# GREKA — Notice of Amendment

**Citation:** CPF 520130006M  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2013-04-26

CLOSED notice of amendment citing 192.616(c).

## Document text

Notice of Amendment involving GREKA. PHMSA's enforcement data identifies the cited regulation as 192.616(c). The case was opened on 2013-04-26 and is reported as closed as of 2013-09-10. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520130006M_closure letter_09102013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520130006M/520130006M_closure%20letter_09102013.pdf

520130006M_closure letter_09102013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520130006M/520130006M_closure%20letter_09102013_text.pdf

520130006M_notice of amendment_04262013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520130006M/520130006M_notice%20of%20amendment_04262013.pdf

520130006M_notice of amendment_04262013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520130006M/520130006M_notice%20of%20amendment_04262013_text.pdf

520130006M_Operator Response_07152013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520130006M/520130006M_Operator%20Response_07152013.pdf

520130006M_notice of amendment_04262013_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
April 26, 2013
Mr. Andrew DeVegvar
President
Greka Energy
2617 E. Clarke Road
Santa Maria, CA 93454
CPF 5-2013-0006M
Dear Mr. DeVegvar:
On November 14, 2012, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected Greka
Energy’s procedures for their Public Awareness Program in Santa Maria, California.
On the basis of the inspection, PHMSA has identified the apparent inadequacies found within Greka
Energy’s Public Awareness procedures, as described below:
1. § 192.616 Public awareness
(c) The operator must follow the general program recommendations, including baseline
and supplemental requirements of API RP 1162, unless the operator provides justification
in its program or procedural manual as to why compliance with all or certain provisions of
the recommended practice is not practicable and not necessary for safety.
The Greka Energy Public Awareness Program did not include a statement of management support as
required by API RP 1162 Section 2.5.
2. § 192.616 Public awareness
(c) The operator must follow the general program recommendations, including baseline and
supplemental requirements of API RP 1162, unless the operator provides justification in its
program or procedural manual as to why compliance with all or certain provisions of the
recommended practice is not practicable and not necessary for safety.



The Greka Energy Public Awareness Program did not specify a process that specifies the frequency
for assessment intervals and an effectiveness evaluation.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed as part
of this Notice is a document entitled Response Options for Pipeline Operators in Compliance
Proceedings. Please refer to this document and note the response options. Be advised that all
material you submit in response to this enforcement action is subject to being made publicly
available. If you believe that any portion of your responsive material qualifies for confidential
treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a
second copy of the document with the portions you believe qualify for confidential treatment
redacted and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. 552(b). If you do not respond within 30 days of receipt of this Notice, this
constitutes a waiver of your right to contest the allegations in this Notice and authorizes the Associate
Administrator for Pipeline Safety to find facts as alleged in this Notice without further notice to you
and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in this
Notice, you may be ordered to amend your plans or procedures to correct the inadequacies (49 C.F.R.
§ 190.237). If you are not contesting this Notice, we propose that you submit your amended
procedures to my office within 30 days of receipt of this Notice. This period may be extended by
written request for good cause. Once the inadequacies identified herein have been addressed in your
amended procedures, this enforcement action will be closed.
It is requested (not mandated) that Greka Energy maintain documentation of the safety improvement
costs associated with fulfilling this Notice of Amendment procedures and submit the total to Chris
Hoidal, Director, Western Region, Pipeline and Hazardous Materials Safety Administration. In
correspondence concerning this matter, please refer to CPF 5-2013-0006M and, for each document
you submit, please provide a copy in electronic format whenever possible.
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
cc: PHP-60 Compliance Registry
PHP-500 P. Nguyen (#138737)
2

520130006M_closure letter_09102013_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
September 10, 2013
Mr. Andrew DeVegvar
President
Greka Energy
2617 E. Clarke Road
Santa Maria, CA 93454
CPF 5-2013-0006M
Dear Mr. DeVegvar:
On November 14, 2012, a representative from the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, inspected Greka
Energy’s procedures for their Public Awareness Program in Santa Maria, California. As a result
of the inspection, Greka Energy was issued a Notice of Amendment on April 26, 2013, which
proposed amendment of your procedures.
Greka Energy submitted its amended procedures on July 15, 2013. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
Cc: PHP-60 Compliance Registry
PHP-500 P. Nguyen (#138737)

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520130006M>
- Source ID: `phmsa-enforcement`
- SHA-256: `dcd3864bfc1f83bd25d7d9a23e3da2639f067b77624fbd51d64adc1388886605`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-23T12:51:16.325Z
- Document slug: `phmsa-enforcement-520130006m`

### Source metadata

```json
{
  "cpf": "520130006M",
  "operator": "GREKA",
  "region": "Western",
  "pipelineType": "GAS INTRASTATE ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "192.616(c)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "520130006M_closure letter_09102013.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520130006M/520130006M_closure%20letter_09102013.pdf",
      "bytes": 21521,
      "category": "agency_document"
    },
    {
      "name": "520130006M_closure letter_09102013_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520130006M/520130006M_closure%20letter_09102013_text.pdf",
      "bytes": 4553,
      "category": "agency_document"
    },
    {
      "name": "520130006M_notice of amendment_04262013.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520130006M/520130006M_notice%20of%20amendment_04262013.pdf",
      "bytes": 41324,
      "category": "agency_document"
    },
    {
      "name": "520130006M_notice of amendment_04262013_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520130006M/520130006M_notice%20of%20amendment_04262013_text.pdf",
      "bytes": 11609,
      "category": "agency_document"
    },
    {
      "name": "520130006M_Operator Response_07152013.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520130006M/520130006M_Operator%20Response_07152013.pdf",
      "bytes": 111370,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "GREKA"
}
```