# TESORO LOGISTICS NORTHWEST PIPELINE LLC — Notice of Amendment

**Citation:** CPF 520155005M  
**Type / status:** enforcement / historical  
**Agency:** Pipeline and Hazardous Materials Safety Administration  
**Effective:** Not stated  
**Published:** 2015-02-25

CLOSED notice of amendment citing 195.402(c)(3).

## Document text

Notice of Amendment involving TESORO LOGISTICS NORTHWEST PIPELINE LLC. PHMSA's enforcement data identifies the cited regulation as 195.402(c)(3). The case was opened on 2015-02-25 and is reported as closed as of 2015-04-01. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

520155005M_closure letter_04012015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520155005M/520155005M_closure%20letter_04012015.pdf

520155005M_closure letter_04012015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520155005M/520155005M_closure%20letter_04012015_text.pdf

520155005M_notice of amendment_02252015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520155005M/520155005M_notice%20of%20amendment_02252015.pdf

520155005M_notice of amendment_02252015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520155005M/520155005M_notice%20of%20amendment_02252015_text.pdf

520155005M_Operator Response to Notice Letter_03272015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/520155005M/520155005M_Operator%20Response%20to%20Notice%20Letter_03272015.pdf

520155005M_notice of amendment_02252015_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
February 25, 2015
Mr. Rick Weyen
Vice President, Logistics
Tesoro Logistics GP, LLC
19100 Ridgewood Parkway
San Antonio, TX 78259
CPF 5-2015-5005M
Dear Mr. Weyen:
On July 21-24, 2014, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected
Tesoro Logistics GP, LLC procedures for the Northwest Products tank facility in Pasco,
Washington.
On the basis of the inspection, PHMSA has identified the apparent inadequacy found within
Tesoro Logistics GP, LLC plans or procedures, as described below:
1. § 195.402 Procedural manual for operations, maintenance, and emergencies.
(c) Maintenance and normal operations. The manual required by paragraph (a)
of this section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.



At the time of the inspection, Tesoro Logistics GP, LLC procedures did not fully address the
requirements of Subpart H. Specifically, the procedures did not address § 195.405(a) of
Subpart H. Regulation § 195.405(a) states, “After October 2, 2000, protection provided
against ignitions arising out of static electricity, lightning, and stray currents during operation
and maintenance activities involving aboveground breakout tanks must be in accordance with
API Recommended Practice 2003, unless the operator notes in the procedural manual (§
195.402(c)) why compliance with all or certain provisions of API Recommended Practice
2003 is not necessary for the safety of a particular breakout tank.” Tesoro Logistics GP, LLC
neither included reference to API Recommended Practice 2003, nor note why compliance
with all or certain provisions of API Recommended Practice 2003 is not necessary for the
safety of a particular breakout tank or tank farm.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed
as part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies
for confidential treatment under 5 U.S.C. 552(b), along with the complete original document
you must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted
information qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not respond
within 30 days of receipt of this Notice, this constitutes a waiver of your right to contest the
allegations in this Notice and authorizes the Associate Administrator for Pipeline Safety to
find facts as alleged in this Notice without further notice to you and to issue a Final Order.
If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in
this Notice, you may be ordered to amend your plans or procedures to correct the
inadequacies (49 C.F.R. § 190.237). If you are not contesting this Notice, we propose that
you submit your amended procedures to my office within 30 days of receipt of this Notice.
This period may be extended by written request for good cause. Once the inadequacies
identified herein have been addressed in your amended procedures, this enforcement action
will be closed.
It is requested (not mandated) that Tesoro Logistics GP, LLC maintain documentation of the
safety improvement costs associated with fulfilling this Notice of Amendment
(preparation/revision of plans, procedures) and submit the total to Chris Hoidal, Director,
Western Region, Pipeline and Hazardous Materials Safety Administration. In correspondence
concerning this matter, please refer to CPF 5-2015-5005M and, for each document you
submit, please provide a copy in electronic format whenever possible.
2



Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Compliance Proceedings
cc: PHP-60 Compliance Registry
PHP-500 D. Mulligan
Activity #148281 (IO5)
3

520155005M_closure letter_04012015_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
April 1, 2015
Mr. Rick Weyen
Vice President, Logistics
Tesoro Logistics GP, LLC
19100 Ridgewood Parkway
San Antonio, TX 78259
CPF 5-2015-5005M
Case Closure
Dear Mr. Weyen:
On July 21-24, 2014, a representative from the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, inspected Tesoro
Logistics GP, LLC procedures for the Northwest Products tank facility in Pasco, Washington. As a
result of the inspection, Tesoro Logistics GP, LLC was issued a Notice of Amendment on February
25, 2015, which proposed amendment of your procedures.
Tesoro Logistics GP, LLC submitted its amended procedures on March 27, 2015. My staff reviewed
the amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you for
your cooperation.
Sincerely,
Chris Hoidal
Director, Western Region
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 D. Mulligan
Activity #148281 (IO5)

## Provenance

- Official: Yes
- Source: <https://primis.phmsa.dot.gov/enforcement-data/case/520155005M>
- Source ID: `phmsa-enforcement`
- SHA-256: `14fad36134383e8f3d54b2dc47fb78138f4a2664311292a709cb8f3c8b9c200f`
- Retrieved: 2026-08-20T04:44:44.458Z
- Exported: 2026-08-23T20:51:49.247Z
- Document slug: `phmsa-enforcement-520155005m`

### Source metadata

```json
{
  "cpf": "520155005M",
  "operator": "TESORO LOGISTICS NORTHWEST PIPELINE LLC",
  "region": "Western",
  "pipelineType": "INTERSTATE LIQUID ONSHORE",
  "caseStatus": "CLOSED",
  "citedSections": [
    "195.402(c)(3)"
  ],
  "dataAsOf": "08/04/2026 12PM",
  "caseDataAsOf": "2026-08-04",
  "attachmentCount": 5,
  "attachments": [
    {
      "name": "520155005M_closure letter_04012015.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520155005M/520155005M_closure%20letter_04012015.pdf",
      "bytes": 27871,
      "category": "agency_document"
    },
    {
      "name": "520155005M_closure letter_04012015_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520155005M/520155005M_closure%20letter_04012015_text.pdf",
      "bytes": 4891,
      "category": "agency_document"
    },
    {
      "name": "520155005M_notice of amendment_02252015.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520155005M/520155005M_notice%20of%20amendment_02252015.pdf",
      "bytes": 67359,
      "category": "agency_document"
    },
    {
      "name": "520155005M_notice of amendment_02252015_text.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520155005M/520155005M_notice%20of%20amendment_02252015_text.pdf",
      "bytes": 10631,
      "category": "agency_document"
    },
    {
      "name": "520155005M_Operator Response to Notice Letter_03272015.pdf",
      "url": "https://primis.phmsa.dot.gov/enforcement-documents/520155005M/520155005M_Operator%20Response%20to%20Notice%20Letter_03272015.pdf",
      "bytes": 91275,
      "category": "party_submission"
    }
  ],
  "extractedAgencyDocumentCount": 2,
  "attachmentPolicy": "Official attachment links are retained. Agency-issued documents may also include a verified local PDF and page-level text representation.",
  "jurisdiction": "US",
  "operatorName": "TESORO LOGISTICS NORTHWEST PIPELINE LLC"
}
```