within 90 days of receipt of this Notice.
This period may be extended by written request for good cause. Once the inadequacies
identified herein have been addressed in your amended procedures, this enforcement action
will be closed.
It is requested (not mandated) that XTO Energy Inc. maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision
of plans, procedures) and submit the total to Dennis Hinnah, Deputy Director, Western
Region, Pipeline and Hazardous Materials Safety Administration. In correspondence
concerning this matter, please refer to CPF 5-2012-6016M and send all documents to our
2



office at 188 W. Northern Lights Blvd., Suite 520, Anchorage, AK 99503. For each
document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Dennis Hinnah
Deputy Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 B. Flanders (#139754)
Richard Golemon, XTO DOT Compliance Coordinator
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
3

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520126016M>
- Source ID: `phmsa-enforcement`
- SHA-256: `15accb82e64bfc3ee75929582c56dda2b319d1909194f515287e81f05a5df3ff`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-22T11:17:05.212Z
- Document slug: `phmsa-enforcement-520126016m`

### Source metadata

```json
{
  "cpf": "520126016M",
  "operator": "XTO ENERGY INC",
  "region": "Western",
  "pipelineType": "INTRASTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.440(b)",
    "195.440(d)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "520126016M_closure letter_03122013.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520126016M/520126016M_closure%20letter_03122013.pdf",
      "bytes": 264895,
      "category": "agency_document"
    },
    {
      "name": "520126016M_closure letter_03122013_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520126016M/520126016M_closure%20letter_03122013_text.pdf",
      "bytes": 4610,
      "category": "agency_document"
    },
    {
      "name": "520126016M_notice of amendment_10242012.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520126016M/520126016M_notice%20of%20amendment_10242012.pdf",
      "bytes": 62287,
      "category": "agency_document"
    },
    {
      "name": "520126016M_notice of amendment_10242012_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520126016M/520126016M_notice%20of%20amendment_10242012_text.pdf",
      "bytes": 11026,
      "category": "agency_document"
    },
    {
      "name": "520126016M_operator response_11162012.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520126016M/520126016M_operator%20response_11162012.pdf",
      "bytes": 941676,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "XTO ENERGY INC"
}
```